Nansha Port railway
![]() | This article needs additional citations for verification. (January 2021) |
Nansha Port railway | |
---|---|
Overview | |
Native name | 南沙港铁路 |
Status | Under construction |
Termini | [1] [2] |
Service | |
Type | Heavy rail |
Technical | |
Line length | 88 km (55 mi)[1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 120 km/h (75 mph)[1] |
The Nansha Port railway (Chinese: 南沙港铁路; pinyin: Nánshāgǎng tiělù) is a railway line currently under construction in China.[3] It is expected to be completed by late 2021.[3]
History[]
Construction began in 2016. During construction, this line was changed from a freight-only railway to a combined passenger and freight line.[4]
Design[]
The line is electrified and double-tracked, 88 kilometres (55 mi) long, and will have a maximum speed of 120 kilometres per hour (75 mph). It leaves the existing Guangzhou–Zhuhai railway at [1] and heads east.
Stations[2][]
- (freight)
- Nansha (interchange to Guangzhou Metro Line 18 via )
- (freight)
- (freight)
References[]
- ^ a b c d "广州南沙港铁路拟变更为客货共线 新增滨江新区站等4座车站". Archived from the original on 2021-09-27.
- ^ a b "这些铁路线路和车站命名(更名)正式确定". Archived from the original on 2021-11-21.
- ^ a b "南沙港铁路预计年底运营". 2021-09-03.
- ^ "增开动车组、新增4座车站……南沙港铁路环评出炉!" [Add train sets, add 4 stations... Nansha Port Railway Environmental Assessment!]. Dayoo News (in Chinese). 30 April 2020. Retrieved 18 January 2021.
{{cite web}}
: CS1 maint: url-status (link)
Categories:
- Railway lines in China