Gas Interconnection Poland–Lithuania

From Wikipedia, the free encyclopedia
Gas Interconnection Poland–Lithuania
Map of Lithuania Poland Pipeline.png
Map of Gas Interconnection Poland–Lithuania
Location
CountryLithuania
Poland
Coordinates54°57′44″N 24°59′52″E / 54.96222°N 24.99778°E / 54.96222; 24.99778Coordinates: 54°57′44″N 24°59′52″E / 54.96222°N 24.99778°E / 54.96222; 24.99778
From, Poland
Passes throughLithuania–Poland border
ToJauniūnai, Širvintos DM, Lithuania
General information
TypeNatural gas
PartnersAmber Grid
Gaz-System
Construction startedJanuary 2020
ExpectedMay 2022[1]
Technical information
Length508 km (316 mi)
Maximum discharge2.3 billion cubic metres per annum (81×10^9 cu ft/a)
Diameter700 mm (28 in)
Compressor stationsJauniūnai natural gas compression station

Gas Interconnection Poland–Lithuania (GIPL) is a gas pipeline between Poland and Lithuania. Natural gas will be able to flow in both directions. The project is being implemented by gas transmission system operators AB Amber Grid (Lithuania) and Gaz-System SA (Poland). The construction of the gas pipeline is due to start in October 2019. It is projected that the pipeline will be ready for operation in May 2022.[1] The planned length of the pipeline is 508 km (316 mi). The pipeline will run from Jauniūnai Gas Compressor Station (GCS) in eastern Lithuania to the Hołowczyce GCS station in eastern Poland.

With the completion of GIPL, Lithuania together with the other two Baltic states and Finland will be integrated into the European Union (EU) gas transmission system. The estimated value of the project is €500 million. The project is financed by Gaz-System and Amber Grid, and co-financed with significant grant from EU funds. Part of the investments in Poland is compensated by the Baltic states.

History[]

GIPL in Lithuania's major pipelines system (red)

Although the idea of gas interconnection between Poland and Lithuania can be traced as early as 1992,[2] more active preparatory works started in 2008–2009. Poland at that time considered other interconnection with neighbouring states and construction of LNG terminal in Swinoujscie. During these years the first study on how it would be possible to connect Polish and Lithuanian gas networks was implemented.[3]

From 2011 to 2013, a business case analysis and feasibility study was performed. On 5 November 2014, part of the project in the territory of Lithuania was recognised as an important economic project for the state. On 11 November 2014 the European Commission decided to fund the project with €306 million through the Connecting Europe Facility fund. [4] Before that in August 2014 the EU Agency for the Cooperation of Energy Regulators (ACER) at the request of project promoters took a decision on cross-border cost allocation between Poland, Lithuania, Latvia and Estonia.

On 29 August 2015, environmental impact assessment procedures for GIPL in the territory of Lithuania were finalized.

At first, the route of GIPL was planned to connect Rembelszczyzna GCS, which is located near Warsaw, to Jauniūnai GCS, but in 2016 Poland informed Lithuania on difficulties with the needed extension of Rembelszczyzna GCS and proposed an alternative routing of GIPL to connect Jauniūnai GCS with Hołowczyce GCS, which is near the Belarussian border. The change stipulated a shorter route and lower investments into infrastructure.[5]

On 27 September 2016, all permissions for the part of the GIPL project on Lithuanian territory were obtained. In May 2018 natural gas transmission system operators of Poland, Lithuania, Latvia and Estonia signed agreement detailing the procedures on how ACER decision on GIPL cross-border cost allocation should be implemented.

In the summer of 2018, Amber Grid announced procurement of the construction and gas pipes supply (in Lithuanian territory).

In 2019, June it was announced that steel pipes would be provided by Polish company Izostal.[6] In July 2019 company Alvora together with partner Šiaulių dujotiekio statyba were chosen as contractors for GIPL construction in Lithuanian territory.[7]

In February 2022, Amber Grid announced that the commercial operation with limited capacity will start 1 May 2022. The full capacity will be available from October 2022 onwards.[1]

Technical details[]

Construction of the gas interconnection in 2020.

The planned length of GIPL is 508 km (316 mi), the diameter of pipes is 700 mm (28 in).[8] Gas pipeline will stretch from Jauniūnai GCS in Lithuania to Hołowczyce GCS in Poland. The length of the pipeline in Poland preliminary will amount to 343 km (213 mi), in Lithuania – to around 165 km (103 mi). The interconnection capacity from Poland to Lithuania is planned to reach 27 TWh/year or 2.4 bcm/year.[8] From Lithuania to Poland the interconnection capacity will be 21 TWh/year or 1.9 bcm/year.[8] The design pressure in Poland territory will be 8.4 MPa, in Lithuania territory – 5.4 MPa.

Price and financing[]

Altogether the price of GIPL project is planned to be around 500 million euros. The project is co-financing with EU Connecting Europe Facility developments funds worth 306 million euros.

According to a decision of the EU Agency for the Cooperation of Energy Regulators (ACER), the Baltic countries should cover €86 million of Poland's costs in the project. Lithuania is to pay €55 million of that, Latvia €29 million, and Estonia €1.5 million.

Significance[]

At the moment Baltic countries and Finland can only receive pipeline gas from Russia.[9] The only access to alternative gas sources and suppliers in the region is liquified natural gas import with FSRU Independence, which started operating in 2014, in Klaipėda, Lithuania. When GIPL is commissioned, Baltic countries and Finland will be integrated into the EU gas transmission network. The Baltic region will have access to more alternative gas sources with enhanced security of supply and competition.[9] It is estimated that GIPL capacities will be able to satisfy more than 40 percent of annual natural gas demand in Baltic countries and Finland.[10]

The European Commission has recognised GIPL project as a Project of Common Interest (PCI).[11]

See also[]

References[]

  1. ^ a b c "Natural Gas Transmission System Operator". www.ambergrid.lt. Retrieved 28 February 2022.
  2. ^ "Konsulinė konvencija tarp Lietuvos Respublikos ir Lenkijos Respublikos".
  3. ^ "BEMIP iniciatyva".
  4. ^ "Lenkijos ir Lietuvos dujotiekių jungties statybos finansavimui gauta išankstinė ES parama".
  5. ^ "Užtruks ilgiau, gal bus pigiau: keičiama dujotiekio į Lenkiją trasa".
  6. ^ "Vamzdžius Lietuvos–Lenkijos dujotiekiui tieks Lenkijos "Izostal"".
  7. ^ "Lietuvos-Lenkijos dujotiekį turėtų tiesti "Alvora" su "Šiaulių dujotiekio statyba"".
  8. ^ a b c "Suvirinta GIPL dujotiekio auksinė siūlė žymi Lietuvos ir Lenkijos dujų perdavimo sistemų sujungimą". Amber Grid (in Lithuanian). Retrieved 11 December 2021.
  9. ^ a b "Dujotiekio su Lenkija statyboms uždegta žalia šviesa".
  10. ^ "Amber Grid GIPL".
  11. ^ "First gas interconnector Poland – Lithuania ends energy isolation of the Baltic States".
Retrieved from ""