Line 3 (Rio de Janeiro)
Line 3 (Rio de Janeiro) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Proposed | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | Araribóia Visconde de Itaboraí | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 18 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Rio de Janeiro Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening | Unknown | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 42 km (26 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Line 3 is a planned line of the Rio de Janeiro Metro (Metrô Rio) which would connect Rio de Janeiro and Niterói. This is a challenge due to the fact that the line would need to cross the Guanabara Bay, presumably underwater.
Background[]
The plan to build a subway line connecting Rio de Janeiro to its sister municipality, Niterói, has existed since at least 1968.[1] In the 1968 plan, it was estimated that the line would've been built by 1990.[1] However, that deadline was never met.
Throughout the following years, many more promises were made – and subsequently not kept – by a multitude of governors of Rio de Janeiro regarding the construction of Line 3:
- In 2002, the project was divided into two parts: part 1, with a length of 6 kilometres (3.7 mi), extending underneath Guanabara Bay from Carioca Station (Rio de Janeiro) to (Niterói); and part 2, with a length of roughly 21 kilometres (13 mi), extending from (Niterói) to Guaxindiba (São Gonçalo), with segments above ground.[2][3]
- In 2006, a seminar called "Rio de Janeiro on Rails – Subway Line 3" (Portuguese: Rio de Janeiro nos Trilhos – Linha 3 do Metrô) was held by the Brazilian Association of the Railway Industry (Portuguese: Associação Brasileira da Indústria Ferroviária, shortened as ABIFER) to discuss the implementation of the project of Line 3.[4]
- In 2011, the Brazilian Ministry of Works announced that construction on the line would begin that year for a 2014 opening.[5] The line would feature an existing 23 kilometres (14 mi) suburban rail alignment in Niterói, São Gonçalo and Itaboraí being upgraded to metro standard, and a 4 kilometres (2.5 mi) tunnel under Guanabara Bay to Rio de Janeiro.[6] Federal funds for the construction, totalling R$ 1.2 billion, were initially intended to be granted in 2012, but were barred by Congress in late 2011.[7]
- In September 2013, governor Sérgio Cabral and president Dilma Rousseff announced a partnership between the federal and state governments, with the goal of collecting R$ 2.57 billion in total to be put towards the construction of Line 3.[8]
- In October 2014, governor Pezão stated his intent in starting the construction of Line 3 before the end of the year.[9] Eight months later, in June 2015, Pezão explained that the state's government didn't have the necessary funds to build it, which had an estimated cost of R$ 3.9 billion.[10] The Director Plan of Urban Transportation of 2015 (Portuguese: Plano Diretor de Transportes Urbanos) estimated that construction of its many projects should be done by 2036, but that it would be ideal for them to be finished by 2021.[11]
- In July 2019, governor Wilson Witzel guaranteed that, during his administration, the construction of Line 3 would begin.[12] Six months later, in January 2020, Witzel stated that the administration was considering whether building more boat stations would be more effective than building Line 3.[13] Later that year, in August 2020, Witzel was suspended from office – and was subsequently impeached on April 2021 –, being replaced by Cláudio Castro as governor of Rio de Janeiro.
References[]
- ^ a b Marcolini, Barbara (29 November 2014). "Projeto de 1968 que nunca saiu do papel, metrô até São Gonçalo ainda é um sonho" [1968 project that never became a reality, subway to São Gonçalo is still a dream]. O Globo (in Brazilian Portuguese). Retrieved 9 October 2020.
- ^ "Relatório de Fiscalização - Sintético" (PDF). Tribunal de Contas da União (in Brazilian Portuguese). 2010. pp. 1–2. Retrieved 9 October 2020.
- ^ "Audiência pública apresentou projeto da Linha 3 do metrô" [Public hearing presented subway's Line 3 project] (in Brazilian Portuguese). ABIFER. 18 September 2008. Retrieved 9 October 2020.
- ^ "Rio de Janeiro nos Trilhos discute Presente e Futuro da Linha 3 do Metrô" [Rio de Janeiro on Rails discusses Present and Future of the Subway's Line 3] (in Brazilian Portuguese). ABIFER. 30 November 2006. Retrieved 9 October 2020.
- ^ "Work set to begin on Rio de Janeiro Line 3". Metro Report International. 2 November 2011. Retrieved 6 August 2019.
- ^ "Brazil to begin construction on Rio de Janeiro metro Line 3 by end of the year". Metro Report International. 6 November 2011. Retrieved 6 August 2019.
- ^ Jungblut, Cristiane (22 December 2011). "Congresso suspende repasse federal para a Linha 3 do Metrô" [Congress suspends federal greant for subway Line 3]. Extra (in Brazilian Portuguese). Retrieved 9 October 2020.
- ^ Mendonça, Alba Valéria (11 September 2013). "Dilma anuncia R$ 2,5 bilhões para projeto da Linha 3 do metrô do RJ" [Dilma announces R$ 2,5 billion to Line 3 project of Rio de Janeiro subway]. G1 (in Brazilian Portuguese). Retrieved 9 October 2020.
- ^ "Pezão pretende começar obras da Linha 3 do metrô ainda em 2014". G1. 27 October 2014. Retrieved 9 October 2020.
- ^ "Pezão diz que estado não tem recursos para fazer Linha 3 do Metrô" [Pezão says state doesn't have the resources to build subway Line 3]. G1 (in Brazilian Portuguese). 10 June 2015. Retrieved 9 October 2020.
- ^ Bacelar, Carina; Galdo, Rafael (30 July 2018). "Plano que não começou a sair do papel prevê oito novos trechos de metrô no Rio" [Plan that never became a reality predicts eight new segments for Rio's subway]. O Globo (in Brazilian Portuguese). Retrieved 9 October 2020.
- ^ Seara, Berenice; Macedo, Aline (24 July 2019). "Witzel promete Linha 3 do Metrô a empresários em Itaboraí" [Witzel promises subway Line 3 to businessmen in Itaboraí]. Extra (in Brazilian Portuguese). Retrieved 9 October 2020.
- ^ "Witzel diz que estuda implementar Linha 3 ou estações de barcas em São Gonçalo" [Witzel says he's studying whether to implement Line 3 or boat station in São Gonçalo]. Extra (in Brazilian Portuguese). 24 January 2020. Retrieved 9 October 2020.
Categories:
- Rio de Janeiro Metro
- Rapid transit lines in Brazil
- Proposed rail infrastructure in Brazil
- Brazil transport stubs
- South America rail transport stubs
- South American rapid transit stubs