Line 10 (Guangzhou Metro)

From Wikipedia, the free encyclopedia
Line 10
 10 
Overview
Other name(s)M10 (plan name)
Wushan line (五山线)
StatusUnder construction
OwnerCity of Guangzhou
TerminiXilang
Tianhe Coach Terminal
Stations19
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
History
Opened2022
Technical
Line length26.9 km (16.7 mi)
including the Wushan section
Track gauge1,435 mm (4 ft 8+12 in)
Line 10
Simplified Chinese广州地铁10号线
Traditional Chinese廣州地鐵10號線
Line 10 drawn to scale.

Line 10 of the Guangzhou Metro is a rapid transit rail line currently under construction in Guangzhou. Line 10 will incorporate Line 3's spur line into Line 10 once it becomes operational. Line 10 will connect Tianhe with Liwan via Haizhu. Line 10 mainly runs parallel in-between Line 2 and Line 3 in Haizhu. Line 10 has been under construction since January 2018.[1]

Station[]

Station
Station name Connections Distance
km
Location
English Chinese
Xilang 西塱  1   Guangfo   22  0.00 0.00 Liwan
广钢新城
东沙
大干围 Haizhu
Shixi 石溪  Guangfo 
Dongxiaonan 东晓南  2 
五凤  11 
中大南门
滨江东路
Donghu 东湖  6   12  Yuexiu
Shuqian Lu 署前路
寺右新马路  5  [a]
广州大道中 Tianhe
天河路  1  [b]  3  [b]
Shipaiqiao 石牌桥
Gangding 岗顶
South China Normal University 华师  11 
Wushan 五山
Tianhe Coach Terminal 天河客运站  6 
  1. ^ Out of system transfer via Wuyangcun
  2. ^ a b Out of system transfer via Tiyu Xilu

References[]

  1. ^ "广州地铁10号线、3号线东延段工程可行性研究报告获批复". CaMet. Guangzhou Daily. Retrieved 4 September 2018.
Retrieved from ""