List of megaprojects in Bangladesh

From Wikipedia, the free encyclopedia

This is a list of megaprojects. "Megaprojects are temporary endeavours (i.e. projects) characterized by: large investment commitment, vast complexity (especially in organizational terms), and long-lasting impact on the economy, the environment, and society". The number of such projects is so large that the list may never be fully completed.

Legend[]

Terms used in the Status Column Status Color
Proposed
In Planning, Approved, Under/In Development, Under Construction, Re-Construction In Progress, Nearly Complete
On Hold
Abandoned, Cancelled
Completed

Roads and transport infrastructure[]

Project Location Length Status Cost Notes Provided Image
Padma Bridge LouhajongMunshiganj, Shariatpur, Madaripur 6.15 km [1] 88% completed[2] $3.6 billion Construction began on December 2014[3] and is expected to be completed by June 2022.[4]
Padma Bridge, November2021(2).jpg
Padma Rail Link Dhaka, Mawa, Bhanga, Jessore 41 km [5] --% completed $4.63 billion Construction began on January 1, 2016 and to be completed by June 30, 2024.[6] Total length of the route is around 169 km. The work has been divided into 4 sections. Secion-1: Dhaka - Gandaria (3 km), Section-2: Gandaria - Mawa (37 km), Section-3: Mawa - Bhanga Junction - Bhanga (42 km), Section-4: Bhanga Junction - Jessore (87 km).
Dhaka MRT Line-1 (Airport Route) Dhaka 18.8 km [7] Proposed $6.1 billion The line will be underground. The length of this line will be 19.872 km (12.348 mi). The line will have 12 underground stations. Stations will be constructed at Shahjalal International Airport, Shahjalal International Airport Terminal 3, Khilkhet, Jamuna Future Park, Notun Bazar, Uttar Badda, Badda, Hatirjheel East, Rampura, Malibagh, Rajarbagh, and Kamalapur Railway Station.[8]
Dhaka MRT Line-1 (Purbachal Route) Dhaka 11.8 km [7] Proposed
Dhaka MRT Line-2 Dhaka -- Proposed
Dhaka MRT Line-4 Dhaka 16 km [9] Proposed $2.8 billion
Dhaka MRT Line-5 (Northern Route) Dhaka 20 km [7] Proposed
Dhaka MRT Line-5 (Southern Route) Dhaka 17.4 km [7] Proposed
Dhaka MRT Line-6 Dhaka 20.1 km [7] 73% completed[10] $2.8 billion Dhaka Metro Rail Line-6 consists of 16 elevated stations each 180m long and 20.1 km of electricity powered light rail tracks. Construction began on 26 June 2016 and is expected to end by 2022.
Dhaka Mass Rapid Transit Development Project.jpg
Dhaka Elevated Expressway Dhaka 46.73 km [11] --% completed $1.63 billion Construction began on 2011 and to be completed by December 30, 2022.[12] The work has been divided into 3 sections. Secion-1: Shahjalal international airport to Banani (7.45 km), Section - 2: Banani to Moghbazar (5.85 km), Section - 3: Moghbazar to Kutubkhali (6.43 km). Airport-Banani section has made 59% progress. Banani-Moghbazar section has made 9% progress.[13]
Karnaphuli Tunnel Chattogram, Karnaphuli River 3.32 km [14] 75% completed[15] $1.2 billion First underwater tunnel in South Asian region, part of Dhaka-Chattogram-Cox's Bazaar highway network. Karnaphuli Tunnel is expected to be completed by December, 2022.[4]
Chattogram-Cox's Bazar Railway Link Chattogram, Cox's Bazar 100 km [16] 62% completed[17] $2.13 billion Civil works for the project began in March 2018 and the deadline for the Chattogram-Cox's Bazar rail line is June 2022. Project officials are hopeful of a 2022 completion or early 2023.[18]
 Sirajganj, Jamuna River 4.8 km [19] 1% completed $1.6 billion 4.8 km long railway bridge near Bangabandhu Bridge, is expected to be the largest dedicated rail bridge in the country.[20][21]
Rupsha Rail Bridge Khulna, Rupsha RIver 5.13 km [22] 75% completed -- The bridge has 7 nos. of 102.4m long Double Warren Open-web Truss Girders with 136 nos. of 32.2 m long Composite Plate Girders for Viaducts on either side.
Hazrat Shahjalal (R) International Airport Terminal 3  Dhaka -- 22% completed[23] $2.5 billion Expansion will include a passenger terminal with a floor area of roughly 226,000 m2 (2,430,000 sq ft); a 5,900 m2 (64,000 sq ft) square VVIP complex; a 41,200 m2 (443,000 sq ft) cargo building; and multi-level car park building with a tunnel. Upon completion of the third terminal, passenger handling capacity of the airport will increase to 20 million from current 8 million per annum. Cargo handling capacity will also increase to 500,000 from 200,000 tonnes annually [24]
Dhaka Subway  Dhaka 238 km [25] Proposed $8 billion Dhaka Subway is an underground urban rail network being planned in Dhaka, the capital city of Bangladesh, by the Bangladesh Bridge Authority. It will have 11 lines with a total length of 258 kilometres (160 mi). The first subway expected to be built is a route 28.71 kilometres (17.84 mi) long between Tongi and Jhilmil at a cost of $8 billion. Three more routes are likely to be built by 2030 with the entire network completed in 2041.[26]
Dhaka-Chattogram high-speed railway  Dhaka-Chattogram 227.3 km [27] Proposed $15 billion China and Australia has shown interest in financing the project. Pending government approval.[28]
Chattogram Metro Rail  Chattogram -- Proposed Pending approval from Road Transport and Highways Division.[29]
Chittagong Elevated Expressway Chattogram 18 km [30] 5% completed $4 billion

Energy projects[]

Project Location Capacity (MW) Status Cost Notes Provided Image
Rooppur Nuclear Power Plant Ishwardi 2400 [31] 77% completed $12.65 billion It will be the country's first nuclear power plant, and the first of two units are expected to go into operation in 2023.
Ruppur-atomic.jpg
Matarbari Power Plant Cox's Bazar 1200 [32] 30% completed 4.5 Billion Some 30% of construction work on the 1200MW Matarbari coal-fired power plant was completed as of July last as Coal Power Generation Company Bangladesh Limited (CPGCBL), the implementing agency, has a target to complete the most expensive scheme by June 2023, shows an official document.
Nuclear Power Plant Southern Bangladesh Proposed On 11 October 2021, while inaugurating installation of reactor at Rooppur Nuclear Power Plant, PM Sheikh Hasina expressed government's plan to build second power plant in Southern Bangladesh.[33]

Ports[]

Project Location Status Cost Notes Provided Image
Matarbari Deep Sea Port Maheshkhali, Cox's Bazar 18% completed $2.409 billion This will be the first deep sea port of Bangladesh. Projected completion in 2026.

Defense[]

Project Location Status Cost Notes Provided Image
Guided Missile Frigate Project Chittagong Dry Dock Limited 1% completed Approx. $2.0 - $2.5 billion Six stealth guided missile frigates are expected to be constructed at Chittagong Dry Dock Limited for Bangladesh Navy and launched into service in 2030.
BNS Sheikh Hasina Submarine Base Cox's Bazar, Chittagong 60% completed $1.2 billion A full-fledged submarine base of the Bangladesh Navy being constructed with technical assistance from China.

Buildings[]

Project Location Height Status Cost Notes Provided Image
Legacy Tower Purbachal 465 m Under construction n/a 111-floor supertall commercial skyscraper.
Liberation Tower Purbachal 328 m Under construction n/a 71-floor supertall commercial skyscraper.
Language Tower Purbachal 259 m Under construction n/a 52-floor commercial skyscraper.
Purbachal CBD Purbachal -- Under construction $17 billion Three super-tall skyscrapers, surrounded by thirty-eight 40+ floor skyscrapers.
Iconic Tower Purbachal 734 m Vision $1.2 billion 142-floor supertall skyscraper.
Sheikh Hasina Tower Dhaka -- Proposed n/a Supertall 75 story commercial skyscraper as a centerpiece of proposed CBD on the banks of Buriganga river.[34]
Jolshiri Twin Towers - Tower 1 Jolshiri Abashon n/a Proposed n/a Proposed skyscraper in Jolshiri Abashon CBD.[35]
Jolshiri Twin Towers - Tower 2 Jolshiri Abashon n/a Proposed n/a Proposed skyscraper in Jolshiri Abashon CBD.[36]
Jolshiri Abashon CBD Jolshiri Abashon n/a Under construction n/a A modern Central Business District with skyscrapers, high rises, glass and modern buildings with advanced facilities.[37]

Sports[]

Project Location Capacity Status Cost Notes Provided Image
Sheikh Hasina International Cricket Stadium - The Boat Purbachal 50,000 - 70,000 Under construction $140 million Largest stadium in the country, most expensive cricket stadium in Asia, and third largest cricket stadium in the world upon completion.

Barrages[]

Project Location Status Cost Notes Provided Image
Rangpur Division Proposed $1 Billion Taming and irrigation project because of the periodic drying up of the Teesta River in Bangladesh due to the Dam and water block by India.[38][39][40]

Satellites[]

Project Status Cost Vehicle Notes Provided Image
Bangabandhu Satellite-1 Launched $248 million United States Falcon 9 Launched in 2018
Bangabandhu Satellite-1 Mission (42025498972).jpg
Bangabandhu Satellite-2 Approved n/a Bangladesh Satellite Company Ltd (BSCL) has already signed a cooperation contract with Glavkosmos from Russia for the purpose of launching Bangabandhu 2 satellite by December 2023.[41]

References[]

  1. ^ "Padma Bridge". Institution of Civil Engineers (ICE). 2016-11-18. Archived from the original on 2021-12-12. Retrieved 2021-12-12.
  2. ^ "Quader: Carpeting on Padma Bridge to begin in November". Dhaka Tribune. 3 October 2021. Archived from the original on 4 October 2021. Retrieved 4 October 2021.
  3. ^ "Padma Multipurpose Bridge Project". padmabridge.gov.bd. Archived from the original on 12 May 2021. Retrieved 16 February 2020.
  4. ^ a b "18 Key Road, Rail Projects: Physical work to go on amid lockdown". The Daily Star. 2 July 2021. Archived from the original on 11 July 2021. Retrieved 11 July 2021.
  5. ^ "Design Review Padma Rail Link Project". Archived from the original on 2021-04-19. Retrieved 2021-12-12.
  6. ^ "Padma Rail Link Project". databd.co. Archived from the original on 26 April 2021. Retrieved 25 April 2021.
  7. ^ a b c d e "Dhaka Metro Mass Rapid Transit System, Bangladesh". railway-technology.com. Archived from the original on 2021-12-12. Retrieved 2021-12-12.
  8. ^ "Dhaka Mass Transit Company Limited (DMTCL)". dmtcl.gov.bd. Retrieved 2021-12-12.
  9. ^ Byron, Rejaul Karim; Adhikary, Tuhin Shubhra (2019-10-15). "Dhaka Metro Rail: Two more lines to cost Tk 93,800cr". The Daily Star. Archived from the original on 2020-01-24. Retrieved 2021-12-12.
  10. ^ "Metro rail sees 73% progress". Dhaka Tribune. 5 December 2021. Archived from the original on 5 December 2021. Retrieved 5 December 2021.
  11. ^ "Dhaka Elevated Expressway PPP Project". Bangladesh Bridge Authority. 2015-09-23. Archived from the original on 23 September 2015. Retrieved 2021-12-12.
  12. ^ "Dhaka Elevated Expressway". databd.co. Archived from the original on 26 April 2021. Retrieved 25 April 2021.
  13. ^ "Dhaka Elevated Expressway: Work on to open Airport-Tejgaon part by December". The Business Standard. 2021-02-23. Archived from the original on 2021-07-19. Retrieved 2021-07-19.
  14. ^ "Karnaphuli tunnel to be ready for vehicular movement by next year". The Financial Express. Dhaka. Archived from the original on 2021-12-12. Retrieved 2021-12-12.
  15. ^ "Govt shifting focus from bridges to tunnels: Quader". The Business Standard. 1 October 2021. Archived from the original on 2 October 2021. Retrieved 2 October 2021.
  16. ^ "Dohazari-Cox's Bazar rail route to open December 2022: Railways minister". The Daily Star. 2021-09-22. Archived from the original on 2021-12-31. Retrieved 2021-12-12.
  17. ^ "Dohazari-Cox's Bazar rail route to open December 2022: Railways minister". The Daily Star. 22 September 2021. Archived from the original on 31 December 2021. Retrieved 22 September 2021.
  18. ^ "Chattogram-Cox's Bazar railway link". The Daily Star. 4 June 2021. Archived from the original on 3 June 2021. Retrieved 4 June 2021.
  19. ^ "Bangladesh starts construction on Bangabandhu Sheikh Mujib bridge". railway-technology.com. 30 November 2020. Archived from the original on 2021-12-12. Retrieved 2021-12-12.
  20. ^ "Bangladesh starts construction on Bangabandhu Sheikh Mujib bridge". 30 November 2020. Archived from the original on 2020-11-30. Retrieved 2020-12-18.
  21. ^ "PM to lay foundation stone of Bangabandhu Rail Bridge Sunday". Dhaka Tribune. BSS. 28 November 2020. Archived from the original on 22 December 2021. Retrieved 22 December 2021.
  22. ^ দৃশ্যমান রূপসা রেলসেতু, ২০ শতাংশ কাজ শেষ. banglanews24.com (in Bengali). 2018-10-24. Archived from the original on 2021-12-17. Retrieved 2021-12-17.
  23. ^ "3rd terminal of Dhaka airport to be visible by Dec: CAAB". The Daily Star. UNB. 22 September 2021. Archived from the original on 22 September 2021. Retrieved 22 September 2021.
  24. ^ "Dhaka airport's third terminal to be completed 'in time'". Business Standard. 9 August 2020. Archived from the original on 27 April 2021. Retrieved 4 January 2021.
  25. ^ "Osaka style subway in Dhaka". bangladeshpost.net. Archived from the original on 2021-12-12. Retrieved 2021-12-12.
  26. ^ "Subway to be constructed despite challenges". Dhaka Tribune. 24 March 2021. Archived from the original on 29 June 2021. Retrieved 20 July 2021.
  27. ^ "overpass turbo". overpass-turbo.eu. Archived from the original on 2021-12-08. Retrieved 2021-12-12.
  28. ^ "Two Chinese state firms show interest in Dhaka-Chattogran high-speed train". The Financial Express. Dhaka. Archived from the original on 5 June 2021. Retrieved 5 June 2021.
  29. ^ "Govt moves to set up metro rail in port city". The Daily Star. 2020-12-19. Archived from the original on 2021-06-05. Retrieved 5 June 2021.
  30. ^ "Great expectations precede elevated expressway in Chittagong". Dhaka Tribune. 2019-07-01. Archived from the original on 2021-12-12. Retrieved 2021-12-12.
  31. ^ "Rooppur Nuclear Power Plant, Ishwardi, Bangladesh". power-technology.com. Archived from the original on 2021-04-28. Retrieved 2021-12-12.
  32. ^ "Matarbari coal-fired power plant, Cox Bazaar, Bangladesh". Archived from the original on 2021-12-12. Retrieved 2021-12-12.
  33. ^ Al-Arshani, Sarah. "'We will join the world's nuclear powers, but for peace' says Bangladesh's prime minister as the country's first reactor takes major step towards completion". Insider. Archived from the original on 31 December 2021. Retrieved 11 October 2021.
  34. ^ "Mayor Taposh unveils new plan for Dhaka". New Age. Archived from the original on 25 June 2021. Retrieved 5 June 2021.
  35. ^ "Shanghai Huadu Architecture and Urban Design Co., Ltd. (HDD) - A smart city under construction in a unique ecological area: Jolshiri Abashon CBD". The Plan (in Italian). Retrieved 2022-02-12.
  36. ^ "Shanghai Huadu Architecture and Urban Design Co., Ltd. (HDD) - A smart city under construction in a unique ecological area: Jolshiri Abashon CBD". The Plan (in Italian). Retrieved 2022-02-12.
  37. ^ "Shanghai Huadu Architecture and Urban Design Co., Ltd. (HDD) - A smart city under construction in a unique ecological area: Jolshiri Abashon CBD". The Plan (in Italian). Retrieved 2022-02-12.
  38. ^ "Teesta: Bangladesh turns from India to China to transform major river". 21 October 2020. Archived from the original on 29 November 2020. Retrieved 18 December 2020.
  39. ^ "Explained: China twist in the India-Bangladesh Teesta river challenge". The Indian Express. 26 August 2020. Archived from the original on 16 November 2020. Retrieved 18 December 2020.
  40. ^ "What does Chinese interest in the Teesta mean for India?". The Hindu. Archived from the original on 2020-11-29. Retrieved 2020-12-18.
  41. ^ "Govt signs cooperation deal with Russia's Glavkosmos to launch Bangabandhu Satellite-2". The Daily Star. 2022-02-02. Retrieved 2022-02-03.
Retrieved from ""