Line 18 (Guangzhou Metro)

From Wikipedia, the free encyclopedia

Line 18
 18 
L18 Concourse N., Panyu Square Station, Guangzhou Metro 20210929-B.jpg
Concourse of Panyu Square Station
Overview
Other name(s)North-South express line (Chinese: 南北快线)
Nansha express line (Chinese: 南沙快线)
StatusOperational
OwnerCity of Guangzhou
Termini
(current)
Stations8 (+1 under construction)
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangdong Intercity
(Wholly-owned subsidiary of Guangzhou Metro Corporation)
History
Opened28 September 2021 (Wanqingsha – Xiancun section)[1]
Technical
Line length58.3 km (36.2 mi) (Wanqingsha—Xiancun section)[2][3]
61.3 km (38.1 mi) (full Phase 1)[3]
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV 50 Hz AC overhead catenary
Operating speed160 km/h (99 mph)[4]
Route map

Legend
 3  Up arrow to Airport North (Terminal 2)
 11 
Left arrow anti-clockwise
clockwise Right arrow
Guangzhou East Railway Station
China Railway  1   3   11 
 1  Left arrow to Xilang
 13 
 13 
Left arrow to
to Yuzhu Right arrow
Modiesha
 8 
 11 
 11 
Left arrow clockwise
anti-clockwise Right arrow
Nancun Wanbo
 7 
 22  Left arrow to Fangcun
Panyu Square
 3   22 
 3  to Haibang Right arrow
Longzhen Stabling Yard
Wanqingsha Depot
Line 18 drawn to scale.

Line 18 of Guangzhou Metro (Chinese: 广州地铁18号线; pinyin: Guǎngzhōu Dìtiě Shíbāhàoxiàn) is a rapid transit express line in Guangzhou.[5][6] It will run in a south-north direction, connecting Wanqingsha in Nansha District, Panyu Square in Panyu District, Modiesha in Haizhu District, Zhujiang New Town and Guangzhou East Railway Station in Tianhe District. The line commenced service on 28 September 2021.[1]

Summary[]

Phase 1[]

The 61.3 km (38.1 mi) line, roughly north-south, connects in Nansha District with Guangzhou East Railway Station, with only seven stations in between, , Panyu Square, Nancun Wanbo, , , Modiesha, .[3] The line is an express subway line using 8-car Type D trains with an operating speed of 160 km/h (99 mph).[7] This high speed can be sustained especially on the 26 km section between Panyu Square and Hengli stations.

The service between Wanqingsha and Xiancun was opened on 28 September 2021. There are 2 distinct stopping patterns operating, a local all stop service and an express service stopping only at Hengli and Panyu Square. The local service will take only 37 minutes from Wanqingsha to XIancun, and the express service is even shortened by 7 minutes.[8]

North extension[]

The north extension of Line 18, also known as "Guangzhoudong to Huadu Tiangui intercity" (Chinese: 广州东至花都天贵城际) or "Guanghua intercity" (Chinese: 广花城际), will be 39.6 km in length with 7 new stations, to Huachengjie in Huadu District of Guangzhou. It will be fully underground.[9] At Fangshi Station provisions are made to allow for Line 18 trains to interline into Line 22 to directly serve Guangzhou Baiyun International Airport.[10] A branch line via Huadu Railway Station allowing for through service to and from the Guangzhou-Qingyuan Intercity Railway is also under planning.[11]

South extension[]

An extension is planned that would see the line extended to Zhongshan and Zhuhai. This extension is also known as "Nansha to Zhuhai (Zhongshan) intercity" (Chinese: 南沙至珠海(中山)城际) or "Nanzhongzhu intercity" (Chinese: 南中珠城际). Construction on the extension is expected to start before the end of 2021.[12] Since November 2020, Zhuhai Municipal government is also studying extending Line 18 to connect with the Hong Kong–Zhuhai–Macau Bridge at the Zhuhai-Macao Port artificial island.[13][14][11] Additionally, the "Zhongshan City Comprehensive Transportation Plan (Revision)" proposed a connection line south of Wanqingsha Station, to allow Line 18 to through operate into the Shenzhen–Dayawan intercity railway.[15]

Planning[]

Line 18 and Line 22 were originally planned as long-term projects, but the desire to promote development of the Nansha Free Trade Zone fast tracked the project for construction. Line 18 will be designed as an express line to provide a rapid transit link between Nansha District and the central urban area of Guangzhou. The planned travel time between Nansha Free Trade Zone and central Guangzhou is proposed to be 30 minutes.[16][17]

The government received a number of requests from the public to increase the number of stations along the line. In particular a station at Tianhe Sports Center allowing from interchange with Line 1[18] and a station at Yuwotou Town.[19] The planners rejected the suggestions to maintain the line's wide stop spacing to allow for the target of 30 minute travel time Nansha and central Guangzhou. Together with the planned Line 26 along Guangzhou Avenue, Line 18 is expected to provide some relief to Line 3.

Opening time[]

Segment Commencement Length Station(s) Name
Xiancun — Wanqingsha 28 September 2021 58.3 km (36.2 mi)[3][2] 8 Phase 1
Guangzhou East Railway Station — Xiancun TBA (Under construction) 3.0 km (1.9 mi) 1

Stations[]

Legend

  - Opened on 28 September 2021
  - Under construction

Section Station

R L Station name[3] Connections Location
English Chinese
North ext. Huachengjie 花城街  Guangzhou East Ring Intercity  Huadu
Ma'anshan Park 马鞍山公园  9 
凤凰南路
方石  22  Baiyun
白云城市中心  22 
Baiyun Dongping 白云东平  14 
京溪路
Phase 1 Guangzhou East Railway Station 广州东站  1   3   11  Guangzhou East railway station GGQ Tianhe
18 08 冼村  13 
18 07 Modiesha 磨碟沙  8  Haizhu
18 06 龙潭  11 
18 05 沙溪 Panyu
18 04 Nancun Wanbo 南村万博  7 
18 03 Panyu Square 番禺广场  3   22 
18 02 横沥 Nansha
18 01 万顷沙   
Nansha railway station Nansha railway station

Rolling Stock[]

Line 18 uses 8 car Type D urban express trains with a maximum operating speed of 160 km/h, which is currently the fastest subway line in mainland China. The trains are manufactured by CRRC Zhuzhou Locomotive with the first train was officially delivered on September 25, 2020.[20] Initially upon opening, 15 trains were put into operation.[21] Line 18 is the first line of Guangzhou Metro to introduce different thermostat settings in each car and set up first class cars. In the future, differentiated charges will be implemented to meet the needs of different passengers.[10]

References[]

  1. ^ a b "官宣!十八号线首通段开通时间定了". Guangzhou Metro. 27 September 2021. Retrieved 27 September 2021.
  2. ^ a b "广州地铁18号线陇枕停车场首次迎接"活力橙"". 20 February 2021. 广州市2021年十件民生实事显示,2021年广州将力争开通试运营地铁18号线先通段(万顷沙-冼村,58.3公里)、22号线先通段(番禺广场-陈头岗,18.2公里)
  3. ^ a b c d e "十八号线首通段"轨通"". 全长61.3公里,其中首通段58.3公里
  4. ^ 广州最高规格地铁——18号线、22号线计划2020年建成 (in Simplified Chinese). bendibao.com. 25 July 2017.
  5. ^ 广州市城市轨道交通近期建设规划(2016-2022年). 广州公共资源交易网.
  6. ^ 珠三角12条地铁线路今年开工!1小时生活圈来了 (in Simplified Chinese). NetEase News. 25 February 2018.
  7. ^ "详细页". www.gzggzy.cn. Retrieved 12 June 2020.
  8. ^ "29分钟!冼村"飞到"横沥 - ��州市人民政府门户网站". www.gz.gov.cn. Retrieved 20 September 2021.
  9. ^ "广州地铁18、22号线北延段有新进展". 25 August 2021. 广州地铁18号线北延段,线路起于广州东站(不含),止于花城街站,线路长约39.6公里,全地下敷设
  10. ^ a b "18号线"满月":又有两个广州"首次" 但还有这点遗憾_广州日报大洋网". news.dayoo.com. Retrieved 4 January 2022.
  11. ^ a b "广清城际又有好消息!地铁18号线北延段将设联络线!". Weixin Official Accounts Platform. Archived from the original on 23 November 2020. Retrieved 4 January 2022.
  12. ^ "广州地铁18号线南延段今年年底开工" [The southern extension of Line 18 of the Guangzhou Metro will start construction at the end of this year] (in Chinese). 26 January 2021. Retrieved 26 January 2021.{{cite web}}: CS1 maint: url-status (link)
  13. ^ 中国电力招标网 (20 November 2020). "珠海市自然资源局《南沙至珠海(中山)城际连接至人工岛规划方案研究》采购项目招标公告_中国电力招标网". www.dlzb.com. Retrieved 4 January 2022.
  14. ^ "广州日报数字报-18号线正研究延至港珠澳大桥口岸". gzdaily.dayoo.com. Retrieved 4 January 2022.
  15. ^ "广州18号线有望接驳深圳,南沙明���湾30分钟到机场_广州日报大洋网". 22 June 2021. Archived from the original on 22 June 2021. Retrieved 4 January 2022.
  16. ^ "壕气!投三千来亿,广州未来15年新建15条地铁线_广州日报大洋网". 23 December 2015. Archived from the original on 23 December 2015. Retrieved 12 June 2020.
  17. ^ "广州新一轮地铁规划将杀到 15条线路详解(图)_广州新闻_南方网". 4 March 2016. Archived from the original on 4 March 2016. Retrieved 12 June 2020.
  18. ^ "广州地铁18号线能加个体育东站吗?_广州日报大洋网". 19 May 2017. Archived from the original on 19 May 2017. Retrieved 12 June 2020.
  19. ^ "榄核大岗诉求如何实现?鱼窝头加个站可缓解". news.ycwb.com. Retrieved 12 June 2020.
  20. ^ "对标"复兴号"!中国最高时速地铁在广州首次亮相_南方网". news.southcn.com. Retrieved 4 January 2022.
  21. ^ "时速达160公里!湾区"最快地铁"今日开通_央广网". www.cnr.cn. Retrieved 4 January 2022.
Retrieved from ""