Kennedy Energy Park
Kennedy Energy Park | |
---|---|
Country |
|
Coordinates | 21°S 145°E / 21°S 145°ECoordinates: 21°S 145°E / 21°S 145°E |
Status | Proposed |
Construction began | 2018 |
Owner(s) | Windlab |
Solar farm | |
Type | Flat-panel PV |
Wind farm | |
Type | Onshore |
Site usage | Farm Land |
Rotor diameter |
|
Power generation | |
Units planned | 12 × 3.45 MW |
Nameplate capacity | 50 MW |
External links | |
Website | kennedyenergypark |
Kennedy Energy Park is a wind, solar and storage hybrid power station approximately 20 km south east of Hughenden and 290 km southwest of Townsville in Queensland.
Stage one of the project is a “proof-of-concept” commenced construction 2018, consisting of 30 MW of wind turbines, 20 MW of single axis tracking Solar Panels, and 2 MW of Li ion battery storage, costing $120 million to build and expected to be operational in 2020.[1] It was constructed in 2018 but did not start to connect to the grid until July 2021.[2] It is intended that the combination of solar and wind generation will be complementary and lead to stable output.[3]
Stage two is proposed to be capable of producing 1200 MW of renewable energy, costing $2 billion and was hoped to commence construction before the end of 2020.[4]
See also[]
References[]
- ^ "50MW Wind, Solar and Storage hybrid facility approved". Kennedy Energy Park. Retrieved 28 July 2016.
- ^ Parkinson, Giles (8 July 2021). ""World first" wind, solar and battery project finally starts production after 3-year wait". . Retrieved 11 November 2021.
- ^ "Renewable energy providing near baseload generation". Kennedy Energy Park. Retrieved 11 November 2021.
- ^ "$120m outback Queensland hybrid renewable energy farm gets stage one approval". ABC. Retrieved 28 July 2016.
- Wind farms in Queensland
- Proposed wind farms in Australia
- Proposed solar power stations in Australia
- Solar power stations in Queensland