Murowa diamond mine

From Wikipedia, the free encyclopedia
Murowa diamond mine
Location
Murowa diamond mine is located in Zimbabwe
Murowa diamond mine
Murowa diamond mine
Location in Zimbabwe
Country Zimbabwe
Coordinates20°29′29″S 30°24′10″E / 20.49139°S 30.40278°E / -20.49139; 30.40278Coordinates: 20°29′29″S 30°24′10″E / 20.49139°S 30.40278°E / -20.49139; 30.40278
Production
ProductsDiamonds
History
Opened2004
Owner
CompanyRio Tinto Group (majority stake)

The Murowa diamond mine is a diamond mine located in Mazvihwa, south central Zimbabwe, about 40 kilometres from the asbestos mining town of Zvishavane in the Midlands province. The mine is majority owned and operated by the Rio Tinto Group, which also owns the Argyle diamond mine in Australia and part of the Diavik Diamond Mine in Canada. The mine is a combination of open pit and underground construction; current estimates put construction costs at $61 million USD and mine reserves are 19 million tonnes of ore, with an ore grade of 0.9 carats (180 mg) per tonne.

Geology of the Deposit[]

Murowa consists of three north-trending kimberlite pipes, intrusive into the Chivi suite granites of the Zimbabwe Craton. The kimberlites have been dated at 500 Ma.[1]

History[]

The Murowa site's possibilities were first realized in 1997 when three diamond-bearing kimberlite pipes were discovered; over a period of three years of study, the two larger pipes have been determined to be economically feasible as mines. Construction of mine facilities was completed in late 2004. Preparation for mining included the forced relocation of 926 people living on the mine site to six farms purchased by a government relocation program. Limited mining operations began in Murowa in 2004, with full capacity expected to be reached sometime in 2005, although permitting problems have slowed progress toward this milestone. Full-scale production is expected to process 200,000 tonnes of ore annually, although it is possible to push production to as much as one million tonnes annually through further capital investment.

The mine is a combination of open pit and underground construction; current estimates put construction costs at $61 million USD. Current estimates of mine reserves are 19 million tonnes of ore, with an ore grade of 0.9 carats (180 mg) per tonne. Rio Tinto estimates that over the life of the mine, prices for the Murowa's production will fetch an average price of $65 USD per carat (325 $/g).

References[]

  1. ^ D Chatora (October 2009). "Report on the Geological Society Field Trip to Murowa Diamonds". Geological Society of Zimbabwe Newsletter: 9–12.
Retrieved from ""