Gold Line (Capital Metro)
This article needs additional citations for verification. (November 2020) |
Gold Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | In planning | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Austin, Texas | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Highland station South Congress Transit Center | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Bus rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Capital MetroRapid | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Capital Metropolitan Transportation Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 9.5 mi (15.3 km) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Gold Line is a proposed transitway for connecting North Central Austin and the Downtown's Eastside to South Austin. It is in the planning stages as a part of Capital Metro's Project Connect. According to the plan, the line will be initially be operated as a bus rapid transit line prior to future conversion to light rail.[1] It is estimated to open in 2024.[1][2]
The initial line is 9.5 miles (15.3 km) in length and would operate from ACC Highland to the South Congress Transit Center park-and-ride, and will travel on Airport, Red River, San Jacinto/Trinity, 7th/8th, Neches/Red River, 4th, Riverside, and South Congress. Stations will be ACC Highland, Clarkson, Hancock, St. David's, UT East, Medical School, Capitol East, Trinity, Downtown Station (where transfer to the Red, Green, or Blue Lines will be possible), Republic Square, Auditorium Shores, SoCo (South Congress), Oltorf, St. Edward's, and South Congress Transit Center.[3]
The line was originally envisioned as the northern section of the Blue Line light rail, which was part of the city's failed 2014 rail plan.[1] The line was there after planned to be built as lower-cost bus rapid transit. The project shifted planning in May 2020 to again construct it as light rail, citing a demographic that showed an increased projected ridership along the route.[4] In July 2020, to lower construction costs in response to the economic crisis caused by the COVID-19 pandemic, the plan was reverted to the line being constructed as a bus service.[5]
References[]
- ^ a b c Clark-Madison, Mike (25 September 2020). "From Light Rail to a Downtown Tunnel: The Parts of Project Connect". Austin Chronicle. Retrieved 5 November 2020.
- ^ Flagler, Jack (28 January 2021). "As Project Connect moves through early stages, bus lines could begin construction in fall". Austin Community Impact. Retrieved 13 February 2021.
- ^ (PDF) https://capmetro.org/uploadedFiles/New2016/ProjectConnect_Vision/Home/PC_ServiceLevelMap.pdf. Missing or empty
|title=
(help)[dead link] - ^ Salazar, Daniel (May 11, 2020). "Third train line proposed in Project Connect mass transit plan for Austin". Retrieved November 5, 2020.
- ^ Willson, Bill (23 July 2020). "Part of Cap Metro's show-stopping transit plan gets the hook". RT&S. Retrieved 27 July 2020.
External links[]
- Bus rapid transit in Texas
- Transportation in Austin, Texas
- Transportation in Travis County, Texas
- Capital Metro
- Proposed railway lines in Texas
- Texas transportation stubs