Kağıthane (Istanbul Metro)
Kağıthane | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Istanbul Metro rapid transit station | |||||||||||||||||||||
Location | Cendere Cd., Merkez Mah. 34406 Kağıthane | ||||||||||||||||||||
Coordinates | 41°04′49″N 28°58′16″E / 41.0804°N 28.9710°ECoordinates: 41°04′49″N 28°58′16″E / 41.0804°N 28.9710°E | ||||||||||||||||||||
Owned by | Istanbul Metropolitan Municipality | ||||||||||||||||||||
Operated by | Istanbul Metro | ||||||||||||||||||||
Line(s) | M7 M11 (Under Construction) | ||||||||||||||||||||
Platforms | N/A | ||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||
Connections | İETT Bus Istanbul Minibus | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Elevated | ||||||||||||||||||||
Parking | No | ||||||||||||||||||||
Bicycle facilities | Yes | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 2020 (M7 platform) 2021 (M11 platform) | ||||||||||||||||||||
Electrified | 1,500 V DC Overhead line | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Kağıthane (M7) Metro Station is the metro station on the viaduct on the M7 line of the Istanbul metro, and was put into service on October 28, 2020.
The station is located on Cendere Street in Kağıthane Merkez (Central) neighborhood.
The side platforms of the station are located on the Kağıthane Stream and access to the platforms is provided from the entrances on both sides of the creek.
NOTE! : Due to the technical problem experienced on April 7, 2021, Mecidiyeköy Metro Station is closed. For this reason, the line is operated as a normal between Nurtepe and Mahmutbey and as a shuttle between Çağlayan and Nurtepe.
Kağıthane (M11) Metro Station is an underground metro station under construction on the M11 line of the Istanbul metro. The station is located in the central district of Kağıthane, on Cendere Street.
There is only the entrance to the station on the east side of Kağıthane Stream.
• It is planned to construct new underground stations for M34 (Hızray) and İTÜ Ayazağa - Kağıthane Metro Line, which are in the project phase until the end of 2029, and to ensure integration between the lines.
• Between the M7 and M11 stations, there is a walking distance of about 200 meters between the stations.
References[]
Cite error: A list-defined reference with group name ""
is not used in the content (see the help page).
Cite error: A list-defined reference with group name ""
is not used in the content (see the help page).
Cite error: A list-defined reference with group name ""
is not used in the content (see the help page).
- Istanbul metro stations
- Railway stations opened in 2020
- Proposed railway stations in Turkey