Nansha Port railway

From Wikipedia, the free encyclopedia
Nansha Port railway
Overview
Native name南沙港铁路
StatusUnder construction
Termini[1]
[2]
Service
TypeHeavy rail
Technical
Line length88 km (55 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed120 km/h (75 mph)[1]

The Nansha Port railway (Chinese: 南沙港铁路; pinyin: Nánshāgǎng tiělù) is a railway line currently under construction in China.[3] It is expected to be completed by late 2021.[3]

History[]

Construction began in 2016. During construction, this line was changed from a freight-only railway to a combined passenger and freight line.[4]

Design[]

The line is electrified and double-tracked, 88 kilometres (55 mi) long, and will have a maximum speed of 120 kilometres per hour (75 mph). It leaves the existing Guangzhou–Zhuhai railway at [1] and heads east.

Stations[2][]

References[]

  1. ^ a b c d "广州南沙港铁路拟变更为客货共线 新增滨江新区站等4座车站". Archived from the original on 2021-09-27.
  2. ^ a b "这些铁路线路和车站命名(更名)正式确定". Archived from the original on 2021-11-21.
  3. ^ a b "南沙港铁路预计年底运营". 2021-09-03.
  4. ^ "增开动车组、新增4座车站……南沙港铁路环评出炉!" [Add train sets, add 4 stations... Nansha Port Railway Environmental Assessment!]. Dayoo News (in Chinese). 30 April 2020. Retrieved 18 January 2021.{{cite web}}: CS1 maint: url-status (link)
Retrieved from ""