Guǎnzhuang station

From Wikipedia, the free encyclopedia
Guǎnzhuang[1]

管庄
Beijing Subway
Westbound platform of Guaanzhuang Station (20210222185602).jpg
Westbound platform
General information
LocationGuanzhuang, Chaoyang District, Beijing
China
Coordinates39°54′33″N 116°35′56″E / 39.9092°N 116.5990°E / 39.9092; 116.5990Coordinates: 39°54′33″N 116°35′56″E / 39.9092°N 116.5990°E / 39.9092; 116.5990
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Batong line (through operation to Line 1)
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeElevated
Disabled accessYes
Other information
Station codeBT06
History
OpenedDecember 27, 2003
Services
Preceding station   Beijing Subway   Following station
towards Sihui
Batong line (through operation to Line 1)
Location
Guǎnzhuang[1] is located in Beijing
Guǎnzhuang[1]
Guǎnzhuang[1]
Location in Beijing

Guǎnzhuang station[1] (simplified Chinese: 管庄站; traditional Chinese: 管莊站; pinyin: Guǎnzhuāng zhàn) is a station on the Batong line (through operation to Line 1) of the Beijing Subway, and is located in the Guanzhuang area (管庄地区) of Chaoyang District.

In future, it will be a transfer station with Line 22 (Pinggu line) which is currently under construction.

History[]

Guǎnzhuang Station before the installation of platform screen doors

Guǎnzhuang station opened on December 27, 2003. The installation of automatic platform gates started on August 9, 2012,[2] and finished on September 2012.[3]

Name conflict[]

This station had the same English name as a station on Line 15, also part of the Beijing Subway system. In Chinese this is not a problem as the station on Line 15 is called and one on the Batong Line is called , but the government policy in China is to create English names from the pinyin transliteration of Chinese language, but without the tone markers; thus 关庄 (Guānzhuāng) and 管庄 (Guǎnzhuāng) are both rendered as Guanzhuang, making them look identical.

In December 2019, the 管庄 (Guǎnzhuāng) station on Batong line changed spelling to Guaanzhuang.[4] However, in December 2021, both 关庄 and 管庄 were changed to Guānzhuang and Guǎnzhuang respectively.[1]

Guǎnzhuang Station (bottom), taken from Tongzhou district.

Station layout[]

The station has 2 elevated side platforms.

Exits[]

There are 6 exits, lettered A1, A2, A3, A4, B1, and B2. Exits B1 and B2 are accessible.

References[]

  1. ^ a b c "北京9段新地铁今天开通!线路图、新站抢先看". Retrieved 2021-12-31.
  2. ^ (Chinese) 13号线、八通线加装屏蔽门工程试点站已于近日开工. Beijing Subway. Retrieved September 15, 2012.
  3. ^ (Chinese) 八通线、13号线试点站屏蔽门安装主体工程完工. Beijing Subway. September 28, 2012. Retrieved November 8, 2012.
  4. ^ "JPG格式线路图下载". 北京地铁官方网站. Retrieved 2019-12-27.
Retrieved from ""