Interstate 69 in Indiana

From Wikipedia, the free encyclopedia

Interstate 69 marker
Interstate 69
Current portions of I-69 in red; future portions of I-69 in pink[a]
Route information
Maintained by INDOT
Length314.822 mi[1] (506.657 km)
Existed1956–present
Southern segment
Length134 mi[1] (216 km)
South end US 41 in Evansville
Major
junctions
North end SR 37 near Martinsville
Original segment
Length157.824 mi[1] (253.993 km)
South end I-465 / US 31 / US 52 / US 421 / SR 37 in Indianapolis
Major
junctions
North end I-69 at Michigan state line
Location
Counties(From South to North)
Vanderburgh, Warrick, Gibson, Pike, Daviess, Greene, Monroe, Morgan, Marion, Hamilton, Madison, Delaware, Grant, Huntington, Wells, Allen, DeKalb, Steuben
Highway system
  • Interstate Highway System
SR 68 SR 69

Interstate 69 (I-69) currently has two discontinuous segments of freeway in the U.S. state of Indiana. The original 157.3-mile-long (253.1 km) highway, completed in November 1971, runs northeasterly from the state capital of Indianapolis, to the city of Fort Wayne, and then proceeds north to the state of Michigan (reaching its capital city, Lansing and beyond). This original section is also known as Segment of Independent Utility (SIU) 1 in the national plan for expansion of I-69.

At present, the 134-mile (216 km) segment in Southwest Indiana temporarily begins at the interchange with U.S. Highway 41 (US 41) and Veterans Memorial Parkway in Evansville and as of 18 September 2018 temporarily ends just south of State Road 39 (SR 39) near Martinsville.[2] Between I-64 and Bloomington four new terrain sections have opened in phases in 2009, 2012, and 2015 as part of the planned national extension of I-69 southwest from Indianapolis via Paducah, Memphis, Shreveport, and Houston to the international border with Mexico in Texas. The portion of I-69 between US 41 and I-64 is also known as the Robert D. Orr Highway[citation needed] and originally was designated I-164.[3]

Route description[]

Interstate 69 in Indiana north of the US 35 interchange

The northern stretch of I-69 in Indiana begins with an interchange at the northeast corner of I-465, the Indianapolis outer beltway, where Binford Boulevard, a four-lane divided surface arterial that formerly carried SR 37, transitions into the I-69 freeway. Southbound at this junction, most I-69 motorists take exit 200, which was formerly known as exit 0, to remain on a freeway and reach either I-465 south (with SR 37 south and the likely routing of future extended I-69) or I-465 west. Running in a northeasterly direction and concurrent with SR 37, I-69 turns east-northeast at the end of that overlap just past mile marker 205 (formerly marker 5) in Fishers. From there, the freeway turns more easterly through the Campus Parkway/Southeastern Parkway (former Greenfield Avenue and SR 238) interchange and remains on that general heading until it reaches the Pendleton area.

After bypassing Pendleton to the west and north, SR 9 and SR 67 join I-69, which continues to the east-northeast into the Anderson area. There, SR 9 departs, and shortly thereafter I-69 begins two long curves to the northeast, and then the north. Between Daleville and Chesterfield, SR 67 departs I-69, bound for Muncie. From the Anderson–Muncie region, I-69 continues north, running concurrently with US 35 between SR 28 east of Alexandria and SR 22 near Gas City. After passing SR 18 east of Marion, I-69 then heads more northeast, straight toward the Fort Wayne metro area.

At the south junction of I-469, located at Lafayette Center Road near the General Motors truck assembly plant, US 33 joins I-69. US 24 used to be cosigned with I-69 from this point to the interchange at Jefferson Boulevard (originally known as Upper Huntington Road), even though it took travelers on that route several miles out of their way. However, in the mid-2010s, INDOT rerouted and resigned US 24 from its junction with I-469 in New Haven to use the northern leg of that beltway (concurrent with westbound US 30) to I-69, then south on the parent Interstate route to the aforementioned Jefferson Boulevard interchange. Now, eastbound US 24 joins northbound I-69 and US 33 there. US 33 continues on north to the Goshen Road interchange near Coliseum Boulevard on the northwest side of Fort Wayne, where it departs I-69, eastbound US 30 joins, and the freeway curves more to the east once again. The next junction is the US 27/SR 3 interchange at Lima Road on the north side of Fort Wayne. From the mid-1960s to 2001, US 27 was rerouted onto a concurrency with I-69 from here north to the Michigan border, but the route was thereafter truncated to this point as its national northern terminus. Past the next interchange at Coldwater Road, which was the original routing of US 27 north of town, the I-69 freeway curves back to a northerly heading. At the north junction of I-469, both US 30 and the present routing of US 24 now depart to the east along that beltway and shortly thereafter I-69 leaves the Fort Wayne metro area.

I-69 then continues north, passing just to the west of Auburn, Waterloo, and Angola, before reaching the I-80/90 Indiana East–West Toll Road near Fremont. Very shortly thereafter, the route crosses into the state of Michigan at a point just northwest of Fremont.

The southern stretch begins at an interchange with U.S. 41, briefly heading east then gradually curving to the north, bypassing downtown Evansville. Continuing through greater Bloomington, I-69 temporarily ends at a concurrency with S.R. 37 just south of S.R. 39.

The portion of I-69 between Indianapolis and the Toll Road was first proposed in the seminal report Interregional Highways, released in January 1944. By March 1946, it was formally made part of the new National System of Interstate Highways by the U.S. Public Roads Administration. In 1958, its first extension was approved.[4] This took the route into Michigan in order to connect with I-94 near Marshall. It was extended yet again, north to Lansing in the 1960s, and then east—first to Flint and finally to the border with Canada at Port Huron, Michigan—in the 1980s. The extreme southern portion of I-69 from I-465 to central Indianapolis was never built, though unpaved ghost ramps and overpasses for its connection to I-65 and I-70 can still be seen at the North Split/Spaghetti Bowl interchange just northeast of downtown Indy.

Configuration[]

Previously, all of I-69 in Indiana north of the Indianapolis metro area was four lanes, but INDOT has reconstructed and widened I-69 to six lanes through most of the Fort Wayne metro area by adding a travel lane in the median for each direction.

Likewise, INDOT has widened I-69 from I-465 on the northeast side of Indianapolis to 116th Street/SR 37 in Fishers from the original six to eight through lanes, with additional auxiliary lanes between interchanges. A project to add a third travel lane in the median for each direction between 116th Street/SR 37 and SR 38 near Pendleton, as well as to completely rebuild the Campus Parkway/Southeastern Parkway junction (Exit 210) as a Divergent Diamond Interchange (DDI) without necessitating its closure to traffic, began in 2016 and was completed in early 2018. As part of the Next Level Roads initiative, INDOT began a project in mid-2018 to extend the 6-lane section north from Pendleton to SR 9 in Anderson and to rehab the existing 4-lanes of pavement from there to the junction of SR 67 and SR 32 near Daleville.[5]

Services[]

Originally, there were seven rest areas and two weigh stations located along the original length of I-69 in Indiana. Of those, only four rest areas and one weigh station remain open at present. The Pipe Creek Rest Areas serve northbound and southbound travelers in Delaware County near mile marker 250 (formerly marker 50). Totally rebuilt in 2008, these areas also serve motorists on US 35, which is concurrent with I-69 along this stretch of freeway.[6][7] Near mile marker 280 (formerly marker 80) in Huntington County, there were originally twin weigh stations for commercial vehicles; however, only the southbound facility is still used. Also in Huntington County, the northbound Flat Creek Rest Area once served those heading north near original mile marker 89 (now marker 289), but joined its southbound companion (which had closed in January 2009 and was located a couple miles to the north in Wells County, just south of the Wells–Allen county line near original mile marker 92) on the list of permanently closed rest stops by late 2012.[8] These areas were closed due to their age, cost of maintenance and operation, as well as their relative proximity to the Fort Wayne metro area. Two other rest areas just north of that city in DeKalb County were also closed by 2001 for similar reasons.[citation needed] There the twin Cedar Creek Rest Areas once served northbound and southbound traffic near original mile marker 123 (now marker 323). In July 2011 it was reported that INDOT had begun building a new northbound facility at that location.[9] In November 2012, it replaced the aforementioned Flat Creek northbound rest area further to the south, which closed upon completion of this new facility at the Cedar Creek site. Finally, between Fort Wayne and the Michigan state line the Pigeon Creek Welcome Center serves southbound motorists in Steuben County near mile marker 345 (formerly marker 145).[10]

At present there are no rest stops or weigh stations on the southern segment.

History[]

Pre-construction (1940s–1950s)[]

In the 1944 study titled Interregional Highways and again, in 1947 when the original Interstate routes were first officially designated, I-69 had its northern terminus listed as the Indiana East–West Toll Road. But in 1956, highway officials of the state of Michigan approached their Indiana counterparts about extending I-69 north from the Toll Road and into their state along the route of US 27 to reach the proposed I-94 near Marshall. After some further studies, both states requested this change and the U.S. Bureau of Public Roads (BPR) approved their proposal on January 21, 1958, making the Michigan state line the new northern terminus of I-69 in Indiana and moving its national terminus permanently into the Wolverine State.[11]

The original southern termination point of I-69 was to have been located at the northeast corner of the inner loop (now known locally as the I-65/I-70 "North Split" interchange) near 13th and College Avenue in Indianapolis. Preliminary routing of the highway from SR 38 near Pendleton to Indianapolis had it generally following the SR 67 corridor southwest, joining I-70 near German Church Road on the east side of Marion County, where the two routes would then be cosigned into the city. Later route location studies in 1961 recommended a different path, heading generally west from Pendleton to SR 37 near Fishers, then southwest past the Indianapolis outer beltway concurrent with the new location of that state route (now known as Binford Boulevard). Once well into the city, it would turn south to cross Fall Creek and meet up with the inner loop at its northeast corner.[11] In fact, the grading and overpasses for this never-built connection's ramps can still be seen at that location.

However, in 1962 the BPR ruled that it would only approve funding for I-69 to be built to the first Interstate highway connection in the Indianapolis area, which was the I-465 outer beltway near Castleton. State officials later sought to designate the proposed Northeast Freeway connecting that I-69/I-465 interchange to the North Split interchange, approximately 11 miles (18 km) in length, as I-165 in order to get around this initial ruling. But after a political fight over the inner-city portions of I-70 and I-65 (part of the national freeway revolt), it was eventually decided in the late 1970s to scrap the Northeast Freeway altogether. In its place, the state was allowed to use federal funds to widen I-70 from its original six lanes to eight and ten lanes as well as to rework its east side interchange with I-465 in order to handle the additional traffic loads from I-69 and the northeastern suburbs it serves.[11]

Construction (1960s–1970s)[]

Like all Interstate highways in Indiana, the original I-69 was constructed in segments which when all were complete, made up the route that exists today. There were eleven segments in the federally approved original route between I-465 in the Castleton neighborhood of northeastern Indianapolis and the Michigan state line.[12]

The first section of I-69 to be completed in Indiana was the 10.16-mile (16.35 km) stretch in Allen County around the west and north sides of Fort Wayne between the former Upper Huntington Road (now Jefferson Boulevard), which then carried US 24 and SR 37, and Coldwater Road, which at the time was US 27 (later SR 327, but now neither). This initial portion of I-69 freeway opened to traffic on October 23, 1962. The eleventh and final segment (of the original route) to be completed was the 5.05-mile (8.13 km) stretch between the north leg of I-465 in Indy and the split with SR 37 at Fishers, which fully opened to traffic on November 16, 1971.[12]

Expansion on a national scale (1990s and beyond)[]

Long after the route's original completion, I-69 was divided into a number of sections of independent utility (SIUs) dealing with a proposed extension of the freeway to the Mexican border in Texas. The original 157.30-mile (253.15 km) section of I-69 in Indiana in its entirety is now part of SIU 1.

When the United States Congress enacted the Intermodal Surface and Transportation Efficiency Act in the mid-1990s, it established High Priority Corridors 18 and 20. Together these corridors mandate the construction of an Interstate highway from Port Huron, Michigan to Brownsville, Texas. The new highway was designated I-69. The routing of the highway has proven to be controversial in Indiana, as it was to become a planned toll road in southern Indiana called Southern Indiana Toll Road, or SITR. After nearly 10 years of studies and close coordination between the Federal Highway Administration (FHWA), Army Corps of Engineers (CoE), Environmental Protection Agency (EPA), and the Indiana Department of Transportation (INDOT), the final route for I-69 between Indianapolis and Evansville was announced in March 2004. At that time it was still uncertain when the extension would be built, since no funds were available to construct the $1.8 billion highway. Nonetheless, the FHWA and INDOT have been extremely methodical in the environmental studies required for the SITR to be built. State and federal highway officials opted to use a two-tier environmental study along with close coordination with the CoE, the EPA, and other state and federal agencies to ensure the proposed route can withstand any legal challenge that may be brought forth by opponents. While officials have performed studies on dozens of possible alignments over the past 30 years, the most recent round of environmental studies for the SITR have been ongoing since 1992.

SIU 1[]

SIU 1 includes the entire length of I-69 in 1998, from the I-465 interchange on the northeast side of Indianapolis north to Lansing, Michigan, then east to Port Huron, Michigan. It was built in stages between 1956 and 1992, with the final gap between Charlotte, Michigan, and Lansing completed on October 22, 1992. SIU 1 also includes the Interstate 469 loop around the east side of Fort Wayne that opened in stages between 1989 and 1995. When the national I-69 extension project was conceived, SIU 1 was already long completed except for the northernmost portion of I-469 which was still under construction at the time, so all future work in this segment of the "new I-69" would be limited to mainline upgrades and operational improvements.

Post-construction improvements[]

A major project in the Fort Wayne metro area began in 2002, resulting in an additional travel lane in each direction, bridge and pavement reconstruction, and interchange reconfiguration. Plans for SIU 1 also included spot improvements and pavement rehabilitation to the I-469 loop around Fort Wayne[citation needed] and additional mainline and interchange improvements to I-69 northeast of Indianapolis.[13]

At the north end of the Fort Wayne section, a new dogbone interchange was built in 2012 at Union Chapel Road (exit 317) to serve the then-new Parkview Regional Medical Center campus, replacing an original grade separation without Interstate access at that location.

Just to the south of the Parkview complex, the junction at Dupont Road (exit 316) was rebuilt and converted into Indiana's first diverging diamond interchange (DDI) by late October 2014.[14]

On October 24, 2007, INDOT announced a $600 million plan to reconstruct the I-69/I-465 interchange on the northeast side of Indianapolis that included the widening of about eight miles (13 km) of I-69, I-465, and Binford Boulevard. Environmental studies and design work were subsequently undertaken, and construction on the I-69 portion of the project was initially expected to begin in 2012.[15] However, that portion of the plan was later severely scaled back, with the I-69/I-465/Binford Boulevard interchange still awaiting most of the planned major improvements.

In the mid 2010s, the I-69 portion of the Operation Indy Commute project addressed many of the capacity issues the 2007 plan was to have corrected, by adding two new travel lanes between 82nd Street and a rebuilt split with SR 37 as well as by adding auxiliary lanes between interchanges in this same area.[16]

In December 2015, another new plan was announced to rebuild the I-69/I-465/Binford Boulevard interchange. However, construction is not scheduled to begin until 2020.[17]

INDOT widened 14 miles (23 km) of I-69 from four to six lanes between the 116th Street/SR 37 interchange at Fishers and the SR 38/State Street interchange in Pendleton, a project that began in 2016 and was completed in early 2018.[18] This contract also included the reconstruction and conversion of the interchange at Campus Parkway/Southeastern Parkway (exit 210) into I-69's second DDI while maintaining traffic flow and full access for all directional movements.[19] As a follow-up, INDOT announced in 2018 that the six-lane section would be extended by another 8.4 miles (13.5 km), from Pendleton to SR 9 in Anderson. The $79-million contract also includes pavement rehabilitation for another 6.5 miles (10.5 km) beyond that point, to the SR 67/SR 32 interchange in Daleville.[20]

A new interchange (exit 204) at 106th Street in Fishers, constructed between April and December 2016 (with final landscaping work extending into 2017), was opened to traffic on December 7, 2016.[21] The original two-lane grade separation without I-69 access was replaced by two separate two-lane bridges over the freeway. Each bridge carries one direction of traffic in an oval-shaped roundabout that controls traffic on 106th Street and interchange ramps to and from both directions of I-69.[21][22]

SIU 2[]

Since the beginning of the I-69 extension project, people have assumed that this SIU would connect I-69 SIU 1 and SIU 3 by utilizing the eastern and southern legs of the I-465 beltway in Indianapolis. In 2021, the INDOT confirmed the routing.[23] Much of this stretch of I-465 was reconstructed during the first decade of the 2000s, with additional improvements scheduled for the 2010s, totally independent of the I-69 extension project. INDOT has strongly indicated that any concurrent signing of this route along I-465 will likely not be done until the southern (SIU 3, Section 6) portion of I-69 is connected (at new Exit 5, just west of the SR 37/Harding Street interchange on the southwest side of Indianapolis). That new system interchange, part of SIU 3's Section 6, is not presently scheduled to be completed and open to traffic until around 2024.[24] The southern leg of I-465 is the last major portion of the beltway that has yet to be widened from its original 6-lane cross-section, and is the scene of chronic traffic congestion. In conjunction with the construction of the I-69/I-465 southwest interchange at the northern end of SIU-3, several miles of I-465 between I-70 to the west and I-65 to the east will be reconstructed and widened to handle the additional traffic expected to be generated on I-465 when the last section of I-69 is completed. Scheduled to begin in 2021, and expected to be completed along with the I-69 interchange in 2024, the I-465 south project will involve a complete reconstruction and widening of I-465 from I-65 to I-70: the roadway will be reconstructed and widened to accommodate additional travel lanes; bridges and overpasses will be replaced; and interchanges at SR-67 and US-31 will be reconfigured.[25]

Proposed alternatives to I-465 routing of SIU 2[]

On November 9, 2006, Governor Mitch Daniels announced plans for a 75-mile (121 km) outer loop around Indianapolis to be known as the Indiana Commerce Connector (ICC). As proposed, that route would have been 100% privately funded, with a portion of the revenues possibly applied to constructing I-69 from Indianapolis to the Crane Naval Surface Warfare Center (NSWC). The remaining portion of the highway to Evansville, Indiana, was already funded with funds from the initiative.[26][27] Strong opposition from local residents and the then-Democratic-controlled House of Representatives forced Daniels to abandon the ICC plan on March 24, 2007, although House Democrats assured southwest Indiana residents that this decision would not affect construction on I-69 between Indianapolis and the Crane NSWC.[28][29]

As of November 2014, there was no timeline for funding or construction of any new-terrain sections for SIU 2. If built, the Indiana Commerce Connector or similar outer loop around Indianapolis has been proposed to be designated as either I-269 or I-470.[30]

SIU 3[]

From I-465 on the southwest side of Indianapolis, I-69 will follow the route of SR 37 south via Martinsville to Bloomington, at which point a new terrain routing to the southwest now serves the Crane NSWC, Washington, and Oakland City. The route intersects I-64, at southern terminus of SIU 3. Beyond there, SIU 4 of I-69 continues south along the former I-164 freeway into Evansville, where a new toll bridge is planned to enter Kentucky and cross the Ohio River near the existing US 41 bridges (just north of which I-69 temporarily ends).[31]

Tier 1 studies[]

INDOT has taken a two-tier approach to completing the environmental impacts documentation required for construction to proceed. During the Tier 1 studies, 14 route alternatives were analyzed and compared against the "No-Build" option. Of these alternatives, nine were eliminated from consideration as either having too great of an impact on the natural and human environment, failing to achieve the stated goals established for the I-69 extension, or both. The five alternatives that remained were as follows:[citation needed]

Alternative 1 ran from US 41 to Terre Haute and along I-70 from Terre Haute to Indianapolis. This alternative was favored heavily by Terre Haute. Alternative 2 used US 41 to Vincennes and SR 67 from Vincennes to Indianapolis; it was favored by Princeton and Vincennes. Alternative 3 was one of the two mostly overland routes along SR 57, then cutting cross country on an alignment that roughly follows SR 45, to SR 37 near Bloomington and using SR 37 to Indianapolis. This proposal was largely supported by the Evansville area but opposed by a vocal minority in Bloomington. A modified version of Alternative 3 is the current path of I-69's construction.[citation needed]

Alternative 4 followed SR 57 to US 231 near Bloomfield and US 231 from there to Spencer. Next it went cross country to Martinsville, and either followed SR 37 from Martinsville to Indianapolis, or continued north to I-70 and used I-70 to Indianapolis. This concept had more support from the Hoosier Hills Area. Alternative 5 was the last studied and used SR 57 to US 50 bypass just south of Washington. Afterwards, it followed US 50 eastward through Daviess and Martin counties to SR 37 just east of Bedford and then SR 37 from Bedford to Indianapolis. This alternative was favored mainly by Bedford.[citation needed]

In 2003, INDOT presented the Tier 1 Environmental Impact Statement (EIS) to the Federal Highway Administration, which identified Alternative 3C (following SR 37 between Indianapolis and Bloomington, then over new terrain to US 231 north of Crane Naval Surface Warfare Center, then following SR 57 south-southwest to the I-64/I-164 interchange northeast of Evansville) as the least environmentally damaging practical alternative. Subsequently, in March 2003 the FHWA issued a Record of Decision approving the Tier 1 EIS for SIU 3.[citation needed]

In November 2005, Governor Mitch Daniels announced the Major Moves initiative, which would raise billions of dollars for transportation projects by leasing the Indiana East–West Toll Road. Legislation enacted in March 2006 authorized Governor Daniels to lease the Indiana Toll Road to a joint-venture between Macquarie Infrastructure Group and Cintra for $3.8 billion. The same legislation also authorized a similar public-private partnership for design, construction, and operation of 117 miles (188 km) of Interstate 69 between Martinsville and Evansville as a toll expressway. This came following new highway legislation by Congress in January 2006 that allocated over $58 million to upgrade Indiana 37 to a full expressway from Indianapolis to Bloomington, regardless of what happened with I-69.[citation needed]

Nearly 15 years of environmental studies wrapped up on both the toll and free sections of the I-69 extension between Indianapolis and Evansville in 2006; the project was still being considered as a toll road by then. Project engineers and designers were by then identifying exact placement of interchanges, bridge structures, and connecting roads. In June 2006, officials revisited their decision from the Tier 1 EIS to account for the effects of tolling on the route, preparing a report that concluded that the previously selected route remained the preferred alternative, even with tolls; the report was approved by the Federal Highway Administration in the fall of 2006.[32]

In October 2006, Democratic State Representatives David Crooks and Trent Van Haaften proposed revising Major Moves legislation to make the entire 142-mile (229 km) length of I-69 between Evansville and Indianapolis part of the Southern Indiana Toll Road. Under their proposal the SITR would be operated by either the Indiana Department of Transportation, or a public authority to be established by future legislation. Additionally, the proposal called for the SITR construction bonds to be paid off 30–40 years following the road's completion, at which point the tolls would be removed.[33]

On November 9, 2006, Governor Daniels announced that I-69 between Evansville and Indianapolis would be built as a toll-free route, effectively canceling plans for the Southern Indiana Toll Road.[34]

Tier 2 studies and lawsuits[]

Studies[]

During Tier 2 studies, INDOT further divided SIU 3 into six smaller segments, allowing work on each subsegment to proceed at its own pace. On December 21, 2006, INDOT announced completion of the Tier 2 draft EIS[35] for the 13-mile (21 km) section between I-64 and SR 64 near Oakland City. Officials further noted that they would accelerate the final EIS and construction on the southernmost two-mile (3.2 km) section from I-64 to SR 68 to facilitate access to the Toyota's Princeton plant.[36] On April 30, Governor Daniels signed the state's two-year $26 billion budget, which included $119 million to fund construction of the southernmost segment of I-69, ensuring that construction would begin as scheduled in the summer of 2008. The Final EIS for the southernmost section was issued on October 22, 2007.[citation needed]

On February 10, 2008, INDOT and the FHWA issued the Tier 2 Draft EIS (DEIS) for two sections from Oakland City to Crane, totaling 55 miles (89 km). Of the changes to the original alternative, the DEIS extended the bridge over the Patoka River from 500 to 4,400 feet (150 to 1,340 m) to minimize damage to the river and adjacent wetlands. Construction on two rural interchanges would be postponed to free up $30 million for the extended bridge. INDOT released the 5,000-page Tier 2 FEIS for Section 3 from US 50 in Washington to US 231 near Crane on December 10, 2009. The ROD for Section 3 was issued in March 2010 and construction began in April 2010. The ROD for Section 2 (Oakland City to Washington) was issued in May 2010. In May 2010, Governor Daniels announced plans for I-69 to be open from I-64 to Bloomington by 2014 (Sections 1 through 4).[citation needed]

Lawsuits[]

Opposition groups, including various community groups and local governments, cited environmental issues and the cost of extending I-69. Opponents of the Southern Indiana Toll Road protested the I-69 extension, including petition signing by more than 144,000 Hoosiers along the proposed I-69 corridor and mass mailings of opposition to Governor Daniels. Other acts of protest included the vandalizing of the Indiana State Capitol by protesters who spray-painted "I-69 is the enemy" and "No I-69" on the side of the limestone building. In 2005, environmental extremists opposed to the extension set fire to I-69 project offices near Bloomington. In 2007, a group performed a mock eviction of the I-69 project office in Oakland City.[citation needed]

There have been mixed opinions of the project. The routing was strongly opposed in Bloomington and Martinsville, while there was strong support in Evansville and Washington. The United States Navy also supported the routing because it would provide access to the Crane Naval Surface Warfare Center. The new route was also supported by the Teamsters union, which represents many truck drivers, the American Trucking Association, and several trade unions representing the construction industry. A vocal minority in Bloomington and Martinsville both opposed upgrading State Road 37 to Interstate 69. The greatest support for I-69 was in Indiana's far southwestern counties and Evansville. Since the southwest corner is the only region not served by an interstate highway to Indianapolis, officials in southwest Indiana alleged that highway opponents are blocking I-69 construction in an attempt to further isolate the region from the remainder of the state. To the west, communities along US-41 favored the presently selected alignment in lieu of the only other feasible routing: I-70 to Terre Haute, then US-41 south to Evansville.[citation needed]

After the signing of Major Moves, highway opponents immediately filed two lawsuits to block the toll road lease legislation, arguing it violated the Indiana State Constitution. Among the arguments the plaintiffs contested that funds generated from the sale of a state public works asset must go to the state's General Fund In May 2006, St. Joseph County Superior Court Judge Michael Scopelitis issued a ruling declaring it a public suit (one that questions a public improvement) and as such required the plaintiffs to post a $1.9 billion bond to continue the suit. In response plaintiffs appealed the ruling to the Indiana Supreme Court, which upheld the lower court's ruling. With no means for the opposition to post the bond, Major Moves, and thus the proceeding of the Southern Indiana Toll Road, took effect with the closing of the deal on June 29, 2006.[citation needed]

On October 3, 2006, protest groups, citing environmental concerns, along with six individuals who live along the I-69 corridor, filed a lawsuit in federal court, alleging that state and federal agencies rigged environmental studies and violated several federal laws in the selection of a new-terrain route for I-69. They further pressed the court for a summary ruling directing the FHWA and INDOT to route I-69 over I-70 and US 41. Judge David Hamilton disagreed, and on December 10, 2007, he issued a 58-page ruling upholding the selected route for I-69 and the Tier 1 ROD. His ruling did, however, leave open the possibility that the FHWA and INDOT could be forced to reconsider some or all of the previously-rejected Tier 1 alternatives if there are new significant findings during the Tier 2 studies that were absent from the Tier 1 EIS. Barring any new major findings in the Tier 2 studies, Judge Hamilton's ruling paved the way for construction to begin on the southernmost segment.[citation needed]

Construction begins[]

On December 12, 2007, the FHWA issued its ROD giving final federal approval for construction to begin on the section between I-64/I-164 and SR 64 near Oakland City.[37][38] INDOT awarded the first SIU 3 construction contract to Gohmann Asphalt and Construction Company of Sellersburg, Indiana, on February 6, 2008. This contract, completed on May 31, 2008, included the removal of buildings and vegetation from the I-69 right-of-way between I-64 and SR 68. Gohmann also won the construction contract for the first two miles (3.2 km) from I-64 to SR 68 with a $25 million bid. Construction began with a groundbreaking ceremony in Evansville on July 16, 2008. INDOT built this first section of the extension of I-69 using the design-build method.[39][40]

The first open segment[]

On September 29, 2009, the first two miles (3.2 km) of the I-69 extension opened when traffic was shifted from the short segment of SR 57 between I-64 and SR 68 to the portion of the new I-69 route mentioned above. There was some initial confusion as the shift and detour were unannounced and poorly signed initially. This resulted in numerous accidents when motorists either drove through the dead end on the old SR 57 or inadvertently ended up in opposing lanes of traffic on I-164 in the days following the I-69 opening. State troopers directed traffic through the new I-69 segment until crews could install additional signage to more clearly mark the new route.[41] The former SR 57 roadway between SR 68 and I-64 was closed off with a cul de sac and now serves as a local access road.

Completion to Bloomington[]

The remaining mileage in Section 1, along with all of Section 2 and Section 3, for a total of 64 miles (103 km) from SR 64 to US 231 near the Crane NSWC, was opened to motorists on November 19, 2012.[42]

Section 4, from Crane to SR 37 in Bloomington, approximately 27-mile (43 km) in length, was completed, and opened to traffic on December 9, 2015.[43]

The final link: Bloomington to Indianapolis[]

Section 5[]

Construction on Section 5 to upgrade SR 37 through Bloomington to Martinsville to Interstate standards at a cost of $425 million was completed October 31, 2018. Under a public-private partnership, I-69 Development Partners was originally responsible for construction of the section. However, the partnership experienced multiple delays from the original completion date of October 2016 due to financial and other difficulties, including several work stoppages by subcontractors who cited a lack of being paid in the agreed to manner by the private group.[44] On August 14, 2017, the State of Indiana terminated the P3 arrangement with I-69 Development Partners, citing default on the contract terms and construction being delayed two years from the initial October 2016 completion deadline. INDOT assumed direct oversight of Section 5 construction, and contracted with Walsh Construction to serve as the prime contractor for the remainder of the project. Walsh oversaw several subcontractors retained from the I-69 Development Partners P3 arrangement that performed the earthworks, structure erection, paving, and other work to complete Section 5. As work wrapped up, the FHWA approved the designation of the highway as Interstate 69 up to Martinsville on September 18, 2018, and signage was installed.[45]

Section 6[]

The routing of Section 6 of I-69 from Martinsville to Indianapolis was again studied by INDOT, with five candidate finalist routes selected from nearly two-dozen options. On March 30, 2016, INDOT announced that I-69 would complete its route to Indianapolis following the current right-of-way of the SR 37 expressway. The interstate will be constructed along the path of SR 37 from Martinsville — through Morgan, northwest Johnson, and southwest Marion counties — connecting with I-465. The only significant deviation from the present alignment of SR 37 would be just south of the junction at I-465, where the freeway will deviate slightly to the west to allow the present Harding Street interchange of I-465 to remain, with only slight modification to its western ramps. INDOT reported that studies have shown that this preferred routing would reduce crashes and congestion the most, affect less forest and farm acreage, and result in the greatest decrease in travel time. The SR 37 routing also reduces the cost of the project by eliminating the need for a bridge over the White River between Martinsville and I-465. The path also impacts the most businesses, which had been a concern raised by Martinsville residents, business owners, and lawmakers.[46]

Unlike the P3 arrangement initially sought for Section 5, INDOT plans to complete Section 6 through traditional procurement methods, with five contracts let over several fiscal years.[47][48] On February 8, 2018, a combined Tier 2 FEIS and Record of Decision (ROD) was published for Section 6. On September 4, 2018, $600 million in funding for I-69 Section 6 was announced by Indiana Governor Eric Holcomb, with a goal of speeding up Section 6 completion to 2024.[49] Construction of access roads and improvements to local roads in the corridor began in Martinsville in 2019. Construction of the freeway itself began in Morgan and Johnson counties in 2020. INDOT closed SR 37 between Morgan Street and SR 39 in Martinsville starting on January 2, 2021, to enable the construction of I-69 through Martinsville to be completed in one construction season versus two seasons had SR-37 been kept open.[50] Start of construction of I-69 and the I-69/I-465 interchange in Marion County began in early 2021, and includes the reconstruction and widening of 9 miles (14 km) of I-465 between I-70 to the west and I-65 to the east. The freeway will have two lanes in each direction in Morgan County, three lanes in each direction from Smith Valley Road to Southport Road in Marion County, and four lanes each direction from Southport Road to I-465. Total cost of Section 6 is estimated to be $1.5 billion, which includes $700 to $800 million in actual construction costs with a completion date anticipated by 2025.[24]

Financing construction[]

To fund construction of this extension, Indiana Governor Daniels introduced a proposal known as "Major Moves" in early 2006. It provided $700 million from the Indiana Toll Road lease to be used to complete nearly 20 years of environmental studies and construct about half of the proposed extension (between the I-64/164 interchange and the Crane Naval Surface Warfare Center). It also allowed for the construction of 117 miles (188 km) of the 142-mile (229 km) I-69 extension to Evansville to be constructed as the Southern Indiana Toll Road. Due to ongoing controversy over making this portion of the extension a toll road, the governor announced in November 2006 that the entire stretch of the highway would be toll-free, subject to construction of the Indiana Commerce Connector (SIU 2).[26] Officials with the INDOT have since stated that I-69 will be toll-free regardless of whether or not the Indiana Commerce Connector is constructed.[51] Additionally, the U.S. Congress allocated an additional $14 million in the 2005 SAFETEA-LU authorization to construct I-69 Evansville to Indianapolis.[52][53]

The 2014-2015 Indiana State budget placed $400 million in a "Major Moves 2020" fund, some of which will go towards completing I-69.[54] INDOT and the Indiana Finance Authority released a request for qualifications on May 23, 2013,[55] for a public-private partnership agreement to complete the 26 miles (42 km) of Section 5 of SIU 3, with four proposals shortlisted on July 31, 2013.[56] When SIU 3 and the Indiana portion of SIU 4 are completed, I-69 in Indiana will be approximately 340 miles (547 km) long.

Designation extension[]

In April 2010, the Indiana Department of Transportation (INDOT) petitioned the Federal Highway Administration (FHWA) and the American Association of State Highway and Transportation Officials (AASHTO) to change the designation of the I-69 extension from "Proposed Route 69" to "Interstate 69", citing the two miles (3.2 km) of the extension already open to traffic, and a total of 107 miles (172 km) out of 183 miles (295 km) from the southern terminus of the original I-69 to the Ohio River near Evansville that would be open by the end of 2012. The ruling would allow INDOT to erect I-69 signs on portions of I-465 between the current interchange with I-69 in the northeast and the proposed interchange on the southwest, and reset reference posts (RP) and renumber exits and reference posts on the original section north of Indianapolis (starting with RP 200 instead of the then-current RP 0).[57] The latter task was accomplished by the end of 2012.

SIU 4[]

This section of I-69 in Indiana incorporates the former I-164 south from I-64 into the Evansville metro area. Eventually I-69 will deviate from the existing freeway to cross into the state of Kentucky on a new toll bridge over the Ohio River.

At the October 18, 2013, AASHTO meeting, an INDOT request for re-designation of 20.70 miles (33.31 km) of I-164 to I-69 between US 41 and I-64 was approved, pending concurrence from the FHWA.[58] Signage was changed to I-69 beginning the week of November 17, 2014.[59]

Ohio River crossing (ORX)[]

The original plan (in a DEIS prepared by INDOT in 2004, but later dropped) was for I-69 to leave the now-former I-164 alignment somewhere just east of Green River Road (exit 3) and head south (instead of turning west with I-164) for approximately three miles (4.8 km) before crossing the Ohio at a point near the mouth of the Green River. This portion of the route had not then been funded, as construction of the new Ohio River crossing and its approaches in both states was expected to cost approximately $800 million. Indiana and Kentucky officials had said construction on the new Ohio River Bridge would not begin until at least 2020, after two new crossings near Louisville were completed.[60] With Indiana then preparing to break ground on SIU 3, Kentucky officials indicated that collecting tolls might be the only feasible option for completing the I-69 bridge, as traditional federal and state funding for such projects were drying up. As of February 2013, neither Kentucky nor Indiana officials had yet come up with the money to plan and construct this I-69 bridge.[61]

In 2016, both states initiated a renewed push to build the bridge, and the present I-69 Ohio River Crossing (I-69 ORX) project was born. The process was broadened to study several alternative alignments for the river crossing, and the possibility of making it a tolled facility was approved. As of February 2018, a new DEIS was in the process of being prepared, a project website had been set up, public involvement and input were being solicited, and the preliminary routing alternatives had been narrowed to three. By June of that year, refinements had been made in all three proposed alternatives based on public input and additional engineering data.[62] On December 14, 2018, the central corridor was chosen as the preferred route with an estimated cost of $1.5 billion for a new terrain bridge east of existing US 41.[63]

Controversies[]

The routing for SIU 3 of I-69 in Indiana was particularly controversial. The planned extension to Evansville pitted cities, towns, and counties against one another. The greatest support for an extended I-69 was in Indiana's far southwestern counties and Evansville, while the greatest opposition was between Indianapolis and a vocal minority based in Bloomington. Some in Bloomington and Martinsville opposed upgrading SR 37 to I-69, while still others welcomed this improvement. The opposition led to Southwestern Indiana communities accusing highway opponents further north of trying to isolate this region from the rest of the state by blocking construction of a direct highway link to Indianapolis. To the west, communities along US 41 favored the selected alignment in lieu of the only other feasible routing: I-70 to Terre Haute, then US 41 south to Evansville. Terre Haute preferred the I-70/US 41 routing over the selected routing of I-69 for local economic reasons. Despite the SR 37 routing ultimately being chosen, an Interstate-quality bypass was built east of Terre Haute (SR 641), to connect US 41 and I-70.

INDOT, current and past governors, and businesses and elected officials in Evansville and adjacent southwest Indiana communities, favored a direct route via Bloomington that would be built over new terrain from Bloomington to Evansville. Supporters argued that this direct route reduces the travel time to Indianapolis as well as improves access to Bloomington for residents of southwestern Indiana, something a route via Terre Haute would not achieve. INDOT officials also pointed out that SR 37 would eventually be upgraded from a four-lane expressway to full freeway status with or without I-69. After extensive review of the alternative routes as well as detailed environmental studies, the state selected the new terrain route via Bloomington.

Environmentalists pointed out the construction of I-69 would lead to the destruction of 1,500 acres (6.1 km2) of forest and more than 300 acres (1.2 km2) of wetlands.[64] The route selected as of 2010 passes through the Patoka River National Wildlife Refuge but on a corridor that the federal government purposely did not acquire for the refuge. This was because of an agreement with the state not to dispute the passage of a highway on this corridor.[65] Environmental groups then filed suit in federal court on October 2, 2006, to block further study and construction of the route,[66] but the lawsuit was dismissed by U.S. District Judge David F. Hamilton on December 12, 2007, clearing the way for construction to begin in 2008. Opponents had considered appealing Judge Hamilton's ruling to the U.S. Court of Appeals for the Seventh Circuit (which could have possibly sent the case to the Supreme Court of the United States), but they ultimately abandoned further legal challenges to the proposed route. Instead, opponents tried to block construction through the legislative process, when Democrats in the Indiana House of Representatives stripped funding for the I-69 extension in their version of the 2008 two-year state budget. Money for I-69 was restored after budget negotiations with the Republican-controlled Indiana Senate.

Another area of controversy arose in late 2005 when governor Mitch Daniels proposed levying tolls on the highway to finance its construction, either as a state project or a public-private partnership, in order to accelerate the project. As the route would overlay the existing SR 37 between Bloomington and Indianapolis, and there is no other free alternative route between Bloomington and Martinsville, this proposal has raised concerns among local residents and businesses. In March 2006, Daniels signed a bill known as "Major Moves" that leased the Indiana East–West Toll Road, but also included a compromise on constructing I-69 in southwest Indiana. As part of the deal, the legislation permitted the Governor to enter a similar public-private partnership for construction of 117 miles (188 km) of I-69 as the Southern Indiana Toll Road from Martinsville to the I-64/I-164 interchange, while the remaining 25 miles (40 km) from Martinsville to the I-465/SR 37 interchange in Indianapolis would remain toll-free. On June 20, 2006, the Indiana Supreme Court rejected a legal challenge brought on by I-69 opponents, upholding Major Moves legislation in a 4–0 decision. The toll road option was highly unpopular, even among many who supported the extension via Bloomington. As a result, Governor Daniels announced in December 2006 that I-69 through southwest Indiana would be toll-free.

Protests[]

While Citizens for Appropriate Rural Roads had continued to rally crowds of opponents to appear at public hearings,[67] other groups and individuals conducted acts of vandalism, ranging from spray-painting graffiti on the Indiana Statehouse in June 2005,[68] to the breaking of windows of a private pro-I-69 business in Evansville in June 2008,[69] to attempted arson at the I-69 regional planning office in Bloomington in July 2005.[70] In the case of the Statehouse incident, two dozen protesters were arrested on charges ranging from disorderly conduct to an assault on a police officer. In addition to incidents in Indianapolis, numerous incidents have also occurred in and around the construction sites in Gibson County. Especially active has been a group called Roadblock Earth First which has been responsible for a number of vandalism incidents in Oakland City and at a Haubstadt asphalt yard given the contract for the first segment.[71][72] In 2009, two protesters were arrested on charges of felony racketeering for disrupting public meetings in 2007 and 2008. These protests and acts of vandalism were widely viewed as an effort to intimidate proponents of I-69.[73]

Exit list[]

Exit numbers on the new southern section of I-69 are a continuation of the old I-164 exit numbering. Starting on August 6, 2012, the state of Indiana began renumbering all exits and reference posts on the original route of I-69 from I-465 to the Michigan state line by adding 200 to each value; it was decided to add an even 200 despite the fact that the new extension is only 184 miles (296 km) in order to minimize confusion.[74]

CountyLocationmi[1]kmOld exit[75]New exitDestinationsNotes
Ohio River0.000.00 I-69 south – PaducahFuture continuation into Kentucky
Interstate 69 Ohio River Bridge; IndianaKentucky line
VanderburghEvansvilleContinuation beyond temporary southern terminus
0.0000.000Veterans Memorial ParkwayTemporary southern terminus
0.6901.1100 US 41 – Vincennes, Henderson
3.5775.7573Green River Road
WarrickOhio Township6.33910.2025 SR 662 east / Covert Avenue – Newburgh
VanderburghEvansville7.85712.6457 SR 66 – Newburgh, EvansvilleSigned as exits 7A (east) and 7B (west Lloyd Expressway)
Knight Township9.43915.1919 SR 62 (Morgan Avenue) – Evansville, Boonville38th Parallel sign located at north end of interchange.
10.55116.98010Lynch Road
Scott Township15.86725.53515Boonville–New Harmony Road
19.32931.10718 SR 57 south – EvansvilleSouthern end of SR 57 concurrency; formerly signed as exit 19 southbound
GibsonWarrick
county line
Johnson Township21.493–
21.878
34.590–
35.209
21 I-64 – Louisville, St. LouisI-64 exits 29A-B; signed as exits 21A (east) and 21B (west)
23.23037.38522 SR 57 north / SR 68 – HaubstadtNorthern end of SR 57 concurrency; northern terminus prior to November 19, 2012
GibsonBarton Township27.95144.98327 SR 168 – Fort Branch, Mackey
Columbia Township33.70054.23533 SR 64 – Princeton, Huntingburg, Oakland City University
PikeWashington Township46.61675.02146 SR 56 / SR 61 – Jasper, Petersburg
DaviessWashington62.618100.77462 US 50 / US 150 – Washington, Vincennes
Elmore Township76.620123.30876 SR 58 – Elnora, Odon
GreeneTaylor Township87.831141.35087 US 231 – Loogootee, Bloomfield, NSA Crane, Jasper, CraneNorthern terminus from November 19, 2012 to December 9, 2015
Scotland98.994159.31598 SR 45
Cincinnati104.401168.017104 SR 445 west
MonroeBloomington114.898184.910114 SR 37 south – BedfordNorthern terminus from December 9, 2015 to September 18, 2018; southern end of SR 37 concurrency
115185115Fullerton PikeInterchange opened on August 6, 2017[76][77]
116187116Tapp RoadInterchange opened on June 1, 2018[78]
117188117 SR 45 south / Bloomfield Road/2nd StreetSouthern end of SR 45 concurrency
118190118 SR 48 west / 3rd StreetEastern end of middle segment of SR 48
120190120 SR 45 north / SR 46 – Elletsville, Spencer, BloomingtonNorthern end of SR 45 concurrency; Exits signed as 120A (east) and 120B (west)
123198123College Avenue/Walnut StreetSouthbound exit, northbound entrance from Walnut Street
Washington Township125201125Sample RoadFull interchange opened July 14, 2018[79]
MorganWashington Township134216134Liberty Church RoadOpened August 7, 2018; current northern terminus near this interchange as of August 31, 2018 (just south of Martinsville, Indiana)
Temporary gap in I-69; future route follows SR 37 expressway and I-465
Martinsville136.78220.13137
SR 39 north to SR 67 – Martinsville
Under reconstruction, open by end of 2021; southern terminus of SR 39
138.05222.17138Ohio Street/Artesian AvenueInterchange under construction, scheduled to open by end of 2021
139.70–
140.23
224.83–
225.68
140 SR 252 east / Hospital Drive – Morgantown
SR 44 east / Reuben Drive – Franklin
Western terminus of SR 252 and SR 44; interchange under construction, scheduled open by end of 2021; SR 44 ramps are a diamond design using north half of the dogbone interchange with SR 252 as partial collector-distributor lanes
Green Township145Henderson Ford RoadInterchange under construction, scheduled to be fully open by end of 2022
JohnsonWaverly153 SR 144 west – MooresvilleEastern terminus of SR 144; Interchange under construction, to open by end of 2022
Smith Valley156Smith Valley RoadInterchange under construction, to open by end of 2023
Greenwood158County Line RoadInterchange under construction, to open by end of 2022
MarionIndianapolis160Southport RoadInterchange under construction, to open by end of 2022
162Epler AvenueInterchange under construction, to open by end of 2022; northbound exit and southbound entrance
163 I-74 / I-465 / US 36 / US 40 west / SR 67 southFuture south end of I-74/I-465/US 36/US 40/SR 67 concurrencies; Interchange under construction, to open by 2023-2024
Future route follows the southeast leg of I-465 but has not been officially designated[80]
200.000321.8690200 I-465 westFuture north end of I-465 concurrency; southbound exit and northbound entrance; I-465 north exit 37, east exit 37B
200.408322.525Binford Boulevard – IndianapolisSouthbound left exit and northbound left entrance; southern end of SR 37 concurrency; former SR 37; I-465 east exit 37A
200.842–
200.856
323.224–
323.246
120182nd Street – Castleton
MarionHamilton
county line
IndianapolisFishers line202.579326.019320396th Street
HamiltonFishers203.756327.913204106th Street – FishersOpened December 7, 2016; oval roundabout on 106th centered over I-69 (two grade separations)
204.937–
205.494
329.814–
330.711
5205116th Street – Fishers
SR 37 north – Noblesville
Complete access to 116th Street; SR 37 northbound exit and southbound entrance via collector-distributor lanes; northern end of SR 37 concurrency
Fall Creek Township210.146–
210.152
338.197–
338.207
10210Campus Parkway, Southeastern Parkway – FishersDiverging diamond interchange; former SR 238 (Greenfield Avenue)
MadisonGreen Township214.445345.11614214 SR 13 – Fortville, Lapel
Pendleton218.714351.98619219 SR 38 west – Pendleton, NoblesvilleSouthern end of SR 38 concurrency
222.439357.98122222 SR 9 south / SR 67 south / SR 38 east – Pendleton, AndersonSouthern end of SR 9/SR 67 concurrency, northern end of SR 38 concurrency
Anderson226.273364.15126226 SR 9 north / SR 109 south – AndersonNorthern end of SR 9 concurrency
DelawareDaleville233.486–
233.784
375.759–
376.239
34234 SR 67 north – Muncie
SR 32 – Anderson, Muncie
Northern end of SR 67 concurrency; SR 32 ramps are a folded diamond design using north half of the diamond interchange with SR 67 as partial collector-distributor lanes[81]
Mount PleasantHarrison
township line
240.978387.81641241 SR 332 east / McGalliard Road – Frankton, Muncie
Harrison Township244.778393.93245245 US 35 south / SR 28 – Muncie, Alexandria, AlbanySouthern end of US 35 concurrency
GrantJefferson Township255.019410.41355255 SR 26 – Fairmount, Hartford City
Monroe Township259.114417.00459259 US 35 north / SR 22 – Gas City, UplandNorthern end of US 35 concurrency
264.140425.09264264 SR 18 – Marion, Montpelier
HuntingtonJefferson Township272.859439.12473273 SR 5 / SR 218 – Warren
Salamonie Township277.540446.65778278 SR 5 – Huntington, Warren
Markle286.394460.90686286 US 224 – Huntington, Decatur
Wells
No major junctions
AllenLafayette Township296.515477.19596296 I-469 east / US 33 south
Lafayette Center Road west – Roanoke
Signed as exits 296A (I-469/US 33) and 296B (Lafayette Center Road); southern terminus of I-469, exit 0; southern end of US 33 concurrency
299.049481.27399299 Airport Expressway – Lower Huntington RoadTo Fort Wayne International Airport
Fort Wayne302.060486.118102302 US 24 west / Jefferson Boulevard – Huntington, Fort WayneSouthern end of US 24 concurrency
305.297491.328105305 SR 14 west / Illinois Road – South WhitleyEastern terminus of SR 14; formerly a cloverleaf interchange, currently being improved to a Parclo A4 interchange by removing the NW & SE loop ramps. Improvements expected to be complete by fall 2021
309.253497.694109309 SR 930 east / Goshen Road – Fort Wayne
US 30 west / US 33 north – Columbia City, Elkhart
Signed as exits 309A (SR 930) and 309B (US 30, US 33); western terminus of SR 930; northern end of US 33 concurrency; southern end of US 30 concurrency
311.034500.561111311 US 27 south / Lima Road – Fort Wayne
SR 3 north / Lima Road – Kendallville
Signed as exits 311A (US 27) and 311B (SR 3); northern terminus of US 27 and southern terminus of SR 3
312.336502.656112312Coldwater RoadSigned as exits 312A (south) and 312B (north) northbound
315.079507.070115315 I-469 / US 24 east / US 30 eastNorthern terminus of I-469, exit 31; northern end of US 24 and US 30 concurrency
315.799508.229116316 SR 1 north / Dupont RdDiverging diamond interchange
Perry Township317.266–
317.276
510.590–
510.606
317Union Chapel Road
DeKalbKeyser Township326.261525.066126326CR 11-A
Auburn329.026529.516129329 SR 8 – Garrett, Auburn
GrantSmithfield
township line
334.329538.050134334 US 6 – Kendallville, Waterloo
DeKalbSteuben
county line
SmithfieldSteuben
township line
340.378547.785140340 SR 4 – Ashley, Hudson, Hamilton
SteubenPleasant Township347.995560.044148348 US 20 – Lagrange, Angola
350.411563.932150350CR 200 West
Jamestown Township354.025569.748154354

SR 127 to SR 120 / SR 727 – Orland, Fremont, Angola, Pokagon State Park
356.061573.025156356 I-80 / I-90 / Indiana Toll Road – Chicago, ToledoToll Road exit 144; double trumpet design in southeast quadrant of junction; additional ramps connect SR 120 and SR 127 with Toll Road; actual junction (I-69 under Toll Road) at milepoint 355.62[82]
356.925574.415157357Lake George Road – Jamestown
357.824575.862 I-69 north – LansingContinuation into Michigan
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Concurrency terminus
  •       Incomplete access
  •       Unopened

Related routes[]

Auxiliary route[]

There is one auxiliary Interstate Highway for I-69 in Indiana, I-469, the beltway around the south, east, and north sides of Fort Wayne.

Indiana Commerce Connector[]

The Indiana Commerce Connector (ICC) was a proposed 75-mile (121 km), Interstate-grade, partial outer beltway on the south and east sides of Indianapolis that was put forward by Governor Mitch Daniels in November 2006.[83] The proposed road segment would have been numbered either I-269 or I-470 and connected four Interstate highways at six locations. Proposed as a privately built toll road, it would have extended southward from Pendleton at I-69, through Greenfield at I-70, Shelbyville at I-74, Franklin at I-65, Martinsville at SR 37 (future I-69), to a southern terminus at I-70 near Mooresville. On March 24, 2007, Governor Daniels withdrew the proposal for the ICC due to lack of public support.[84] It has been suggested that the ICC be signed as either I-269 or I-470.[citation needed]

In April 2014 the logistics group Connexus Indiana and others came out in favor of reactivating the proposal for the Indiana Commerce Connector.[85] However, the Indy Chamber (formerly the Indianapolis Chamber of Commerce) is among those who have stated opposition to the plan.[86]

See also[]

  • Blank shield.svg U.S. Roads portal
  • Flag of Indiana.svg Indiana portal

Notes[]

  1. ^ As of May 2021

References[]

  1. ^ Jump up to: a b c d Indiana Department of Transportation (July 2016). Reference Post Book (PDF). Indianapolis: Indiana Department of Transportation. Retrieved December 22, 2016.
  2. ^ "Section 5 officially part of I-69". The Herald-Times. Bloomington. September 18, 2018. Retrieved September 18, 2018.
  3. ^ "I-164 Renamed to I-69 by End of Year" (Press release). Indiana Department of Transportation. November 18, 2014. Retrieved December 8, 2016.
  4. ^ Ripple, D. A (1975). "Chapters I–IV: Development of the National Program". History of the Interstate System in Indiana. Volume 1. West Lafayette, IN: Joint Highway Research Project, Indiana Department of Transportation and Purdue University. doi:10.5703/1288284313909. Publication FHWA/IN/JHRP-75/26. |volume= has extra text (help)
  5. ^ "INDOT: I-69 Added Travel Lanes and Maintenance: Delaware and Madison Counties". www.in.gov.
  6. ^ Indiana Department of Transportation. "Pipe Creek Rest Area Northbound". Welcome Centers & Rest Areas. Indiana Department of Transportation. Retrieved August 16, 2011.
  7. ^ Indiana Department of Transportation. "Pipe Creek Rest Area Southbound". Welcome Centers & Rest Areas. Indiana Department of Transportation. Retrieved August 16, 2011.
  8. ^ Indiana Department of Transportation. "Flat Creek Rest Area Northbound". Welcome Centers & Rest Areas. Indiana Department of Transportation. Retrieved August 16, 2011.
  9. ^ "Construction next to I-69 is for a new rest stop". Fort Wayne, IN: WANE-TV. July 14, 2011. Archived from the original on July 16, 2011. Retrieved August 16, 2011.
  10. ^ Indiana Department of Transportation. "Pigeon Creek Welcome Center". Welcome Centers & Rest Areas. Indiana Department of Transportation. Retrieved August 16, 2011.
  11. ^ Jump up to: a b c Ripple, D. A. (1975). "Chapter VI: Route History". History of the Interstate System in Indiana. Volume 3, Part 2. West Lafayette, IN: Joint Highway Research Project, Indiana Department of Transportation and Purdue University. p. 582. doi:10.5703/1288284314561. Publication FHWA/IN/JHRP-75/28-2. |volume= has extra text (help)
  12. ^ Jump up to: a b Ripple, David Alan (1975). History of the Interstate System in Indiana. Purdue University.[full citation needed]
  13. ^ Indiana Department of Transportation. "Home". Major Moves: 465-69 Northeast. Indiana Department of Transportation. Archived from the original on July 21, 2011. Retrieved August 16, 2011.
  14. ^ Fort Wayne District. "I-69 and SR 1 (Dupont Road)". Indiana Department of Transportation. Retrieved December 8, 2016.
  15. ^ "INDOT Reveals Plans for Major Construction on I-465 & I-69". Indianapolis: WISH-TV. October 24, 2007. Archived from the original on May 14, 2008.
  16. ^ "Operation Indy Commute: I-69". Indiana Department of Transportation. Retrieved December 8, 2016.
  17. ^ "State to Invest $50 Million to Improve I-465/I-69 Interchange on Indy's Northeast Side" (Press release). Indiana Department of Transportation. December 2015. Retrieved December 8, 2016.
  18. ^ "INDOT Plans to Add I-69 Lanes from Fishers to Anderson". Indianapolis Star. Associated Press. February 10, 2014. Retrieved October 4, 2014.
  19. ^ Indiana Department of Transportation. "INDOT: I-69 Major Moves 2020". Indiana Department of Transportation. Archived from the original on December 29, 2016. Retrieved December 4, 2016.
  20. ^ Indiana Department of Transportation. "I-69 Added Travel Lanes and Maintenance: Delaware and Madison Counties". Indiana Department of Transportation. Retrieved July 1, 2018.
  21. ^ Jump up to: a b "New I-69 Interchange Opening Today at 106th Street" (Press release). Indiana Department of Transportation. December 7, 2016. Retrieved December 8, 2016.
  22. ^ "106th Street & I-69 Interchange". Indiana Department of Transportation. Retrieved March 30, 2016.
  23. ^ "Frequently Asked Questions". I-69 Finish Line. Retrieved July 19, 2021.
  24. ^ Jump up to: a b Orr, Susan (February 1, 2019). "Get up to speed on the last leg of I-69 construction". Indianapolis Business Journal. Retrieved February 1, 2019.
  25. ^ https://fox59.com/2019/07/08/indot-to-hold-open-house-on-i-465-project/ Fox 59, July 8, 2019
  26. ^ Jump up to: a b "The I-69 Freeway". Evansville Courier & Press. November 10, 2006. Retrieved November 25, 2006.
  27. ^ "Gov Wants Toll Road Loop Around Indy". Indianapolis Star. November 10, 2006. Archived from the original on February 10, 2007. Retrieved November 10, 2006.
  28. ^ "Daniels Abandons Indy-Area Toll Road". Indianapolis Star. March 25, 2007. Archived from the original on October 14, 2007.
  29. ^ Lesnick, Gavin (March 25, 2007). "Commerce Connector Scrapped". Evansville Courier & Press.
  30. ^ Bradner, Eric (November 19, 2012). "What's Next: Construction of Northern End of I-69 Remains Uncertain". Evansville Courier & Press. Retrieved November 20, 2012.
  31. ^ "I-69 Ohio River Crossing". Retrieved July 1, 2018.
  32. ^ "Tier 1 reevaluation report" (PDF). Archived from the original (PDF) on September 28, 2007.
  33. ^ "Daniels Leery of I-69 Toll Plan". Indiana Economic Digest. October 7, 2006. Retrieved October 8, 2014.
  34. ^ "Daniels: No Tolls on I-69". Indiana Economic Digest. November 9, 2006. Retrieved October 8, 2014.
  35. ^ Indiana Department of Transportation. "Tier 2 Draft EIS for SIU 3, Segment 1". Indiana Department of Transportation. Archived from the original on August 1, 2012.
  36. ^ "Officials Finish Draft Study of I-69 Leg". Indianapolis Star. December 21, 2006.
  37. ^ Corbin, Bryan (December 11, 2007). "Judge Gives I-69 Plan Nod in Suit". Evansville Courier & Press.
  38. ^ Hoosier Environmental Council v. U.S. Department of Transportation, 1:06-cv-1442 (S.D. Ind. 2001). Retrieved December 11, 2007. "Archived copy" (PDF). Archived from the original on September 17, 2008. Retrieved December 12, 2007.CS1 maint: archived copy as title (link) CS1 maint: bot: original URL status unknown (link)
  39. ^ Indiana Department of Transportation (June 1, 2007). "18 Months Construction Letting List (Major Moves Projects)" (PDF). Indiana Department of Transportation. Archived from the original (PDF) on June 25, 2007.
  40. ^ Martin, John; Corbin, Bryan (March 13, 2008). "Clearing Way for Interstate Leg". Evansville Courier & Press.
  41. ^ Lyman, Jill (September 29, 2009). "Detour at SR 57 and SR 68". Evansville, IN: WFIE-TV. Archived from the original on July 23, 2012.
  42. ^ Gootee, Richard (November 19, 2012). "I-69 Opens to Public at 5 P.M." Evansville Courier & Press. Retrieved November 20, 2012.
  43. ^ "Mayors: Next Section of I-69 to Open Next Week". Evansville Courier & Press. December 2, 2015. Retrieved December 2, 2013.
  44. ^ Kaitlin, Kaitlin L (February 13, 2017). "I-69 completion date pushed back". Evansville Courier & Press. Retrieved February 13, 2017.
  45. ^ mreschke@heraldt.com, Michael Reschke 812-331-4370. "Section 5 officially part of I-69". The Hoosier Times.
  46. ^ "Final decision: I-69 to be built through Johnson County". Martinsville Daily Journal. March 30, 2016. Archived from the original on April 2, 2016. Retrieved March 30, 2016.
  47. ^ Houser, Shannon (September 13, 2017). "Fewer Residents to Be Impacted After Changes Made to I-69 Construction Between Martinsville, Indy". Indianapolis: WXIN-TV. Retrieved October 17, 2017.
  48. ^ Indiana Department of Transportation (September 12–14, 2017). "I-69 Section 6 Project Update Meetings" (PDF). Indiana Department of Transportation. Retrieved October 17, 2017.
  49. ^ "Holcomb announces $1B infrastructure spending plan". AP NEWS. September 4, 2018.
  50. ^ "Drivers, Business Owners Brace For Road Closures In Martinsville". WFYI. December 21, 2020.
  51. ^ "No Tolls". Evansville Courier & Press. January 17, 2007. Retrieved January 17, 2007.
  52. ^ Lawrence, Chris (October 3, 2006). "I-69 Newsline".
  53. ^ Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), Pub.L. 109–59 (text) (pdf)
  54. ^ "Pence Signs Two-Year, $30 Billion State Budget". Indiana Economic Digest. Retrieved September 2, 2013.
  55. ^ "Indiana Finance Authority" (PDF). State of Indiana. Retrieved February 7, 2014.
  56. ^ "Indiana Finance Authority Shortlists 4 Proposers for its I-69 Section 5 Project". Infra Insight Blog. July 31, 2013. Archived from the original on September 2, 2013. Retrieved September 2, 2013.
  57. ^ Horsley, John (April 16, 2010). "Request to Extend I-69" (PDF). Letter to Victor M. Mendez. American Association of State Highway and Transportation Officials. Retrieved August 16, 2011.
  58. ^ Special Committee on U.S. Route Numbering (October 28, 2013). "Special Committee on US Route Numbering Meeting Minutes for October 17, 2013 and Report to SCOH October 18, 2013" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived (PDF) from the original on June 3, 2019. Retrieved October 25, 2013.
  59. ^ Indiana Department of Transportation (November 18, 2014). "I-164 Renamed to I-69 by End of Year" (Press release). Indiana Department of Transportation. Retrieved November 18, 2014.
  60. ^ Stinnett, Chuck (December 9, 2007). "Don't Get in Rush for I-69 Bridge". Evansville Courier & Press.
  61. ^ Tate, Curtis; Gordon, Greg (February 2, 2013). "After Millions of Dollars, I-66 and I-69 are Kentucky's Interstates to Nowhere". Lexington Herald-Leader. Retrieved March 2, 2015.
  62. ^ "News & Events I-69 Ohio River Crossing". Retrieved July 1, 2018.
  63. ^ "I-69 ORX project team announces preferred route for new Evansville-Henderson bridge". Evansville Courier & Press.
  64. ^ Sprout. "NAFTA Superhighway". Earth First! Journal. Archived from the original on September 27, 2007.
  65. ^ Indiana Department of Transportation. "Appendix U, I-69 and Patoka National Wildlife Refuge : History of Joint Development" (PDF). Section 2 DEIS. Indiana Department of Transportation. Archived from the original (PDF) on July 26, 2011.
  66. ^ "Groups Sue to Halt I-69 Project". Fort Wayne Journal Gazette. October 3, 2006. Archived from the original on September 27, 2007. Retrieved November 25, 2006.
  67. ^ Mullins, Christy (August 27, 2010). "Public Input at Greene County INDOT Hearing: 'Stop I-69'". Bloomington Herald-Times.
  68. ^ Boyd, James (June 5, 2005). "Two Dozen Arrested at I-69 Protest". Bloomington Herald-Times. Retrieved August 5, 2009.
  69. ^ Lesnick, Gavin (June 25, 2008). "I-69 Protest Group Breaks Windows at Business". Evansville Courier & Press. Retrieved August 5, 2009.
  70. ^ Van der Dussen, Kurt (July 19, 2005). "Vandals Hit Local I-69 Office". Bloomington Herald-Times. Retrieved August 5, 2009.
  71. ^ Corbin, Bryan (July 3, 2008). "Invitation-Only Groundbreaking Set for I-69 Segment". Evansville Courier & Press.
  72. ^ Corbin, Bryan (July 17, 2008). "Long-Awaited I-69 Begins". Evansville Courier & Press.
  73. ^ Greene, Linda (August 19, 2010). "I-69 Charges Resolved, SLAPP Suits Remain". Bloomington Alternative.
  74. ^ Lanka, Benjamin (July 26, 2012). "State's Plus-200 Marker Revamp Not Quite Exact". The Journal Gazette. Fort Wayne, IN. Retrieved July 26, 2012.
  75. ^ Indiana Department of Transportation. "INDOT Roadway Referencing System" (PDF). Indiana Department of Transportation. Archived from the original (PDF) on June 15, 2011. Retrieved March 27, 2012.
  76. ^ "I-69 Section 5 Announces Road Closures". WBIW-TV. August 3, 2017. Retrieved October 17, 2017.
  77. ^ Bavis, Lauren. "Confusing Signs at New Fullerton Pike Interchange Frustrate Drivers". The Herald-Times. Bloomington, IN. Retrieved October 17, 2017.
  78. ^ "Tapp Rd. Interchange Set To Re-Open Tonight". Indiana Public Media. June 1, 2018. Retrieved June 4, 2018.
  79. ^ "Ramp from Sample Road to northbound SR 37 to open Saturday" (PDF). InDOT. July 12, 2018. Retrieved December 24, 2018.
  80. ^ "Frequently Asked Questions". I-69 Finish Line. Retrieved May 3, 2021.
  81. ^ Indiana Department of Transportation (December 3, 2001). Interchange 34 on I-69 (PDF) (Map). Indiana Department of Transportation. Archived from the original (PDF) on April 19, 2010.
  82. ^ Indiana Department of Transportation (December 3, 2001). Interchange 156 on I-69 (PDF) (Map). Indiana Department of Transportation. Archived from the original (PDF) on April 19, 2010.
  83. ^ "Governor proposes Indiana Commerce Connector, no tolls on I-69". State of Indiana. November 9, 2006. Retrieved December 29, 2015.
  84. ^ "Governor Withdraws Support For Indiana Commerce Connector". TheIndyChannel.com. March 25, 2007. Retrieved December 29, 2015.
  85. ^ "Groups hope to revive Indiana Commerce Connector". The Washington Times. April 6, 2014. Retrieved December 29, 2015.
  86. ^ "Indy Chamber 2015 Legislative Agenda" (PDF). Indy Chamber. p. 8. Archived from the original (PDF) on March 4, 2016. Retrieved December 29, 2015.

External links[]

Route map:

KML is from Wikidata


Interstate 69
Previous state:
Kentucky
Indiana Next state:
Michigan
Retrieved from ""