Meizhou–Longchuan high-speed railway
Meizhou–Longchuan high-speed railway 梅龙高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Termini | Meizhou West Longchuan West |
Stations | 4 |
Service | |
Operator(s) | China Railway High-speed |
History | |
Opened | 2023 |
Technical | |
Line length | 95.6 km (59 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The Meizhou–Longchuan high-speed railway is a high-speed railway currently under construction in China.
The line will be 95.6 kilometres (59.4 mi) long when completed and will have a design speed of 350 kilometres per hour (220 mph).
History[]
Construction officially began on 15 December 2019 and is expected to take four years.[1]
Stations[]
Station Name | Chinese | China Railway transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Meizhou West | 梅州西 | Meizhou–Chaoshan railway | ||||||||
兴宁南 | ||||||||||
五华 | ||||||||||
Longchuan West | 龙川西 | Ganzhou–Shenzhen high-speed railway (under construction) |
References[]
- ^ "政务要闻-梅州市人民政府门户网站". www.meizhou.gov.cn. Retrieved 2020-07-17.
Categories:
- High-speed railway lines in China
- High-speed railway lines under construction
- People's Republic of China rail transport stubs