Urban rail transit in China
Urban rail transit in the People's Republic of China encompasses a broad range of urban and suburban electric passenger rail mass transit systems including subway, light rail, tram and maglev.[1] Some classifications also include non-rail bus rapid transport. China has the world's longest urban rail transit system that was more than 7,500 km (4,700 mi) long, as of 2020.[2]
As of 2020, China had put 233 urban rail transit lines into operation in 44 cities.[2] By 2019, China had more than 6,100 km of subway or metro lines.[3] As of 2020, China boasts the top 4 longest metro systems in the world -- Shanghai, Beijing, Guangzhou, and Chengdu being the top 4 cities. Nine of the world's 15 longest metro systems are in China. Although the Shanghai Metro only started operating in 1993, it is now the world's longest subway system.[4][5][6] Half of the top ten busiest metro systems in the world are in China.[7] By early-2020, Mainland China had opened 41 metro systems with 185 metro lines.[8]
History[]
showSystems among Provincial-level administrative divisions |
---|
Several Chinese cities had urban electric tramways in the early 20th century, which were dismantled in the 1950s–1970s. Nanjing had an urban railway from 1907 to 1958. The first subway in China was built in Beijing in 1969. The Tianjin Metro followed in 1984. Hong Kong, at the time still under British colonial rule, completed its first section of subway in 1979. Today, Hong Kong's MTR Corporation has investment, consulting and management stakes in the rapid transit systems of several mainland Chinese cities.
The rapid growth of the Chinese economy since the 1980s has created a huge surge in demand for urban transport. This prompted cities across China to pursue and draft proposals for subway networks, with Shanghai and Guangzhou opening their first sections of subway in the 90s, inspiring more cities to propose subway networks. In 1995, the Central Government, alarmed by the high cost and financial debt from these ambitious subway plans, put out a "notice on the suspension of approval of urban underground rapid rail transit projects" barring new subway systems outside of Beijing, Tianjin, Guangzhou and Shanghai from being built.[9] At the time Nanjing, Wuhan, Chongqing, Dalian and Shenzhen had advanced proposals waiting to be approved. Wuhan, Chongqing, Dalian managed to circumvent the moratorium on subway construction by constructing and opening lower cost elevated lines, light metros, and monorails in the early 2000s. Rapid urbanization of China lead to severe congestion and pollution in urban areas leading to the suspension being lifted. Initially, light metro lines using small profile and shorter rolling stock were constructed to reduce costs. It was assumed that as ridership grows the line will operate trains at a low headway to increase capacity. This design paradigm was known in China as "small groups, high density" operation.[10][11][12] However, after a few years operating, many of these lines such as Guangzhou Metro Line 3, Line 6, Shanghai Metro Line 6, and Line 8 were severely overcapacity. Guangzhou Metro Line 3 was able to reconfigure from 3-car trains into 6-car trains to slightly relieve overcapacity. This led many cities such as Beijing, Guangzhou, Wuhan and Chengdu to use higher capacity designs on newer lines.
Since the mid-2000s, the growth of rapid transit systems in Chinese cities has rapidly accelerated, with most of the world's new subway mileage in the past decade opening in China.[13][4][14][15] From 2009 to 2015, China built 87 mass transit rail lines, totaling 3,100 km (1,900 mi), in 25 cities at the cost of ¥988.6 billion.[16] In 2016, the Chinese government lowered the minimum population criteria for a city to start planning a metro system from 3 million to 1.5 million residents.[17] As part of its 13th Five Year Plan, the Chinese government published a transport whitepaper titled "Development of China's Transport". The plan envisions a more sustainable transport system with priority focused on high-capacity public transit particularly urban rail transit and bus rapid transit. All cities with over 3 million residents will start or continue to develop urban rail networks. Regional rail networks will be constructed internally connect and integrate urban agglomerations such as the Jingjinji, Yangtze River Delta and Pearl River Delta areas.[18][19] In 2017, some 43 smaller third-tier cities in China have received approval to develop subway lines.[20]
Urban rapid transit systems[]
Stats[]
Urban rapid transit systems[]
hideSystem | Locale | Lines | Stations | Length (km) | Operation start | Annual ridership | Busiest station |
---|---|---|---|---|---|---|---|
Beijing Subway ( ) | Beijing & Langfang | 24[a] | 428[a] | 727[a] | 1969-10-01[b] | 3848.4 million (2018)[21] | Xizhi Men (2018)[22] |
Changchun Rail Transit | Changchun | 4[c] | 59[c] | 68.27[c] | 2011-06-30[d] | [22] | 127.3 million (2018)Changchun Railway Station (2018)[22] |
Changsha Metro | Changsha | 5 | 111 | 142.5 | 2014-04-29 | [22][e] | 250.3 million (2018)Wuyi Square (2018)[22] |
Changsha Maglev Express | Changsha | 1 | 3 | 18.7 | 2016-05-06 | Changshanan | |
Changzhou Metro | Changzhou | 1 | 29 | 34.24[23] | 2019-09-21 | ||
Chengdu Metro | Chengdu | 12[f] | 373[f] | 518.5[f] | 2010-09-27 | 1157.6 million (2018)[22] | Chunxi Road (2018)[22] |
Chongqing Rail Transit | Chongqing | 8 | 187 | 370 | 2004-11-06 | [22] | 857.9 million (2018)Lianglukou (2018)[22] |
Dalian Metro () | Dalian | 4 | 69 | 157.88[24] | 2002-11-08 | [22] | 192.3 million (2018)(2018)[22] |
Dongguan Rail Transit | Dongguan | 1 | 15 | 37.7 | 2016-05-27 | [22] | 46.1 million (2018)Hongfu Road (2018)[22] |
Foshan Metro | Foshan & Guangzhou | 1 | 25 | 39.6 | 2010-11-03 | [25] | 110 million (2017)Zumiao (2017)[25] |
Fuzhou Metro | Fuzhou | 2 | 43 | 55.5 | 2016-05-16 | [22] | 60.9 million (2018)Dongjiekou (2018)[22] |
Guangzhou Metro | Guangzhou | 13[g][h] | 257[i][h] | 491.5 [j][h] | 1997-06-28 | 3029.5 million (2018)[22][k][h] | Tiyu Xilu (2018)[22] |
Guiyang Metro | Guiyang | 2 | 55 | 75.7 | 2017-12-28 | [22] | 7.4 million (2018)(2018)[22] |
Hangzhou Metro () | Hangzhou | 7 | 165 | 306 | 2012-11-24 | [22] | 529.9 million (2018)East Railway Station (2018)[22] |
Harbin Metro | Harbin | 2 | 27 | 31.5 | 2013-09-26 | [22] | 97.4 million (2018)(2018)[22] |
Hefei Metro | Hefei | 4 | 97 | 114.78 | 2016-12-26 | [22] | 153.2 million (2018)(2018)[22] |
Hohhot Metro | Hohhot | 2 | 44 | 49.0 | 2019-12-29 | ||
Mass Transit Railway () | Hong Kong | 11 | 113 | 227.5 | 1979-10-01[l] | 1767 million (2017)[26][R Nb 1] | Admiralty |
Jinan Metro | Jinan | 3 | 40 | 84.25 | 2019-04-01 | ||
Kunming Metro | Kunming | 5 | 92 | 137.8 | 2012-06-28 | [22] | 199.6 million (2018)(2018)[22] |
Luoyang Subway | Luoyang | 1 | 19 | 25.3 | 2021-03-28 | ||
Lanzhou Metro | Lanzhou | 1 | 20 | 25.9[27] | 2019-06-23 | ||
Macau Light Rapid Transit | Macau | 1 | 11 | 9.3[28] | 2019-12-10[28] | ||
Nanchang Metro | Nanchang | 3 | 74 | 88.747 | 2015-12-26 | [22][29] | 141.8 million (2018)(2015-2020)[30] |
Nanjing Metro | Nanjing | 10 | 174 | 376.5 | 2005-09-03 | 1118.8 million (2018)[22] | Xinjiekou (2018)[22] |
Nanning Metro | Nanning | 4 | 91 | 108.0 | 2016-06-28 | [22] | 213.6 million (2018)(2018)[22] |
Ningbo Rail Transit | Ningbo | 5 | 103 | 154.31 | 2014-05-30 | [22] | 124.4 million (2018)Gulou (2018)[22] |
Qingdao Metro | Qingdao | 6 | 110 | 246.2 | 2015-12-16 | [22] | 153.9 million (2018)May 4th Square (2018)[22] |
Shanghai Metro ( ) | Shanghai & Kunshan | 18 | 473 | 743 | 1993-05-28 | 3710.2 million (2018)[22] | People's Square (2018)[22] |
Shanghai Maglev Train | Shanghai | 1 | 2 | 30.5 | 2002-12-31 | Longyang Road | |
Shaoxing Metro | Shaoxing | 1 | 10 | 20.3 | 2021-06-28[31] | ||
Shenyang Metro | Shenyang | 4 | 91 | 115.9 | 2010-09-27 | [22] | 329.9 million (2018)Qingniandajie (2018)[22] |
Shenzhen Metro () | Shenzhen | 11 | 283 | 411 | 2004-12-28 | 1646.1 million (2018)[22] | Laojie (2018)[22] |
Shijiazhuang Metro | Shijiazhuang | 3 | 51 | 61.6[32] | 2017-06-26 | [22][33] | 87.6 million (2018)(2018)[22] |
Suzhou Rail Transit | Suzhou | 4 | 134 | 164.1 | 2012-04-28 | [22] | 328.1 million (2018)Dongfangzhimen (2018)[22] |
Taiyuan Metro | Taiyuan | 1 | 23 | 23.65[34] | 2020-12-26 | ||
Tianjin Metro ( ) | Tianjin | 6 | 159 | 233.2 | 1984-12-28[m] | [22] | 408.5 million (2018)Tianjinzhan (2018)[22] |
Ürümqi Metro | Ürümqi | 1 | 21 | 27.615 | 2018-10-25 | [22] | 2.4 million (2018)|
Wenzhou Metro | Wenzhou | 1 | 18 | 53.5 | 2019-01-23 | ||
Wuhan Metro | Wuhan | 9 | 240[35] | 360[35] | 2004-07-24 | 1054.0 million (2018)[22] | Jianghan Road (2018)[22] |
Wuxi Metro | Wuxi | 3 | 69 | 89.4 | 2014-07-01 | [22] | 103.1 million (2018)Sanyang Plaza (2018)[22] |
Xi'an Metro | Xi'an & Xianyang | 8 | 171 | 245 | 2011-09-16 | [22] | 746.2 million (2018)Xiaozhai (2018)[22] |
Xiamen Metro | Xiamen | 3 | 65 | 98.4 | 2017-12-31 | [36] | 113.966 million (2020)(2020)[36] |
Xuzhou Metro | Xuzhou | 2 | 38 | 46.217[37] | 2019-09-28 | ||
Zhengzhou Metro | Zhengzhou | 7 | 151 | 213.2 | 2013-12-28 | [22] | 293.4 million (2018)Zhengzhou Railway Station (2018)[22] |
- ^ Jump up to: a b c Not including Xijiao Line, which is a light rail transit line and it is not fully grade separated.
- ^ Open for public operation on 15 January 1971 (1971-01-15).
- ^ Jump up to: a b c Not including Line 3, which is a light rail transit line and it is not fully grade separated.
- ^ Changchun Subway officially opened on 30 October 2002 (2002-10-30) as a light rail transit system.
- ^ Changsha Maglev Express is excluded.
- ^ Jump up to: a b c Not including Chengdu Tram Line 2, which is a light rail transit line and it is not fully grade separated.
- ^ 14, if Guangfo line is included. Also see Foshan Metro.
- ^ Jump up to: a b c d Not including Haizhu Tram (THZ1), which is a light rail transit line and it is not fully grade separated.
- ^ 282, if Guangfo line is included. Also see Foshan Metro.
- ^ 531.1 km, if Guangfo line (39.6 km) is included. Also see Foshan Metro.
- ^ Guangfo line is excluded. Also see Foshan Metro.
- ^ The Kowloon–Canton Railway (Current East Rail line/ERL) begin operation single track on 1 October 1910 (1910-10-01). Begin operation on 1 October 1979 (1979-10-01) as MTR Corporation and 24 December 1982 (1982-12-24) as KCRC. ERL electrification completed by 16 July 1983 (1983-07-16). ERL double-track completed by 27 February 1984 (1984-02-27). KCRC operations taken over by MTR on 2 December 2007 (2007-12-02).
- ^ The system was closed on 1 September 2001 (2001-09-01) for renovation and reopened on 12 June 2006 (2006-06-12).
- ^ Note that:
- Annual ridership is derived from the sum of each month's "Monthly Total" for each year
- The ridership includes "MTR Lines", "Airport Express" and "Cross-boundary".
- "Intercity, Light Rail & Bus" are excluded from the counts.
Urban rapid transit lines[]
- Legend
– Lines in operation.
– Lines under testing.
hideUrban rail transit lines | ||||||||
---|---|---|---|---|---|---|---|---|
Livery | Line | System | Length | Stations | Car configuration | Stock size | Commencement | |
Line 1 | Beijing | 31.0 km (19.3 mi)[38] | 23 | 6 | B1 | 1971-01-15 | ||
Line 2 | Beijing | 23.0 km (14.3 mi)[38] | 18 | 6 | B1 | 1987-12-28 | ||
Line 4 | Beijing | 28.2 km (17.5 mi)[38] | 24 | 6 | B1 | 2009-09-28 | ||
Line 5 | Beijing | 28.0 km (17.4 mi)[38] | 23 | 6 | B1 | 2007-10-07 | ||
Line 6 | Beijing | 53.4 km (33.2 mi)[39] | 32 | 8 | B2 | 2012-12-30 | ||
Line 7 | Beijing | 40.3 km (25.0 mi) | 30 | 8 | B1 | 2014-12-28 | ||
Line 8 (North section)[a] | Beijing | 28.5 km (17.7 mi) | 19 | 6 | B1 | 2008-07-19 | ||
Line 8 (South section)[a] | Beijing | 16.4 km (10.2 mi) | 12 | 6 | B1 | 2018-12-30 | ||
Line 9 | Beijing | 17.0 km (10.6 mi)[38] | 12 | 6 | B1 | 2011-12-31 | ||
Line 10 | Beijing | 57.0 km (35.4 mi)[38] | 45 | 6 | B1 | 2008-07-19 | ||
Line 13 | Beijing | 40.85 km (25.38 mi) | 17 | 6 | B1 | 2002-09-22 | ||
Line 14 (West section)[a] | Beijing | 12.4 km (7.7 mi)[40] | 7 | 6 | A | 2013-05-05 | ||
Line 14 (East section)[a] | Beijing | 31.4 km (19.5 mi)[40] | 21 | 6 | A | 2014-12-28 | ||
Line 15 | Beijing | 41.0 km (25.5 mi)[38] | 20 | 6 | B1 | 2010-12-30 | ||
Line 16 | Beijing | 30.5 km (19.0 mi)[38] | 15 | 8 | A | 2016-12-31 | ||
S1 line | Beijing | 9.1 km (5.7 mi)[41] | 7 | 6 | L | M2017-12-30 | ||
Batong line | Beijing | 23.4 km (14.5 mi)[42] | 15 | 6 | B1 | 2003-12-27 | ||
Capital Airport Express | Beijing | 28.0 km (17.4 mi)[38] | 4 | 4 | LB | 2008-07-19 | ||
Changping line | Beijing | 31.9 km (19.8 mi)[43] | 12 | 6 | B1 | 2010-12-30 | ||
Daxing Airport Express | Beijing | 41.36 km (25.70 mi) | 3 | 8 | D | 2019-09-26[44] | ||
Daxing line | Beijing | 21.8 km (13.5 mi)[38] | 12 | 6 | B1 | 2010-12-30 | ||
Fangshan line | Beijing | 32 km (20 mi)[45][46] | 16 | 6 | B1 | 2010-12-30 | ||
Yanfang line | Beijing | 14.4 km (8.9 mi)[47] | 9 | 4 | B1 | 2017-12-30 | ||
Yizhuang line | Beijing | 23.2 km (14.4 mi) | 14 | 6 | B1 | 2010-12-30 | ||
Line 1 | Changchun | 18.14 km (11.27 mi)[48][38] | 15 | 6 | B2 | 2017-06-30 | ||
Line 2 | Changchun | 20.5 km (12.7 mi)[49] | 18 | 6 | B2 | 2018-08-30 | ||
Line 4 | Changchun | 16.33 km (10.15 mi)[50] | 16 | 3/5/6 | C | 2011-06-30 | ||
Line 8 | Changchun | 13.3 km (8.3 mi)[51] | 12 | 6 | C | 2018-10-30 | ||
Line 1 | Changsha | 23.6 km (14.7 mi)[38] | 20 | 6 | B2 | 2016-06-28 | ||
Line 2 | Changsha | 26.6 km (16.5 mi)[38] | 23 | 6 | B2 | 2014-04-29 | ||
Line 3 | Changsha | 36.5 km (22.7 mi)[52] | 25 | 6 | B | 2020-06-28 | ||
Line 4 | Changsha | 33.5 km (20.8 mi) | 25 | 6 | B2 | 2019-05-26 | ||
Line 5 | Changsha | 22.5 km (14.0 mi)[52] | 18 | 6 | B | 2020-06-28 | ||
Maglev Express | Changsha ML | 18.5 km (11.5 mi)[38] | 3 | 3 | L | M2016-05-06 | ||
Line 1 | Changzhou | 34.24 km (21.28 mi)[23] | 29 | 6 | B | 2019-09-21 | ||
Line 2 | Changzhou | 19.79 km (12.30 mi)[53] | 15 | 6 | B | 2021-06-28 | ||
Line 1 | Chengdu | 40.99 km (25.47 mi)[38] | 35 | 6 | B2 | 2010-09-27 | ||
Line 2 | Chengdu | 41.8 km (26.0 mi)[38] | 32 | 6 | B2 | 2012-09-16 | ||
Line 3 | Chengdu | 48.6 km (30.2 mi) | 37 | 6 | B2 | 2016-07-31 | ||
Line 4 | Chengdu | 42.3 km (26.3 mi)[38][47] | 30 | 6 | B2 | 2015-12-26 | ||
Line 5 | Chengdu | 49.018 km (30.5 mi) | 41 | 8 | A | 2019-12-27 | ||
Line 6 | Chengdu | 68.88 km (42.8 mi)[54] | 56 | 8 | A | 2020-12-18 | ||
Line 7 | Chengdu | 38.6 km (24.0 mi)[47] | 31 | 6 | A | 2017-12-06 | ||
Line 8 | Chengdu | 29.1 km (18.1 mi)[54] | 25 | 6 | A | 2020-12-18 | ||
Line 9 | Chengdu | 22.18 km (13.8 mi)[54] | 13 | 8 | A | 2020-12-18 | ||
Line 10 | Chengdu | 37.972 km (23.6 mi)[55][56] | 16 | 6 | A | 2017-09-06 | ||
Line 17 | Chengdu | 26.15 km (16.2 mi)[54] | 9 | 8 | A | 2020-12-18 | ||
Line 18 | Chengdu | 48 km (30 mi)[54] | 8 | 8 | A | 2020-09-27[57] | ||
Line 1 | Chongqing | 38.94 km (24.20 mi) | 25 | 6 | B2 | 2011-07-28 | ||
Line 2 | Chongqing | 31.4 km (19.5 mi)[38] | 25 | 4/6 | HL | 2005-06-18 | ||
Line 3 | Chongqing | 67.1 km (41.7 mi)[38] | 45 | 6/8 | HL | 2011-09-29 | ||
Line 4 | Chongqing | 15.6 km (9.7 mi)[58] | 8 | 6 | AS | 2018-12-28 | ||
Line 5 (North section)[a] | Chongqing | 16.8 km (10.4 mi)[47] | 10 | 6 | AS | 2017-12-28 | ||
Line 5 (South section)[a] | Chongqing | 18.34 km (11.40 mi) | 12 | 6 | AS | 2021-01-20 | ||
Line 6 | Chongqing | 75.9 km (47.2 mi)[38] | 40 | 6 | B2 | 2012-09-28 | ||
Line 10 | Chongqing | 33.7 km (20.9 mi) | 19 | 6 | AS | 2017-12-28 | ||
Bishan Monorail | Chongqing | 15.4 km (9.6 mi) | 15 | 2021-04-16[59] | ||||
Loop line | Chongqing | 51 km (32 mi) | 30 | 6 | A | 2018-12-28 | ||
Line 1 | Dalian | 28.34 km (17.61 mi)[24] | 22 | 6 | B2 | 2015-10-30 | ||
Line 2 | Dalian | 25.74 km (15.99 mi)[24] | 21 | 6 | B2 | 2015-05-22 | ||
Line 3 | Dalian | 63.45 km (39.43 mi)[24] | 18 | 2/4 | B2 | 2002-11-08 | ||
Line 12 | Dalian | 40.35 km (25.07 mi)[24] | 8 | 4 | B2 | 2013-12-30 | ||
Line 2 | Dongguan | 37.8 km (23.5 mi)[38] | 15 | 6 | B2 | 2016-05-27 | ||
Line 1 | Fuzhou | 24.6 km (15.3 mi)[38][47] | 21 | 6 | B2 | 2016-05-18 | ||
Line 2 | Fuzhou | 30.6 km (19.0 mi) | 22 | 6 | B2 | 2019-04-26 | ||
Line 1 | Guangzhou | 18.5 km (11.5 mi)[38] | 16 | 6 | A | 1997-06-28 | ||
Line 2 | Guangzhou | 31.4 km (19.5 mi)[38] | 24 | 6 | A | 2002-12-29 | ||
Line 3 | Guangzhou | 68.5 km (42.6 mi)[38] | 30 | 6 | B2 | 2005-12-26 | ||
Line 4 | Guangzhou | 60.04 km (37.31 mi)[38][47] | 23 | 4 | LB | 2005-12-26 | ||
Line 5 | Guangzhou | 31.5 km (19.6 mi)[38] | 24 | 6 | LB | 2009-12-28 | ||
Line 6 | Guangzhou | 41.4 km (25.7 mi)[38] | 31 | 4 | LB | 2013-12-28 | ||
Line 7 | Guangzhou | 18.6 km (11.6 mi)[38] | 9 | 6 | B2 | 2016-12-28 | ||
Line 8 | Guangzhou | 33.9 km (21.1 mi)[60] | 26 | 6 | A | 2010-09-25 | ||
Line 9 | Guangzhou | 20.1 km (12.5 mi)[47] | 11 | 6 | B2 | 2017-12-28 | ||
Line 13 | Guangzhou | 27.0 km (16.8 mi)[47] | 11 | 8 | A | 2017-12-28 | ||
Line 14 | Guangzhou | 21.2 km (13.2 mi)[47] | 10 | 6 | B1 | 2017-12-28 | ||
Line 21 | Guangzhou | 61.5 km (38.2 mi)[61] | 21 | 6 | B1 | 2018-12-28 | ||
Zhujiang New Town APM line | Guangzhou | 03.9 km (2.4 mi)[38] | 9 | 2 | P | 2010-11-08 | ||
Guangfo line | Foshan (Guangfo) | 33.5 km (20.8 mi)[38] | 22 | 4 | B2 | 2010-09-25 | ||
Line 1 | Guiyang | 35.11 km (21.8 mi) | 25 | 6 | B2 | 2017-12-28 | ||
Line 2 | Guiyang | 40.6 km (25.2 mi)[62] | 32 | 6 | B2 | 2021-04-28 | ||
Line 1 | Hangzhou | 64.25 km (39.92 mi)[38] | 39 | 6 | B2 | 2012-11-24 | ||
Line 2 | Hangzhou | 43.3 km (26.9 mi)[63] | 33 | 6 | B2 | 2014-11-24 | ||
Line 4 | Hangzhou | 20.8 km (12.9 mi)[38] | 18 | 6 | B2 | 2015-02-02 | ||
Line 5 | Hangzhou | 56.21 km (34.93 mi)[64] | 38 | 6 | AH | 2019-06-24 | ||
Line 6 | Hangzhou | 50.2 km (31.2 mi) | 30 | 6 | AH | 2020-12-30 | ||
Line 7 | Hangzhou | 42.3 km (26.3 mi) | 20 | 6 | A | 2020-12-30 | ||
Line 8 | Hangzhou | 17.17 km (10.67 mi) | 9 | 6 | A | 2021-06-28 | ||
Line 9 | Hangzhou | 18.7 km (11.6 mi)[65] | 11 | 6 | B2 | 2021-07-10[66][H 1] | ||
Line 16 | Hangzhou | 35.12 km (21.82 mi)[67] | 12 | 6 | B2 | 2020-04-23 | ||
Line 1 | Harbin | 26.05 km (16.19 mi) | 23 | 6 | B2 | 2013-09-26 | ||
Line 2 | Harbin | 28.7 km (17.8 mi) | 19 | 6 | B2 | 2021-09-19 | ||
Line 3 | Harbin | 04.5 km (2.8 mi)[47] | 3 | 6 | B2 | 2017-01-26 | ||
Line 1 | Hefei | 24.6 km (15.3 mi)[38] | 23 | 6 | B2 | 2016-12-26 | ||
Line 2 | Hefei | 27.8 km (17.3 mi)[47] | 24 | 6 | B2 | 2017-12-26 | ||
Line 3 | Hefei | 37.2 km (23.1 mi)[68] | 33 | 6 | B | 2019-12-26[68] | ||
Hefei | 25.2 km (15.7 mi) | 20 | 6 | B | 2020-12-26 | |||
Line 1 | Hohhot | 21.719 km (13.5 mi)[69] | 20 | 6 | B | 2019-12-29 | ||
Line 2 | Hohhot | 27.32 km (17.0 mi)[70] | 24 | 6 | B | 2020-10-01[70] | ||
Airport Express | Hong Kong | 35.2 km (21.9 mi) | 5 | 8 | * | A1998-07-06 | ||
Disneyland Resort line | Hong Kong | 03.3 km (2.1 mi) | 2 | 4 | * | A2005-08-01 | ||
East Rail line | Hong Kong | 41.1 km (25.5 mi) | 14 | 12 | * | A1984-02-27[H 2] | ||
Island line | Hong Kong | 16.3 km (10.1 mi) | 16 | 8 | * | A1985-05-31 | ||
Kwun Tong line | Hong Kong | 13.8 km (8.6 mi) | 17 | 8 | * | A1979-10-01 | ||
South Island line | Hong Kong | 07.4 km (4.6 mi) | 5 | 3 | * | A2016-12-28 | ||
Tseung Kwan O line | Hong Kong | 11.9 km (7.4 mi) | 8 | 8 | * | A2002-08-04 | ||
Tsuen Wan line | Hong Kong | 16.0 km (9.9 mi) | 16 | 8 | * | A1979-12-31 | ||
Tuen Ma line | Hong Kong | 17 km (11 mi)[71] | 12 | 4/8 | * | A2004-12-21 | ||
Tung Chung line | Hong Kong | 31.1 km (19.3 mi) | 8 | 8 | * | A1998-06-21 | ||
West Rail line | Hong Kong | 35.4 km (22.0 mi) | 12 | 8 | * | A2003-12-20 | ||
Line 1 | Jinan | 26.1 km (16.2 mi) | 11 | 4 | B1 | 2019-04-01 | ||
Line 2 | Jinan | 36.39 km (22.61 mi) | 19 | 6 | B1 | 2021-03-26 | ||
Line 3 | Jinan | 21.592 km (13.417 mi) | 13 | 6 | B | 2019-12-28[72] | ||
Line 1 | Kunming | 34.9 km (21.7 mi)[38] | 22 | 6 | B1 | 2013-05-20 | ||
Line 2 | Kunming | 11.4 km (7.1 mi)[38] | 13 | 6 | B1 | 2014-04-30 | ||
Line 3 | Kunming | 22.7 km (14.1 mi)[47] | 20 | 6 | B1 | 2017-08-29 | ||
Line 4 | Kunming | 43.4 km (27.0 mi) | 29 | 6 | B1 | 2020-09-23 | ||
Line 6 | Kunming | 25.3 km (15.7 mi) | 8 | 6 | B1 | 2012-06-28 | ||
Line 1 | Lanzhou | 25.9 km (16.1 mi)[27] | 20 | 6 | A | 2019-06-23 | ||
Luoyang | 25.3 km (15.7 mi) | 19 | 6 | B | 2021-03-28 | |||
Taipa line | Macau | 09.3 km (5.8 mi)[28] | 11 | 2/4 | P | 2019-12-10[28] | ||
Line 1 | Nanchang | 28.8 km (17.9 mi)[38] | 24 | 6 | B2 | 2015-12-26 | ||
Line 2 | Nanchang | 31.51 km (19.58 mi)[73] | 28 | 6 | B2 | 2017-08-18 | ||
Line 3 | Nanchang | 28.5 km (17.7 mi)[74] | 22 | 6 | B2 | 2020-12-26 | ||
Line 1 | Nanjing | 38.9 km (24.2 mi)[38] | 27 | 6 | A | 2005-09-03 | ||
Line 2 | Nanjing | 38.0 km (23.6 mi)[38] | 26 | 6 | A | 2010-05-28 | ||
Line 3 | Nanjing | 44.9 km (27.9 mi)[38] | 29 | 6 | A | 2015-04-01 | ||
Line 4 | Nanjing | 33.7 km (20.9 mi)[47] | 18 | 6 | B2 | 2017-01-18 | ||
Line 10 | Nanjing | 21.6 km (13.4 mi)[38] | 14 | 6 | A | 2014-07-01 | ||
Line S1 | Nanjing | 36.3 km (22.6 mi)[38] | 9 | 6 | B2 | 2014-07-01 | ||
Line S3 | Nanjing | 37.2 km (23.1 mi)[47] | 19 | 6 | B2 | 2017-12-06 | ||
Line S7 | Nanjing | 30.4 km (18.9 mi) | 9 | 4 | B2 | 2018-05-26 | ||
Line S8 | Nanjing | 45.2 km (28.1 mi)[38] | 26 | 4 | B2 | 2014-08-01 | ||
Line S9 | Nanjing | 52.4 km (32.6 mi)[47] | 6 | 3 | B2 | 2017-12-30 | ||
Line 1 | Nanning | 32.1 km (19.9 mi)[38] | 25 | 6 | B2 | 2016-06-28 | ||
Line 2 | Nanning | 27.5 km (17.1 mi)[47] | 23 | 6 | B2 | 2017-12-28 | ||
Line 3 | Nanning | 27.9 km (17.3 mi)[75] | 23 | 6 | B2 | 2019-06-06 | ||
Line 4 | Nanning | 20.7 km (12.9 mi)[75] | 16 | 6 | B2 | 2020-11-23 | ||
Line 1 | Ningbo | 46.2 km (28.7 mi)[38] | 29 | 6 | B2 | 2014-05-30 | ||
Line 2 | Ningbo | 33.95 km (21.10 mi) | 25 | 6 | B2 | 2015-09-26 | ||
Line 3 | Ningbo | 16.73 km (10.40 mi)[76] | 15 | 6 | B2 | 2019-06-30 | ||
Yinfeng line | Ningbo | 21.53 km (13.38 mi)[77] | 9 | 6 | B2 | 2019-09-28 | ||
Line 4 | Ningbo | 35.95 km (22.34 mi) | 25 | 6 | B2 | 2020-12-23 | ||
Line 1 | Qingdao | 21.9 km (13.6 mi) | 15 | 6 | B1 | 2020-12-24 | ||
Line 2 | Qingdao | 24.387 km (15.153 mi) | 21 | 6 | B1 | 2017-12-10 | ||
Line 3 | Qingdao | 24.472 km (15.206 mi)[38] | 22 | 6 | B1 | 2015-12-16 | ||
Line 8 | Qingdao | 48.3 km (30.0 mi) | 11 | 6 | B1 | 2020-12-24 | ||
Line 11 | Qingdao | 57.686 km (35.844 mi) | 21 | 4 | B1 | 2018-04-23 | ||
Line 13 | Qingdao | 66.813 km (41.516 mi) | 21 | 4 | B1 | 2018-12-26 | ||
Line 1 | Shanghai | 36.9 km (22.9 mi)[38] | 28 | 8 | A | 1993-05-28 | ||
Line 2 | Shanghai | 60.3 km (37.5 mi)[38] | 30 | 4/8 | A | 2000-06-11 | ||
Line 3 | Shanghai | 40.2 km (25.0 mi)[38] | 29 | 6 | A | 2000-12-26 | ||
Line 4 | Shanghai | 33.8 km (21.0 mi)[38] | 26 | 8 | A | 2005-12-31 | ||
Line 5 | Shanghai | 32.6 km (20.3 mi)[38] | 19 | 4 | C | 2003-11-25 | ||
Line 6 | Shanghai | 32.7 km (20.3 mi)[38] | 28 | 4 | C | 2007-12-29 | ||
Line 7 | Shanghai | 43.9 km (27.3 mi)[38] | 32 | 6 | A | 2009-12-05 | ||
Line 8 | Shanghai | 37.0 km (23.0 mi)[38] | 30 | 6/7 | C | 2007-12-29 | ||
Line 9 | Shanghai | 63.9 km (39.7 mi)[38][47] | 35 | 6 | A | 2007-12-29 | ||
Line 10 | Shanghai | 46 km (29 mi)[38] | 37 | 6 | A | 2010-04-10 | ||
Line 11 | Shanghai | 81.4 km (50.6 mi)[38] | 39 | 6 | A | 2009-12-31 | ||
Line 12 | Shanghai | 39.9 km (24.8 mi)[38] | 32 | 6 | A | 2013-12-29 | ||
Line 13 | Shanghai | 38.9 km (24.2 mi)[38] | 31 | 6 | A | 2012-12-30 | ||
Line 15 | Shanghai | 42.3 km (26.3 mi) | 30 | 6 | A | 2021-01-23 | ||
Line 16 | Shanghai | 58.8 km (36.5 mi)[38] | 13 | 3/6 | A | 2013-12-29 | ||
Line 17 | Shanghai | 34.7 km (21.6 mi)[38] | 13 | 6 | A | 2017-12-30 | ||
Line 18 | Shanghai | 14.5 km (9.0 mi) | 8 | 6 | A | 2020-12-26 | ||
Pujiang line | Shanghai | 06.6 km (4.1 mi) | 6 | 4 | P | 2018-03-31 | ||
Maglev line | Shanghai ML | 30.0 km (18.6 mi)[38] | 2 | 5 | H | M2004-01-01 | ||
Line 1 | Shaoxing | 20.3 km (12.6 mi)[31] | 10 | 6 | B | 2021-06-28[31] | ||
Line 1 | Shenyang | 27.4 km (17.0 mi)[38] | 22 | 6 | B2 | 2009-09-23 | ||
Line 2 | Shenyang | 33.06 km (20.54 mi)[38] | 26 | 6 | B2 | 2012-01-08 | ||
Line 9 | Shenyang | 28.996 km (18.017 mi)[78] | 23 | 6 | B2 | 2019-05-25 | ||
Line 10 | Shenyang | 27.21 km (16.91 mi) | 21 | 6 | B2 | 2020-04-29[79] | ||
Line 1 | Shenzhen | 41.0 km (25.5 mi)[38] | 30 | 6 | A | 2004-12-28 | ||
Line 2 | Shenzhen | 35.8 km (22.2 mi)[38] | 29 | 6 | A | 2010-12-08 | ||
Line 3 | Shenzhen | 41.6 km (25.8 mi)[38] | 30 | 6 | B1 | 2010-12-28 | ||
Line 4 | Shenzhen | 20.5 km (12.7 mi)[38] | 15 | 6 | A | 2004-12-28 | ||
Line 5 | Shenzhen | 47.393 km (29.449 mi)[80] | 34 | 6 | A | 2011-06-22 | ||
Line 6 | Shenzhen | 49.4 km (30.7 mi) | 27 | 6 | A | 2020-08-18[81] | ||
Line 7 | Shenzhen | 30.2 km (18.8 mi)[38] | 28 | 6 | A | 2016-10-28 | ||
Line 8 | Shenzhen | 12.367 km (7.684 mi) | 7 | 6 | A | 2020-10-28 | ||
Line 9 | Shenzhen | 36.18 km (22.48 mi) | 32 | 6 | A | 2016-10-28 | ||
Line 10 | Shenzhen | 29.3 km (18.2 mi) | 24 | 8 | A | 2020-08-18[81] | ||
Line 11 | Shenzhen | 51.9 km (32.2 mi)[38] | 18 | 8 | A | 2016-06-28 | ||
Line 1 | Shijiazhuang | 34.3 km (21.3 mi) | 26 | 6 | A | 2017-06-26 | ||
Line 2 | Shijiazhuang | 15.5 km (9.6 mi)[82] | 15 | 6 | A | 2020-08-26[82] | ||
Line 3 | Shijiazhuang | 26.7 km (16.6 mi) | 22 | 6 | A | 2017-06-26 | ||
Line 1 | Suzhou | 25.7 km (16.0 mi)[38] | 24 | 4 | B1 | 2012-04-28 | ||
Line 2 | Suzhou | 42.2 km (26.2 mi)[38] | 35 | 5 | B1 | 2013-12-28 | ||
Line 3 | Suzhou | 45.272 km (28.1 mi)[83] | 37 | 6 | B1 | 2019-12-25[84] | ||
Line 4 | Suzhou | 52.8 km (32.8 mi)[47] | 37 | 6 | B1 | 2017-04-15 | ||
Line 5 | Suzhou | 44.1 km (27.4 mi) | 34 | 6 | B | 2021-06-29 | ||
Line 2 | Taiyuan | 23.647 km (14.694 mi) | 23 | 6 | A | 2020-12-26 | ||
Line 1 | Tianjin | 42.227 km (26.2 mi) | 27 | 6 | B1 | 1984-12-28 | ||
Line 2 | Tianjin | 27.1 km (16.8 mi)[38] | 19 | 6 | B1 | 2012-07-01 | ||
Line 3 | Tianjin | 33.6 km (20.9 mi)[38] | 26 | 6 | B1 | 2012-10-01 | ||
Line 5 | Tianjin | 34.8 km (21.6 mi)[85][86] | 27 | 6 | B2 | 2018-10-22 | ||
Line 6 | Tianjin | 45 km (28 mi)[38] | 39 | 6 | B2 | 2016-08-06 | ||
Line 9 | Tianjin | 52.2 km (32.4 mi)[38] | 21 | 4 | B2 | 2004-03-28 | ||
Line 1 | Ürümqi | 27.615 km (17.159 mi) | 21 | 6 | A | 2018-10-25 | ||
Line S1 | Wenzhou | 53.5 km (33.2 mi) | 18 | 4 | D | 2019-01-23 | ||
Line 1 | Wuhan | 37.0 km (23.0 mi)[38][47] | 30 | 4 | B1 | 2004-07-28 | ||
Line 2 | Wuhan | 60.3 km (37.5 mi) | 38 | 6 | B1 | 2012-12-28 | ||
Line 3 | Wuhan | 30.1 km (18.7 mi)[38] | 24 | 6 | B1 | 2015-12-28 | ||
Line 4 | Wuhan | 49.7 km (30.9 mi) | 37 | 6 | B1 | 2013-12-28 | ||
Line 6 | Wuhan | 36.1 km (22.4 mi)[38] | 27 | 6 | A | 2016-12-28 | ||
Line 7 | Wuhan | 47.0 km (29.2 mi) | 26 | 6 | A | 2018-10-01 | ||
Line 8 | Wuhan | 39 km (24 mi)[47] | 27 | 6 | A | 2017-12-26 | ||
Line 11 | Wuhan | 23.5 km (14.6 mi) | 14 | 6 | A | 2018-10-01 | ||
Yangluo line | Wuhan | 35.0 km (21.7 mi)[47] | 15 | 4 | A | 2017-12-26 | ||
Line 1 | Wuxi | 34.6 km (21.5 mi) | 27 | 6 | B1 | 2014-07-01 | ||
Line 2 | Wuxi | 26.3 km (16.3 mi)[87][38] | 21 | 6 | B1 | 2014-12-28 | ||
Line 3 | Wuxi | 28.493 km (17.70 mi)[88] | 21 | 6 | B | 2020-10-28 | ||
Line 1 | Xi'an | 31.45 km (19.54 mi)[89] | 23 | 6 | B2 | 2013-09-15 | ||
Line 2 | Xi'an | 26.715 km (16.600 mi)[90] | 21 | 6 | B2 | 2011-09-16 | ||
Line 3 | Xi'an | 38.0 km (23.6 mi)[38] | 26 | 6 | B2 | 2016-11-08 | ||
Line 4 | Xi'an | 35.2 km (21.9 mi) | 29 | 6 | B2 | 2018-12-26 | ||
Line 5 | Xi'an | 41.6 km (25.8 mi) | 31 | 6 | B2 | 2020-12-28 | ||
Xi'an | 15.6 km (9.7 mi) | 13 | 6 | B2 | 2020-12-28 | |||
Xi'an | 25.3 km (15.7 mi) | 15 | 6 | B2 | 2020-12-28 | |||
Line 14 | Xi'an | 42.96 km (26.69 mi) | 17 | 6 | B2 | 2019-09-29 | ||
Line 1 | Xiamen | 30.3 km (18.8 mi)[47] | 24 | 6 | B2 | 2017-12-31 | ||
Line 2 | Xiamen | 41.64 km (25.87 mi) | 32 | 6 | B2 | 2019-12-25[91] | ||
Xiamen | 26.5 km (16.5 mi)[92] | 21 | 6 | B | 2021-06-25[92] | |||
Line 1 | Xuzhou | 21.967 km (13.650 mi)[93] | 18 | 6 | B | 2019-09-28 | ||
Line 2 | Xuzhou | 24.25 km (15.07 mi)[94] | 21 | 6 | B | 2020-11-28 | ||
Xuzhou | 18.13 km (11.27 mi)[95] | 16 | 6 | B | 2021-06-28[95] | |||
Line 1 | Zhengzhou | 41.2 km (25.6 mi)[96] | 30 | 6 | B2 | 2013-12-28[97] | ||
Line 2 | Zhengzhou | 30.9 km (19.2 mi)[98][99] | 22 | 6 | B2 | 2016-08-19 | ||
Line 3 | Zhengzhou | 25.49 km (15.84 mi) | 21 | 6 | A | 2020-12-26 | ||
Line 4 | Zhengzhou | 29.287 km (18.2 mi) | 27 | 6 | B | 2020-12-26 | ||
Line 5 | Zhengzhou | 40.4 km (25.1 mi)[100] | 32 | 6 | A | 2019-05-20 | ||
Line 14 | Zhengzhou | 7.455 km (4.632 mi)[101] | 6 | 6 | B | 2019-09-19 | ||
Chengjiao line | Zhengzhou | 31.7 km (19.7 mi)[102] | 15 | 6 | B2 | 2017-01-12 |
Commencement dates of lines and extensions[]
- Legend
– Lines / extensions in operation.
– Lines / extensions under testing.
hidelines and extensions by commencement date | |||||
---|---|---|---|---|---|
Line | Section | Commencement | Length | ||
Line 1 (Beijing Subway) | Pingguo Yuan | Gucheng | 1973-04-23 | 03.7 km (2.30 mi) | |
Gucheng | Yuquan Lu | 1971-11-07 | 05.4 km (3.36 mi) | ||
Yuquan Lu | Gongzhufen | 1971-08-05 | 04.9 km (3.04 mi) | ||
Gongzhufen | Nanlishi Lu | 1969-10-01 | 03.7 km (2.30 mi) | ||
Nanlishi Lu | Fuxing Men | 1987-12-28 | 00.4 km (0.25 mi) | ||
Fuxing Men | Xidan | 1992-09-12 | 01.6 km (0.99 mi) | ||
Xidan | Tian'anmen Xi (W) | 2000-06-28 | 01.3 km (0.81 mi) | ||
Tian'anmen Xi (W) | Sihui Dong (E) | 1999-09-28 | 10.1 km (6.28 mi) | ||
Line 2 (Beijing Subway) | Changchun Jie | Beijing railway station | 1987-12-28[H 3] | 06.1 km (3.79 mi) | |
Beijing railway station | Jianguo Men | 1987-12-28 | 01.0 km (0.62 mi) | ||
Jianguo Men | Fuxing Men | 1984-09-20 | 15.2 km (9.44 mi) | ||
Fuxing Men | Changchun Jie | 1987-12-28 | 01.2 km (0.75 mi) | ||
Line 4 (Beijing Subway) | Anheqiao Bei (N) | Gongyi Xiqiao | 2009-09-28 | 28.2 km (17.52 mi) | |
Line 5 (Beijing Subway) | Tiantongyuan Bei (N) | Songjiazhuang | 2007-10-07 | 27.6 km (17.15 mi) | |
Line 6 (Beijing Subway) | Jin'an Qiao | Haidian Wuluju | 2018-12-30 | 10.556 km (6.56 mi)[103] | |
Haidian Wuluju | Caofang | 2012-12-30 | 29.882 km (18.57 mi) | ||
Caofang | Lucheng | 2014-12-28 | 12.751 km (7.92 mi) | ||
Line 7 (Beijing Subway) | Beijing West railway station | Jiaohua Chang | 2014-12-28 | 23.7 km (14.73 mi)[104] | |
Jiaohua Chang | Huazhuang | 2019-12-28[105] | 16.6 km (10.31 mi)[106] | ||
Huazhuang | Universal Resort | 2021-08-26[107] | 1.769 km (1.10 mi)[108] | ||
Line 8 (Beijing Subway) | Zhuxinzhuang | Huilongguan Dongdajie | 2013-12-28 | 06.359 km (3.95 mi) | |
Huilongguan Dongdajie | Forest Park South Gate | 2011-12-31 | 10.700 km (6.65 mi) | ||
Forest Park South Gate | Beitucheng | 2008-07-19 | 03.583 km (2.23 mi) | ||
Beitucheng | Gulou Dajie | 2012-12-30 | 03.375 km (2.10 mi) | ||
Gulou Dajie | Nanluogu Xiang | 2013-12-28 | 02.090 km (1.30 mi) | ||
Nanluogu Xiang | National Art Museum | 2018-12-30 | 01.88 km (1.17 mi)[103] | ||
National Art Museum | Zhushi Kou | 2021-12 | 4.3 km (2.67 mi)[109] | ||
Zhushi Kou | Yinghai | 2018-12-30 | 16.4 km (10.19 mi) | ||
Line 9 (Beijing Subway) | National Library | Beijing West railway station | 2012-12-30 | 10.282 km (6.39 mi) | |
Beijing West railway station | Guogongzhuang | 2011-12-31 | 05.349 km (3.32 mi) | ||
Line 10 (Beijing Subway) | Xiju | Bagou | 2012-12-30 | 13.843 km (8.60 mi) | |
Bagou | Jinsong | 2008-07-19 | 24.680 km (15.34 mi) | ||
Jinsong | Shoujingmao | 2012-12-30 | 15.932 km (9.90 mi) | ||
Shoujingmao | Xiju | 2013-05-05 | 03.420 km (2.13 mi) | ||
Line 11 (Beijing Subway) | 2021-12 | 4.2 km (2.61 mi)[110] | |||
Line 13 (Beijing Subway) | Xizhi Men | Huoying | 2002-09-28 | 20.5 km (12.74 mi) | |
Huoying | Dongzhi Men | 2003-01-28 | 20.0 km (12.43 mi) | ||
Line 14 (Beijing Subway) | Zhangguozhuang | Xiju | 2013-05-05 | 12.4 km (7.71 mi)[40] | |
Xiju | Beijing South railway station | 2021-12 | 4 km (2.5 mi)[110] | ||
Beijing South railway station | Jintai Lu | 2015-12-26 | 16.6 km (10.31 mi)[40] | ||
Jintai Lu | Shan'gezhuang | 2014-12-28 | 14.8 km (9.20 mi)[40] | ||
Line 15 (Beijing Subway) | Qinghua Donglu Xikou | Wangjing Xi (W) | 2014-12-28 | 09.944 km (6.18 mi) | |
Wangjing Xi (W) | Houshayu | 2010-12-30 | 17.725 km (11.01 mi) | ||
Houshayu | Fengbo | 2011-12-31 | 11.060 km (6.87 mi) | ||
Line 16 (Beijing Subway) | Bei'anhe | Xi Yuan | 2016-12-31 | 19.6 km (12.18 mi) | |
Xi Yuan | Ganjia Kou | 2020-12-31[111] | 10.9 km (6.77 mi)[111] | ||
Line 17 (Beijing Subway) | Shilihe | 2021-12 | 16.5 km (10.25 mi)[110] | ||
Line 19 (Beijing Subway) | Mudan Yuan | Xin Gong | 2021-12 | 22.4 km (13.92 mi)[112] | |
Line S1 (Beijing Subway) | Shichang | Jin'an Qiao | 2017-12-30 | 9.1 km (5.65 mi) | |
Jin'an Qiao | Pingguo Yuan | 2021-12 | 1.2 km (0.75 mi)[109] | ||
Batong line | Sihui | Tu Qiao | 2003-12-27 | 18.9 km (11.74 mi) | |
Tu Qiao | Huazhuang | 2019-12-28[105] | 2.238 km (1.39 mi)[113] | ||
Huazhuang | Universal Resort | 2021-08-26[107] | 1.863 km (1.16 mi)[113] | ||
Capital Airport Express | Dongzhi Men | Terminal 3/Terminal 2 | 2008-07-19 | 28.1 km (17.46 mi) | |
Dongzhi Men | Beixinqiao | 2021-12 | 1.8 km (1.12 mi)[109] | ||
Changping line | Changping Xishankou | Nanshao | 2015-12-26 | 21.3 km (13.24 mi)[114] | |
Nanshao | Xi'erqi | 2010-12-30 | 10.6 km (6.59 mi)[115] | ||
Xi'erqi | Qinghe railway station | 2021-12 | 1.6 km (0.99 mi)[116] | ||
Daxing Airport Express | Caoqiao | Daxing Airport | 2019-09-26[44] | 41.36 km (25.70 mi) | |
Daxing line | Gongyi Xiqiao | Tiangong Yuan | 2010-12-30 | 21.7 km (13.48 mi) | |
Fangshan line | Dongguantou Nan(S) | Guogongzhuang | 2020-12-31[111] | 5 km (3.11 mi) | |
Guogongzhuang | Dabaotai | 2011-12-31 | 24.79 km (15.4 mi)[45] | ||
Dabaotai | Suzhuang | 2010-12-30 | |||
Suzhuang | Yancun Dong (E) | 2017-12-30 | 02.2 km (1.4 mi)[46] | ||
Yanfang line | Yancun Dong (E) | Yanshan | 2017-12-30 | 13.37 km (8.31 mi) | |
Yizhuang line | Songjiazhuang | Ciqu | 2010-12-30 | 21.4 km (13.30 mi) | |
Ciqu | Yizhuang Railway Station | 2018-12-30 | 1.334 km (0.83 mi) | ||
Line 1 (Changchun Subway) | 2017-06-30 | 18.14 km (11.27 mi)[48] | |||
Line 2 (Changchun Subway) | 2018-08-30 | 20.5 km (12.74 mi)[49] | |||
Line 4 (Changchun Subway) | Changchun Railway Station (North) | 2012-05-07 | 03.3 km (2.05 mi) | ||
2011-06-30 | 13.0 km (8.08 mi) | ||||
Line 8 (Changchun Subway) | 2018-10-30 | 13.3 km (8.26 mi)[51] | |||
Line 1 (Changsha Metro) | Kaifu District Government | Shangshuangtang | 2016-06-28 | 23.55 km (14.63 mi) | |
Line 2 (Changsha Metro) | West Meixi Lake | Wangchengpo | 2015-12-28 | 04.279 km (2.66 mi) | |
Wangchengpo | Guangda | 2014-04-29 | 22.3 km (13.86 mi) | ||
Line 3 (Changsha Metro) | Shantang | Guangsheng | 2020-06-28 | 36.5 km (22.68 mi)[52] | |
Line 4 (Changsha Metro) | Guanziling | Dujiaping | 2019-05-26 | 33.5 km (20.82 mi) | |
Line 5 (Changsha Metro) | Maozhutang | Shuiduhe | 2020-06-28 | 22.5 km (13.98 mi)[52] | |
Changsha Maglev Express | Changshanan | 2016-05-06 | 18.55 km (11.53 mi) | ||
Line 1 (Changzhou Metro) | Nanxiashu | 2019-09-21 | 34.24 km (21.28 mi)[23] | ||
Line 2 (Changzhou Metro) | 2021-06-28[53] | 19.79 km (12.30 mi)[53] | |||
Line 1 (Chengdu Metro) | Weijianian | Shengxian Lake | 2018-03-18 | 1.46 km (0.91 mi) | |
Shengxian Lake | Century City | 2010-09-27 | 18.5 km (11.50 mi) | ||
Century City | Guangdu | 2015-07-25 | 05.4 km (3.36 mi) | ||
Guangdu | Wugensong | 2018-03-18 | 1.21 km (0.75 mi) | ||
Sihe | Science City | 2018-03-18 | 14.33 km (8.90 mi) | ||
Line 2 (Chengdu Metro) | Xipu | Chadianzi Bus Terminal | 2013-06-08 | 08.8 km (5.47 mi) | |
Chadianzi Bus Terminal | Chengdu Institute of Public Administration | 2012-09-16 | 22.4 km (13.92 mi) | ||
Chengdu Institute of Public Administration | Longquanyi | 2014-10-26 | 11.1 km (6.90 mi) | ||
Line 3 (Chengdu Metro) | Chengdu Medical College | Chengdu Junqu General Hospital | 2018-12-26 | 17.2 km (10.69 mi) | |
Chengdu Junqu General Hospital | Taipingyuan | 2016-07-31 | 20.33 km (12.63 mi) | ||
Taipingyuan | Shuangliu West Station | 2018-12-26 | 12.3 km (7.64 mi) | ||
Line 4 (Chengdu Metro) | Wansheng | Intangible Cultural Heritage Park | 2017-06-02 | 10.8 km (6.71 mi) | |
Intangible Cultural Heritage Park | Wannianchang | 2015-12-26 | 22.4 km (13.92 mi) | ||
Wannianchang | Xihe | 2017-06-02 | 10.3 km (6.40 mi) | ||
Line 5 (Chengdu Metro) | Huagui Road | Huilong | 2019-12-27 | 49.018 km (30.46 mi) | |
Line 6 (Chengdu Metro) | Wangcong Temple | Lanjiagou | 2020-12-18[117] | 69 km (43 mi)[118] | |
Line 7 (Chengdu Metro) | North Railway Station | North Railway Station | 2017-12-06 | 38.61 km (23.99 mi) | |
Line 8 (Chengdu Metro) | Lianhua | Shilidian | 2020-12-18[117] | 29 km (18 mi) | |
Line 9 (Chengdu Metro) | 2020-12-18[117] | 22 km (14 mi) | |||
Line 10 (Chengdu Metro) | Taipingyuan | Terminal 2 of Shuangliu International Airport | 2017-09-06 | 10.937 km (6.8 mi)[55] | |
Terminal 2 of Shuangliu International Airport | Xinping | 2019-12-27 | 27.035 km (16.8 mi)[56] | ||
Line 17 (Chengdu Metro) | 2020-12-18[117] | 26 km (16 mi) | |||
Line 18 (Chengdu Metro) | South Railway Station | Sancha | 2020-09-27[57] | 48 km (30 mi) | |
Sancha | 2020-12-18[117] | 20 km (12 mi) | |||
Line 1 (Chongqing Rail Transit) | Chaotianmen | Xiaoshizi | 2020-12-31 | 0.8 km (0.50 mi) | |
Xiaoshizi | Jiaochangkou | 2011-09-27 | 01.4 km (0.87 mi) | ||
Jiaochangkou | Shapingba | 2011-07-28 | 14.2 km (8.82 mi) | ||
Shapingba | Daxuecheng | 2012-12-21 | 19.7 km (12.24 mi) | ||
Daxuecheng | Jiandingpo | 2014-12-30 | 01.9 km (1.18 mi) | ||
Jiandingpo | Bishan | 2019-12-30[119] | 5.6 km (3.48 mi)[120] | ||
Line 2 (Chongqing Rail Transit) | Jiaochangkou | Daping | 2004-12-11 | 07.66 km (4.76 mi) | |
Daping | Zoo | 2004-11-06 | 04.95 km (3.08 mi) | ||
Zoo | Xinshancun | 2006-07-01 | 05.54 km (3.44 mi) | ||
Xinshancun | Yudong | 2014-12-31 | 13.15 km (8.17 mi) | ||
Line 3 (Chongqing Rail Transit) | Yudong | Chongqing Jiaotong University | 2012-12-28 | 16.197 km (10.06 mi) | |
Chongqing Jiaotong University | Lianglukou | 2011-12-30 | 08.66 km (5.38 mi) | ||
Lianglukou | Yuanyang | 2011-09-29 | 17.323 km (10.76 mi) | ||
Yuanyang | Changfulu | 2011-10-08 | 04.9 km (3.04 mi) | ||
Changfulu | Terminal 2 of Jiangbei Airport | 2011-12-30 | 06.9 km (4.29 mi) | ||
Bijin | 2016-12-28 | 11.0 km (6.84 mi) | |||
Line 4 (Chongqing Rail Transit) | North Square of Chongqing North Railway Station | 2018-12-28 | 13.1 km | ||
Min'an Ave. | North Square of Chongqing North Railway Station | 2019-01-11 | 2.3 km | ||
Line 5 (Chongqing Rail Transit) | The EXPO Garden Center | Dalongshan | 2017-12-28 | 13.59 km (8.44 mi) | |
Dalongshan | 2018-12-24 | 2.51 km (1.56 mi) | |||
Shiqiaopu | 2021-01-20 | 18.34 km (11.40 mi)[121] | |||
Line 6 (Chongqing Rail Transit) | Wulidian | 2014-12-31 | 19.2 km (11.93 mi) | ||
Wulidian | Kangzhuang | 2012-09-28 | 13.91 km (8.64 mi) | ||
Kangzhuang | Lijia | 2012-12-26 | 03.9 km (2.42 mi) | ||
Lijia | 2013-05-15 | 12.1 km (7.52 mi) | |||
Lijia | 2013-12-31 | 23.4 km (14.54 mi) | |||
2020-12-31 | 13.987 km (8.69 mi) | ||||
Line 10 (Chongqing Rail Transit) | Liyuchi | 2017-12-28 | 33.7 km (20.94 mi) | ||
Bishan Monorail | Bishan station (Chongqing Rail Transit) | Bishan railway station (High-speed rail) | 2021-04-16[59] | 15.4 km (9.57 mi) | |
Loop line (Chongqing Rail Transit) | Chongqing Library | 2018-12-28 | 33.7 km (20.94 mi)[58] | ||
2019-12-30[119] | 9.5 km (5.90 mi) | ||||
Chongqing Library | 2021-01-20 | 7.6 km (4.72 mi)[121] | |||
Line 1 (Dalian Metro) | 2015-10-30 | 16.50 km (10.25 mi) | |||
2016-01-29 | 01.21 km (0.75 mi) | ||||
2017-06-07 | 05.63 km (3.50 mi) | ||||
Line 2 (Dalian Metro) | 2018-06-28 | 3.12 km (1.94 mi) | |||
2015-05-22 | 20.7 km (12.86 mi) | ||||
2017-06-07 | 03.78 km (2.35 mi) | ||||
Line 3 (Dalian Metro) | Dalian Railway Station | Golden Pebble Beach | 2003-05-01 | 49.15 km (30.54 mi) | |
Dalian Development Area | Jiuli | 2008-12-28 | 14.3 km (8.89 mi) | ||
Line 12 (Dalian Metro) | 2017-06-07 | 01.27 km (0.79 mi) | |||
2013-12-30 | 37.52 km (23.31 mi) | ||||
Line 2 (Dongguan Rail Transit) | Humen Railway Station | Dongguan Railway Station | 2016-05-27 | 37.7 km (23.43 mi) | |
Line 1 (Fuzhou Metro) | Xiangfeng | Sanchajie | 2017-01-06 | 15.13 km (9.40 mi) | |
Sanchajie | Fuzhou South Railway Station | 2016-05-18 | 09.76 km (6.06 mi) | ||
Fuzhou South Railway Station | 2020-12-27 | ||||
Line 2 (Fuzhou Metro) | Suyang | Yangli | 2019-04-26 | 30.62 km (19.03 mi) | |
Line 1 (Guangzhou Metro) | Xilang | Huangsha | 1997-06-28 | 05.4 km (3.36 mi) | |
Huangsha | Guangzhou East Railway Station | 1999-06-28 | 13.1 km (8.14 mi) | ||
Line 2 (Guangzhou Metro) | Guangzhou South Railway Station | Jiangnanxi | 2010-09-25 | 12.7 km (7.89 mi) | |
Jiangnanxi | Sanyuanli | 2002-12-29 | 07.4 km (4.60 mi) | ||
Sanyuanli | Jiahewanggang | 2010-09-25 | 10.3 km (6.40 mi) | ||
Line 3 (Guangzhou Metro) | Panyu Square | Kecun | 2006-12-30 | 19.6 km (12.18 mi) | |
Kecun | Guangzhou East Railway Station | 2005-12-26 | 07.8 km (4.85 mi) | ||
Guangzhou East Railway Station | Airport South (Terminal 1) | 2010-10-30 | 29.3 km (18.21 mi) | ||
Airport South (Terminal 1) | Airport North (Terminal 2) | 2018-04-26 | 1.23 km (0.76 mi) | ||
Tiyu Xilu | Tianhe Coach Terminal | 2006-12-30 | 07.5 km (4.66 mi) | ||
Line 4 (Guangzhou Metro) | Nansha Passenger Port | Jinzhou | 2017-12-28 | 13.6 km (8.45 mi) | |
Jinzhou | Huangge | 2007-06-28 | 05.1 km (3.17 mi) | ||
Huangge | Xinzao | 2006-12-30 | 22.3 km (13.86 mi) | ||
Xinzao | Wanshengwei | 2005-12-26 | 16.2 km (10.07 mi) | ||
Wanshengwei | Chebeinan | 2009-12-28 | 03.8 km (2.36 mi) | ||
Chebeinan | Huangcun | 2010-09-25 | 02.0 km (1.24 mi) | ||
Line 5 (Guangzhou Metro) | Jiaokou | Wenchong | 2009-12-28 | 31.9 km (19.82 mi) | |
Line 6 (Guangzhou Metro) | Xunfenggang | Changban | 2013-12-28 | 24.5 km (15.22 mi) | |
Changban | Xiangxue | 2016-12-28 | 17.2 km (10.69 mi) | ||
Line 7 (Guangzhou Metro) | Guangzhou South Railway Station | Higher Education Mega Center South | 2016-12-28 | 18.6 km (11.56 mi) | |
Line 8 (Guangzhou Metro) | Jiaoxin | Cultural Park | 2020-11-26[122] | 16.3 km (10.13 mi)[122] | |
Cultural Park | Fenghuang Xincun | 2019-12-28 | 01.8 km (1.12 mi) | ||
Fenghuang Xincun | Changgang | 2010-11-03 | 04.4 km (2.73 mi) | ||
Changgang | Xiaogang | 2010-09-25 | 00.6 km (0.37 mi) | ||
Xiaogang | Pazhou | 2010-09-25[H 4] | 09.0 km (5.59 mi) | ||
Pazhou | Wanshengwei | 2010-09-25[H 5] | 01.8 km (1.12 mi) | ||
Line 9 (Guangzhou Metro) | Fei'eling | Gaozeng | 2017-12-28 | 20.1 km (12.49 mi) | |
Line 13 (Guangzhou Metro) | Yuzhu | Xinsha | 2017-12-28 | 28.3 km (17.58 mi) | |
Line 14 (Guangzhou Metro) | Jiahewanggang | Dongfeng | 2018-12-28 | 54.3 km (33.74 mi) | |
Xinhe | Zhenlong | 2017-12-28 | 21.4 km (13.30 mi) | ||
Line 18 (Guangzhou Metro) | 2021-09 | 58.3 km (36.2 mi)[123] | |||
Line 21 (Guangzhou Metro) | Zhenlongxi | Zengcheng Square | 2018-12-28 | 26.2 km (16.28 mi)[124] | |
Yuancun | Zhenlongxi | 2019-12-20[125] | 35.3 km (21.93 mi)[124] | ||
Line 22 (Guangzhou Metro) | Panyu Square | 2021-09 | 18.2 km (11.3 mi)[123] | ||
Zhujiang New Town APM line | Linhexi | Canton Tower | 2010-11-08 | 04.0 km (2.49 mi) | |
Guangfo line | Xincheng Dong | Kuiqi Lu | 2016-12-28 | 06.7 km (4.16 mi) | |
Kuiqi Lu | Xilang | 2010-09-25 | 20.4 km (12.68 mi) | ||
Xilang | Yangang | 2015-12-28 | 07.3 km (4.54 mi) | ||
Yangang | Lijiao | 2018-12-28 | 05.5 km (3.42 mi) | ||
Line 1 (Guiyang Metro) | 2019-12-28 | ? km | |||
Guiyangbei Railway Station | 2017-12-28 | 12.9 km (8.02 mi)[126] | |||
Guiyangbei Railway Station | 2018-12-01 | ? km | |||
Line 2 (Guiyang Metro) | 2021-04-28 | 40.6 km (25.23 mi)[62] | |||
Line 1 (Hangzhou Metro) | Xianghu | Wenze Road | 2012-11-24 | 34.77 km (21.61 mi) | |
Wenze Road | Xiasha Jiangbin | 2015-11-24 | 05.7 km (3.54 mi) | ||
Xiasha Jiangbin | Xiaoshan International Airport | 2020-12-30 | 11.2 km (6.96 mi)[127] | ||
Line 2 (Hangzhou Metro) | Chaoyang | Qianjiang Road | 2014-11-24 | 18.3 km (11.37 mi) | |
Qianjiang Road | Gucui Road | 2017-07-03 | 11.3 km (7.02 mi) | ||
Gucui Road | Liangzhu | 2017-12-27 | 13.3 km (8.26 mi) | ||
Line 4 (Hangzhou Metro) | Pengbu | Jinjiang | 2015-02-02 | 09.6 km (5.97 mi) | |
Jinjiang | Puyan | 2018-01-09 | 11.2 km (6.96 mi) | ||
Line 5 (Hangzhou Metro) | Jinxing | Liangmu Road | 2020-04-23 | 6.52 km (4.05 mi) | |
Liangmu Road | Shanxian | 2019-06-24 | 17.76 km (11.04 mi)[128] | ||
Shanxian | Guniangqiao | 2020-04-23 | 30.86 km (19.18 mi) | ||
Line 6 (Hangzhou Metro) | Qianjiang Century City | Shuangpu | 2020-12-30 | 27 km (17 mi)[127] | |
Xiangshan Campus China Academy of Art | West Guihua Road | 2020-12-30 | 23.5 km (14.6 mi)[127] | ||
Line 7 (Hangzhou Metro) | Olympic Sports Center | Jiangdong'er Road | 2020-12-30[127] | 39.3 km (24.42 mi)[127] | |
Olympic Sports Center | Citizen Center | 2021-09-17[129] | 3 km (1.86 mi)[129] | ||
Line 8 (Hangzhou Metro) | South Wenhai Road | Xinwan Road | 2021-06-28 | 17.17 km (10.67 mi) | |
Line 9 (Hangzhou Metro) | Coach Center | Linping | 2021-07-10[66][H 1] | 12.5 km (7.8 mi)[65] | |
Linping | 2021-09-17[129] | 6.2 km (3.9 mi)[130] | |||
Line 16 (Hangzhou Metro) | Jiuzhou Street | Lvting Road | 2020-04-23 | 35.12 km (21.82 mi)[67] | |
Line 1 (Harbin Metro) | Harbin East Railway Station | 2013-09-26 | 17.47 km (10.86 mi) | ||
2019-04-10 | 8.58 km (5.33 mi) | ||||
Line 2 (Harbin Metro) | 2021-09-19[131] | 28.7 km (17.83 mi) | |||
Line 3 (Harbin Metro) | Harbin West Railway Station | 2017-01-26 | 03.67 km (2.28 mi) | ||
Line 1 (Hefei Metro) | Hefei Railway Station | 2016-12-26 | 24.6 km (15.29 mi) | ||
Line 2 (Hefei Metro) | 2017-12-26 | 27.8 km (17.27 mi) | |||
Line 3 (Hefei Metro) | 2019-12-26[68] | 37.2 km (23.12 mi)[68] | |||
2020-12-26 | 25.2 km (15.66 mi)[132] | ||||
Line 1 (Hohhot Metro) | Yili Health Valley | Bayan (Airport) | 2019-12-29 | 21.719 km (13.5 mi)[69] | |
Line 2 (Hohhot Metro) | Talidonglu | A'ershanlu | 2020-10-01 | 27.32 km (17.0 mi)[70] | |
Airport Express (MTR) | Hong Kong | Airport | 1998-07-06 | 34.27 km (21.29 mi) | |
Airport | AsiaWorld–Expo | 2005-12-20 | 01.03 km (0.64 mi) | ||
Disneyland Resort line | Sunny Bay | Disneyland Resort | 2005-08-01 | 03.8 km (2.36 mi) | |
East Rail line | Hung Hom | Mong Kok East | 1984-02-27[H 6] | 02.36 km (1.47 mi) | |
Mong Kok East | Fanling | 1984-02-27[H 7] | 25.73 km (15.99 mi) | ||
Fanling | Sheung Shui | 1984-02-27[H 8] | 01.49 km (0.93 mi) | ||
Sheung Shui | Lo Wu | 1984-02-27[H 9] | 03.48 km (2.16 mi) | ||
Sheung Shui | Lok Ma Chau | 2007-08-15 | 07.35 km (4.57 mi) | ||
Island line | Kennedy Town | Sheung Wan | 2014-12-28 | 02.78 km (1.73 mi) | |
Sheung Wan | Admiralty | 1986-05-23 | 01.54 km (0.96 mi) | ||
Admiralty | Chai Wan | 1985-05-31 | 10.75 km (6.68 mi) | ||
Kwun Tong line | Whampoa | Yau Ma Tei | 2016-10-23 | 02.70 km (1.68 mi) | |
Yau Ma Tei | Mong Kok | 1979-12-31 | 00.73 km (0.45 mi) | ||
Mong Kok | Shek Kip Mei | 1982-05-10 | 01.40 km (0.87 mi) | ||
Shek Kip Mei | Kwun Tong | 1979-10-01 | 08.41 km (5.23 mi) | ||
Kwun Tong | Lam Tin | 1989-10-01 | 00.89 km (0.55 mi) | ||
Lam Tin | Yau Tong | 2002-08-04 | 01.13 km (0.70 mi) | ||
Yau Tong | Tiu Keng Leng | 2002-08-18 | 02.15 km (1.34 mi) | ||
South Island line | Admiralty | South Horizons | 2016-12-28 | 07.4 km (4.60 mi) | |
Tseung Kwan O line | North Point | Yau Tong | 2002-08-04 | 04.35 km (2.70 mi) | |
Yau Tong | Po Lam | 2002-08-18 | 05.26 km (3.27 mi) | ||
Tseung Kwan O | LOHAS Park | 2009-07-26 | 03.06 km (1.90 mi) | ||
Tsuen Wan line | Central | Tsim Sha Tsui | 1980-02-12 | 03.27 km (2.03 mi) | |
Tsim Sha Tsui | Jordan | 1979-12-31 | 00.86 km (0.53 mi) | ||
Jordan | Tsuen Wan | 1982-05-10 | 11.71 km (7.28 mi) | ||
Tuen Ma line | Wu Kai Sha | Tai Wai | 2004-10-24 | 11.4 km (7.08 mi) | |
Tai Wai | Kai Tak | 2020-02-14[133] | 5.6 km (3.5 mi) | ||
Tung Chung line | Tung Chung | Hong Kong | 1998-06-21 | 31.1 km (19.32 mi) | |
West Rail line | Hung Hom | East Tsim Sha Tsui | 2004-10-24 | 01.24 km (0.77 mi) | |
East Tsim Sha Tsui | Nam Cheong | 2009-08-16 | 04.42 km (2.75 mi) | ||
Nam Cheong | Tuen Mun | 2003-12-20 | 29.48 km (18.32 mi) | ||
Line 1 (Jinan Metro) | 2019-04-01 | 26.1 km (16.22 mi) | |||
Line 2 (Jinan Metro) | 2021-03-26 | 36.39 km (22.61 mi) | |||
Line 3 (Jinan Metro) | 2019-12-28[72] | 21.592 km (13.42 mi) | |||
Line 1 (Kunming Metro) | 2014-04-30 | 06.9 km (4.29 mi) | |||
2013-05-20 | 22.1 km (13.73 mi) | ||||
Kunming South Railway Station | 2016-12-26 | 04.7 km (2.92 mi) | |||
Line 2 (Kunming Metro) | 2014-04-30 | 11.4 km (7.08 mi) | |||
Line 3 (Kunming Metro) | 2017-08-29 | 23.36 km (14.52 mi) | |||
Line 4 (Kunming Metro) | Kunming South Railway Station | 2020-09-23 | 43.4 km (27.0 mi) | ||
Line 6 (Kunming Metro) | 2012-06-28 | 18.018 km (11.196 mi)[134] | |||
2020-09-23 | 7.3 km (4.5 mi) | ||||
Line 1 (Lanzhou Metro) | Chenguanying | 2019-06-23 | 25.9 km (16.09 mi)[27] | ||
2021-03-28 | 25.3 km (15.72 mi) | ||||
Taipa line | Oceano | 2019-12-10[28] | 09.3 km (5.78 mi)[28] | ||
Line 1 (Nanchang Metro) | 2015-12-26 | 28.737 km (17.86 mi) | |||
Line 2 (Nanchang Metro) | 2019-06-30 | 11.88 km (7.38 mi)[73] | |||
2017-08-18 | 19.63 km (12.20 mi)[73] | ||||
Line 3 (Nanchang Metro) | 2020-12-26 | 28.5 km (17.71 mi)[135] | |||
Line 1 (Nanjing Metro) | Maigaoqiao | Andemen | 2005-09-03 | 21.72 km (13.50 mi) | |
Andemen | CPU | 2010-05-28 | 25.08 km (15.58 mi) | ||
Line 2 (Nanjing Metro) | Youfangqiao | Jingtianlu | 2010-05-28 | 37.95 km (23.58 mi) | |
Line 3 (Nanjing Metro) | Linchang | Mozhoudonglu | 2015-04-01 | 44.9 km (27.90 mi) | |
Line 4 (Nanjing Metro) | Longjiang | Xianlinhu | 2017-01-18 | 33.5 km (20.82 mi) | |
Line 10 (Nanjing Metro) | Andemen | Xiaohang | 2005-08-27 | 02.1 km (1.30 mi) | |
Xiaohang | Olympic Stadium | 2014-07-01 | 04.6 km (2.86 mi) | ||
Olympic Stadium | Yushanlu | 2014-07-01 | 14.9 km (9.26 mi) | ||
Line S1 (Nanjing Metro) | Nanjing South Railway Station | Lukou International Airport | 2014-07-01 | 35.8 km (22.25 mi) | |
Lukou International Airport | Konggangxinchengjiangning | 2018-05-26 | 1.5 km (0.93 mi) | ||
Line S3 (Nanjing Metro) | Nanjing South Railway Station | Gaojiachong | 2017-12-06 | 37.6 km (23.36 mi) | |
Line S7 (Nanjing Metro) | Konggangxinchengjiangning | Wuxiangshan | 2018-05-26 | 30.4 km (18.89 mi) | |
Line S8 (Nanjing Metro) | Taishanxincun | Jinniuhu | 2014-08-01 | 45.2 km (28.09 mi) | |
Line S9 (Nanjing Metro) | Xiangyulunan | Gaochun | 2017-12-30 | 52.4 km (32.56 mi) | |
Line 1 (Nanning Metro) | 2016-12-28 | 20.9 km (12.99 mi) | |||
Nanning East Railway Station | 2016-06-28 | 11.2 km (6.96 mi) | |||
Line 2 (Nanning Metro) | 2017-12-28 | 21.2 km (13.17 mi) | |||
2020-11-23 | 6.3 km (3.91 mi) | ||||
Line 3 (Nanning Metro) | 2019-06-06 | 27.9 km (17.34 mi)[75] | |||
Line 4 (Nanning Metro) | 2020-11-23 | 20.7 km (12.86 mi)[75] | |||
Line 1 (Ningbo Rail Transit) | Gaoqiao West | Donghuan South Road | 2014-05-30 | 20.8 km (12.92 mi) | |
Donghuan South Road | Xiapu | 2016-03-19 | 25.3 km (15.72 mi) | ||
Line 2 (Ningbo Rail Transit) | Lishe International Airport | Qingshuipu | 2015-09-26 | 28.4 km (17.65 mi) | |
Qingshuipu | 2020-05-30[136] | 5.6 km (3.48 mi)[136] | |||
Line 3 (Ningbo Rail Transit) | Datong Bridge | 2019-06-30 | 16.73 km (10.40 mi)[76] | ||
Yinfeng line | 2019-09-28 | 5.61 km (3.49 mi)[137] | |||
2020-09-27[77] | 15.92 km (9.89 mi) | ||||
Line 4 (Ningbo Rail Transit) | 2020-12-23 | 36.5 km (22.68 mi) | |||
Line 1 (Qingdao Metro) | Qingdao North Railway Station | 2020-12-24 | 21.9 km (13.6 mi)[138] | ||
Line 2 (Qingdao Metro) | Taishan Road | Zhiquan Road | 2019-12-16 | 4.2 km (2.61 mi)[139] | |
Zhiquan Road | Licun Park | 2017-12-10 | 20.422 km (12.69 mi) | ||
Line 3 (Qingdao Metro) | Qingdao North Railway Station | Shuangshan | 2015-12-16 | 12.0 km (7.46 mi) | |
Shuangshan | Qingdao Railway Station | 2016-12-18 | 12.8 km (7.95 mi) | ||
Line 8 (Qingdao Metro) | Jiaozhou North Railway Station | Qingdao North Railway Station | 2020-12-24 | 48.3 km (30.0 mi)[138] | |
Line 11 (Qingdao Metro) | Miaoling Road | 2017-04-23 | 54.4 km (33.80 mi) | ||
Line 13 (Qingdao Metro) | 2018-12-26 | 66.813 km | |||
Line 1 (Shanghai Metro) | Xinzhuang | Shanghai South Railway Station | 1996-12-28 | 05.3 km (3.29 mi) | |
Shanghai South Railway Station | Xujiahui | 1993-05-28 | 04.4 km (2.73 mi) | ||
Xujiahui | Shanghai Railway Station | 1995-04-10 | 16.1 km (10.00 mi) | ||
Shanghai Railway Station | Gongfu Xincun | 2004-12-28 | 12.4 km (7.71 mi) | ||
Gongfu Xincun | Fujin Road | 2007-12-29 | 04.3 km (2.67 mi) | ||
Line 2 (Shanghai Metro) | East Xujing | Songhong Road | 2010-03-16 | 08.6 km (5.34 mi) | |
Songhong Road | Zhongshan Park | 2006-12-30 | 06.8 km (4.23 mi) | ||
Zhongshan Park | Longyang Road | 2000-06-11 | 16.4 km (10.19 mi) | ||
Longyang Road | Zhangjiang Hi-Tech Park | 2000-12-26 | 02.8 km (1.74 mi) | ||
Zhangjiang Hi-Tech Park | Guanglan Road | 2010-02-24 | 03.4 km (2.11 mi) | ||
Guanglan Road | Pudong International Airport | 2010-04-08 | 26.8 km (16.65 mi) | ||
Line 3 (Shanghai Metro) | Shanghai South Railway Station | Jiangwan Town | 2000-12-26 | 24.6 km (15.29 mi) | |
Jiangwan Town | North Jiangyang Road | 2006-12-18 | 15.7 km (9.76 mi) | ||
Line 4 (Shanghai Metro) | Damuqiao Road | Lancun Road | 2005-12-31 | 25.0 km (15.53 mi) | |
Lancun Road | Damuqiao Road | 2007-12-29 | 08.7 km (5.41 mi) | ||
Line 5 (Shanghai Metro) | Xinzhuang | Minhang Development Zone | 2003-11-25 | 17.2 km (10.69 mi) | |
Dongchuan Road | Fengxian Xincheng | 2018-12-30 | 19.5 km (12.12 mi) | ||
Line 6 (Shanghai Metro) | Gangcheng Road | South Lingyan Road | 2007-12-29 | 31.1 km (19.32 mi) | |
South Lingyan Road | Oriental Sports Center | 2011-04-12 | 01.2 km (0.75 mi) | ||
Line 7 (Shanghai Metro) | Meilan Lake | Shanghai University | 2010-12-28 | 09.8 km (6.09 mi) | |
Shanghai University | Huamu Road | 2009-12-05 | 34.4 km (21.38 mi) | ||
Line 8 (Shanghai Metro) | Shiguang Road | Yaohua Road | 2007-12-29 | 23.3 km (14.48 mi) | |
Yaohua Road | Shendu Highway | 2009-07-05 | 14.1 km (8.76 mi) | ||
Line 9 (Shanghai Metro) | Songjiang South Railway Station | Songjiang Xincheng | 2012-12-30 | 06.474 km (4.02 mi) | |
Songjiang Xincheng | Guilin Road | 2007-12-29 | 29.013 km (18.03 mi) | ||
Guilin Road | Yishan Road | 2008-12-28 | 01.687 km (1.05 mi) | ||
Yishan Road | Century Avenue | 2009-12-31 | 11.491 km (7.14 mi) | ||
Century Avenue | Middle Yanggao Road | 2010-04-07 | 02.435 km (1.51 mi) | ||
Middle Yanggao Road | Caolu | 2017-12-30 | 14.099 km (8.76 mi) | ||
Line 10 (Shanghai Metro) | Hangzhong Road | Xinjiangwancheng | 2010-04-10 | 29.6 km (18.39 mi) | |
Hongqiao Railway Station | Longxi Road | 2010-11-30 | 05.8 km (3.60 mi) | ||
Xinjiangwancheng | Jilong Road | 2020-12-26 | 09.8 km (6.09 mi)[140] | ||
Line 11 (Shanghai Metro) | Disney Resort | Kangxin Highway | 2016-04-26 | 01.8 km (1.12 mi) | |
Kangxin Highway | Luoshan Road | 2015-12-19 | 10.4 km (6.46 mi) | ||
Luoshan Road | Jiangsu Road | 2013-08-31 | 19.2 km (11.93 mi) | ||
Jiangsu Road | North Jiading | 2009-12-31 | 33.0 km (20.51 mi) | ||
Jiading Xincheng | Anting | 2010-03-29 | 12.8 km (7.95 mi) | ||
Anting | Huaqiao | 2013-10-16 | 07.0 km (4.35 mi) | ||
Line 12 (Shanghai Metro) | Qixin Road | Qufu Road | 2015-12-19 | 21.8 km (13.55 mi) | |
Qufu Road | Tiantong Road | 2014-05-10 | 01.1 km (0.68 mi) | ||
Tiantong Road | Jinhai Road | 2013-12-29 | 17.5 km (10.87 mi) | ||
Line 13 (Shanghai Metro) | Jinyun Road | Jinshajiang Road | 2012-12-30 | 09.9 km (6.15 mi) | |
Jinshajiang Road | Changshou Road | 2014-12-28 | 02.9 km (1.80 mi) | ||
Changshou Road | Madang Road | 2015-12-19 | 05.4 km (3.36 mi) | ||
Madang Road | Shibo Avenue | 2010-04-20 | 04.0 km (2.49 mi) | ||
Shibo Avenue | Zhangjiang Road | 2018-12-30 | 16.1 km (10.00 mi) | ||
Line 15 (Shanghai Metro) | Gucun Park | Zizhu Hi-tech Zone | 2021-01-23 | 42.3 km (26.28 mi) | |
Line 16 (Shanghai Metro) | Longyang Road | Luoshan Road | 2014-12-28 | 06.112 km (3.80 mi) | |
Luoshan Road | Dishui Lake | 2013-12-29 | 52.850 km (32.84 mi) | ||
Line 17 (Shanghai Metro) | Hongqiao Railway Station | Oriental Land | 2017-12-30 | 35.3 km (21.93 mi) | |
Line 18 (Shanghai Metro) | Hangtou | Yuqiao | 2020-12-26 | 14.5 km (9.01 mi)[140] | |
Pujiang line | Shendu Highway | Huizhen Road | 2018-03-31 | 06.6 km (4.10 mi) | |
Maglev line | Longyang Road | Pudong International Airport | 2004-01-01 | 30.5 km (18.95 mi) | |
Line 1 (Shaoxing Metro) | Guniangqiao | 2021-06-28[31] | 20.3 km (12.6 mi)[31] | ||
Line 1 (Shenyang Metro) | Shisanhaojie | Limingguangchang | 2010-09-27 | 27.8 km (17.27 mi) | |
Line 2 (Shenyang Metro) | Putianlu | Hangkonghangtiandaxue | 2018-04-08 | 05.7 km (3.54 mi) | |
Hangkonghangtiandaxue | Santaizi | 2013-12-30 | 05.6 km (3.48 mi) | ||
Santaizi | Quanyunlu | 2012-01-09 | 21.76 km (13.52 mi) | ||
Line 9 (Shenyang Metro) | Nujianggongyuan | Jianzhudaxue | 2019-05-25 | 28.996 km (18.02 mi)[78] | |
Line 10 (Shenyang Metro) | Dingxianghu | Zhangshabu | 2020-04-29[79] | 27.21 km (16.91 mi) | |
Line 1 (Shenzhen Metro) | Luohu | Window of the World | 2004-12-28 | 17.387 km (10.80 mi) | |
Window of the World | Shenzhen University | 2009-09-28 | 03.400 km (2.11 mi) | ||
Shenzhen University | Airport East | 2011-06-15 | 20.222 km (12.57 mi) | ||
Line 2 (Shenzhen Metro) | Chiwan | Window of the World | 2010-12-28 | 15.514 km (9.64 mi) | |
Window of the World | Xinxiu | 2011-06-28 | 20.266 km (12.59 mi) | ||
Xinxiu | Liantang | 2020-10-28 | 3.82 km (2.37 mi) | ||
Line 3 (Shenzhen Metro) | Yitian | Caopu | 2011-06-28 | 16.522 km (10.27 mi) | |
Caopu | Shuanglong | 2010-12-28 | 25.138 km (15.62 mi) | ||
Yitian | Futian Bonded Area | 2020-10-28 | 1.5 km (0.93 mi) | ||
Line 4 (Shenzhen Metro) | Futian Checkpoint | Fumin | 2007-06-28 | 01.100 km (0.68 mi) | |
Fumin | Children's Palace | 2004-12-28 | 03.379 km (2.10 mi) | ||
Children's Palace | Qinghu | 2011-06-16 | 15.481 km (9.62 mi) | ||
Qinghu | Niuhu | 2020-10-28 | 10.791 km (6.71 mi) | ||
Line 5 (Shenzhen Metro) | Chiwan | Qianhaiwan | 2019-09-28 | 7.65 km (4.75 mi) | |
Qianhaiwan | Huangbeiling | 2011-06-22 | 40.00 km (24.85 mi) | ||
Line 6 (Shenzhen Metro) | Science Museum | Songgang | 2020-08-18[81] | 49.4 km (30.7 mi) | |
Line 7 (Shenzhen Metro) | Xili Lake | Tai'an | 2016-10-28 | 30.173 km (18.75 mi)[141] | |
Line 8 (Shenzhen Metro) | Liantang | Yantian Road | 2020-10-28 | 12.367 km (7.7 mi) | |
Line 9 (Shenzhen Metro) | Qianwan | Hongshuwan South | 2019-12-08 | 10.79 km (6.70 mi) | |
Hongshuwan South | Wenjin | 2016-10-28 | 25.39 km (15.78 mi)[141] | ||
Line 10 (Shenzhen Metro) | Shuangyong Street | Futian Checkpoint | 2020-08-18[81] | 29.3 km (18.2 mi) | |
Line 11 (Shenzhen Metro) | Bitou | Futian | 2016-06-28 | 51.94 km (32.27 mi) | |
Line 1 (Shijiazhuang Metro) | 2017-06-26 | 23.9 km (14.9 mi)[142] | |||
2019-06-26 | 10.4 km (6.5 mi)[143] | ||||
Line 2 (Shijiazhuang Metro) | 2020-08-26[82] | 15.5 km (9.6 mi)[82] | |||
Line 3 (Shijiazhuang Metro) | 2020-01-20[144] | 05.4 km (3.4 mi)[144] | |||
Shijiazhuangzhan | 2017-06-26 | 06.4 km (4.0 mi)[142] | |||
Shijiazhuangzhan | 2021-04-06[145] | 14.9 km (9.3 mi)[145] | |||
Line 1 (Suzhou Rail Transit) | Mudu | Zhongnan Jie | 2012-04-28 | 25.739 km (15.99 mi) | |
Line 2 (Suzhou Rail Transit) | Qihe | Suzhou North Railway Station | 2016-09-24 | 02.2 km (1.37 mi) | |
Suzhou North Railway Station | Baodaiqiao South | 2013-12-28 | 26.557 km (16.50 mi) | ||
Baodaiqiao South | 2016-09-24 | 11.643 km (7.23 mi) | |||
Line 3 (Suzhou Rail Transit) | Suzhou Xinqu Railway Station | 2019-12-25 | 45.272 km (28.1 mi)[83] | ||
Line 4 (Suzhou Rail Transit) | Longdaobang | Tongli | 2017-04-15 | 41.5 km (25.79 mi) | |
Hongzhuang | Muli | 2017-04-15 | 11.3 km (7.02 mi) | ||
Line 5 (Suzhou Rail Transit) | 2021-06-29 | 44.1 km (27.4 mi) | |||
Line 2 (Taiyuan Metro) | 2020-12-26[146] | 23.65 km (14.70 mi)[34] | |||
Line 1 (Tianjin Metro) | [147] | Lilou | 2019-12-28 | ? km | |
Lilou | Shuanglin | 2018-12-03 | ? km | ||
Shuanglin | Xiaobailou | 2006-06-12 | 10.6 km (6.59 mi) | ||
Xiaobailou | Xi'nanjiao | 1980-08-10 | 05.2 km (3.23 mi) | ||
Xi'nanjiao | Xizhan | 1984-12-28 | 02.2 km (1.37 mi) | ||
Xizhan | Liuyuan | 2006-06-12 | 08.2 km (5.10 mi) | ||
Line 2 (Tianjin Metro) | Caozhuang | Dongnanjiao | 2012-07-01 | 09.1 km (5.65 mi) | |
Dongnanjiao | Tianjinzhan | 2013-08-28 | 01.95 km (1.21 mi) | ||
Tianjinzhan | Konggangjingjiqu | 2012-07-01 | 11.6 km (7.21 mi) | ||
Konggangjingjiqu | Binhaiguojijichang | 2014-08-28 | 04.5 km (2.80 mi) | ||
Line 3 (Tianjin Metro) | Nanzhan | Gaoxinqu | 2013-12-28 | 01.1 km (0.68 mi) | |
Gaoxinqu | Xiaodian | 2012-10-01 | 29.655 km (18.43 mi) | ||
Line 5 (Tianjin Metro) | 2019-01-31 | ? km | |||
2018-10-22 | ? km | ||||
Line 6 (Tianjin Metro) | Changhonggongyuan | 2016-12-31 | 14.5 km (9.01 mi) | ||
Changhonggongyuan | 2016-08-06 | 09.5 km (5.90 mi) | |||
2018-04-26 | 13.0 km (8.08 mi) | ||||
Line 9 (Tianjin Metro) | Tianjinzhan | Shiyijinglu | 2012-10-15 | 01.2 km (0.75 mi) | |
Shiyijinglu | Zhongshanmen | 2011-05-01 | 06.151 km (3.82 mi) | ||
Zhongshanmen | Donghailu | 2004-03-28 | 45.409 km (28.22 mi) | ||
Line 1 (Ürümqi Metro) | 2018-10-25 | 16.5 km (10.25 mi)[148] | |||
2019-06-28 | 11.1 km (6.90 mi)[148] | ||||
Line S1 (Wenzhou Metro) | 2019-01-23 | 34.38 km (21.36 mi)[149] | |||
2019-09-28 | 19.127 km (11.9 mi)[150] | ||||
Line 1 (Wuhan Metro) | Hankou North | Dijiao | 2014-05-28 | 05.555 km (3.45 mi) | |
Dijiao | Huangpu Road | 2010-07-29 | 07.040 km (4.37 mi) | ||
Huangpu Road | Zongguan | 2004-07-28 | 09.769 km (6.07 mi) | ||
Zongguan | Dongwu Boulevard | 2010-07-29 | 11.454 km (7.12 mi) | ||
Dongwu Boulevard | Jinghe | 2017-12-26 | 03.970 km (2.47 mi) | ||
Line 2 (Wuhan Metro) | Tianhe International Airport | Jinyintan | 2016-12-28 | 19.957 km (12.40 mi) | |
Jinyintan | Optics Valley Square | 2012-12-28 | 27.152 km (16.87 mi) | ||
Optics Valley Square | Fozuling | 2019-02-19 | 13.350 km (8.30 mi) | ||
Line 3 (Wuhan Metro) | Hongtu Boulevard | Zhuanyang Boulevard | 2015-12-28 | 29.660 km (18.43 mi) | |
Line 4 (Wuhan Metro) | Wuhan Railway Station | Wuchang Railway Station | 2013-12-28 | 17.974 km (11.17 mi) | |
Wuchang Railway Station | Huangjinkou | 2014-12-28 | 15.429 km (9.59 mi) | ||
Huangjinkou | Bailin[151] | 2019-09-25 | 16.068 km (9.98 mi)[152] | ||
Line 6 (Wuhan Metro) | Jinyinhu Park | Dongfeng Motor Corporation | 2016-12-28 | 36.1 km (22.43 mi) | |
Line 7 (Wuhan Metro) | Garden Expo North | Yezhihu | 2018-10-01 | 30.413 km (18.90 mi) | |
Yezhihu | Qinglongshan Ditiexiaozhen | 2018-12-28 | 16.97 km (10.54 mi) | ||
Line 8 (Wuhan Metro) | Jintan Road | Liyuan | 2017-12-26 | 16.7 km (10.38 mi) | |
Liyuan | Yezhihu | 2021-01-02 | 17.6 km (10.94 mi) | ||
Yezhihu | Military Athletes' Village | 2019-11-06[35] | 4.84 km (3.01 mi)[35] | ||
Line 11 (Wuhan Metro) | Wuhandong Railway Station | Zuoling | 2018-10-01 | 18.744 km (11.65 mi) | |
Zuoling | Gediannan Railway Station | 2021-01-02 | 3.7 km (2.30 mi) | ||
Yangluo line | Houhu Boulevard | Jintai | 2017-12-27 | 34.5 km (21.44 mi) | |
Line 1 (Wuhu Rail Transit) | 2021-09 | 30.4 km (18.9 mi) | |||
Line 1 (Wuxi Metro) | Yanqiao | Changguangxi | 2014-07-01 | 29.42 km (18.28 mi) | |
Changguangxi | 2019-09-28 | 5.187 km (3.22 mi)[153] | |||
Line 2 (Wuxi Metro) | Meiyuan Kaiyuan Temple | Wuxi East Railway Station | 2014-12-28 | 26.3 km (16.34 mi)[87] | |
Line 3 (Wuxi Metro) | Sumiao | 2020-10-28 | 28.493 km (17.70 mi)[88] | ||
Line 1 (Xi'an Metro) | Houweizhai | 2019-09-26 | 6.093 km (3.79 mi)[89] | ||
Houweizhai | Fangzhicheng | 2013-09-15 | 25.36 km (15.76 mi)[89] | ||
Line 2 (Xi'an Metro) | Beikezhan | Huizhan Zhongxin | 2011-09-16 | 20.5 km (12.74 mi) | |
Huizhan Zhongxin | 2014-06-16 | 06.0 km (3.73 mi) | |||
Line 3 (Xi'an Metro) | Baoshuiqu | 2016-11-08 | 39.1 km (24.30 mi) | ||
Line 4 (Xi'an Metro) | Beikezhan (Beiguangchang) | 2018-12-26 | 35.2 km (21.87 mi) | ||
Line 5 (Xi'an Metro) | 2020-12-28 | 41.6 km (25.85 mi)[154] | |||
2020-12-28 | 15.6 km (9.69 mi)[155] | ||||
Fangzhicheng | 2020-12-28 | 25.3 km (15.72 mi)[156] | |||
Line 14 (Xi'an Metro) | Beikezhan (Beiguangchang) | 2019-09-29 | 29.31 km (18.21 mi) | ||
Beikezhan (Beiguangchang) | 2021-06-29 | 13.65 km (8.48 mi) | |||
Line 1 (Xiamen Metro) | 2017-12-31 | 30.3 km (18.83 mi) | |||
Line 2 (Xiamen Metro) | 2019-12-25[91] | 41.64 km (25.87 mi) | |||
Xiamen Railway Station | 2021-06-25[92] | 26.5 km (16.5 mi)[92] | |||
Line 1 (Xuzhou Metro) | Xuzhoudong Railway Station | 2019-09-28 | 21.967 km (13.65 mi)[93] | ||
Line 2 (Xuzhou Metro) | 2020-11-28 | 24.25 km (15.07 mi) | |||
2021-06-28[95] | 18.13 km (11.27 mi)[95] | ||||
Line 1 (Zhengzhou Metro) | Henan University of Technology | Xiliuhu | 2017-01-12 | 09.65 km (6.00 mi)[157] | |
Xiliuhu | Zhengzhou Sports Center | 2013-12-28[97] | 26.2 km (16.28 mi)[158] | ||
Zhengzhou Sports Center | Wenyuanbeilu | 2017-01-12 | 05.36 km (3.33 mi)[157] | ||
Wenyuanbeilu | New Campus of Henan University | 2019-11-21 | |||
Line 2 (Zhengzhou Metro) | Jiahe | Liuzhuang | 2019-12-28[99] | 10.25 km (6.37 mi)[99] | |
Liuzhuang | Nansihuan | 2016-08-19 | 20.649 km (12.83 mi)[98] | ||
Line 3 (Zhengzhou Metro) | 2020-12-26 | 25.49 km (15.84 mi)[159] | |||
2021-06-26 | |||||
Line 4 (Zhengzhou Metro) | 2020-12-26 | 29.29 km (18.20 mi) | |||
Line 5 (Zhengzhou Metro) | (loop) | (loop) | 2019-05-20 | 40.4 km (25.10 mi)[100] | |
Line 14 (Zhengzhou Metro) | Tielu | 2019-09-19 | 7.455 km (4.63 mi) | ||
Chengjiao line | Nansihuan | Xinzheng International Airport | 2017-01-12 | 31.7 km (19.70 mi)[102] |
- ^ Jump up to: a b Line realignment, previously part of Line 1 since 24 November 2012 (2012-11-24).
- ^ Metro standardization completion, previously, a non-electrified single-track line since 1 October 1910 (1910-10-01).
- ^ Line realignment, previously part of Line 1 since 1 October 1969 (1969-10-01).
- ^ Line realignment, previously part of Line 2 since 28 June 2003 (2003-06-28).
- ^ Line realignment, previously part of Line 2 since 26 December 2005 (2005-12-26).
- ^ Metro standardization completion, previously, a non-electrified single-track since 27 February 1974 (1974-11-30).
- ^ Metro standardization completion, previously, a non-electrified single-track since 27 October 1910 (1910-10-01).
- ^ Metro standardization completion, previously, a non-electrified single-track since 16 May 1930 (1930-05-16).
- ^ Metro standardization completion, previously, a non-electrified single-track since 14 October 1949 (1949-10-14).
Currently operational[]
Anhui[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Hefei Metro 合肥地铁 |
Locale | Hefei |
1 2 3 |
1 Phase 3 |
||
Began operation | 26 December 2016 | |||||
Lines in operation | 4 | |||||
No. of stations | 97 | |||||
Network length | 114.78 km (71 mi) | |||||
Ridership | 1,230,200 (31 December 2020 record). 179.8 million (2019) | |||||
Beijing-Tianjin-Hebei[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Beijing Subway (BGD) 北京地铁 |
Locale | Beijing & Langfang |
1 2 4 5 6 7 8 9
|
1 Military section renovation |
[Note 1] [160] [161] [162] | |
Began operation | 1 October 1969 | |||||
Lines in operation | 23 | |||||
No. of stations | 394 (List) | |||||
Network length | 690.5 km (429.1 mi)[b] | |||||
Ridership | 10,824,301 (2019 daily avg.)[21] 13,738,800 (12 July 2019 record). 3,950.9 million (2019). | |||||
Shijiazhuang Metro 石家庄地铁 |
Locale | Shijiazhuang |
1 2 3 |
1 Dongshangze & Dongyang | ||
Began operation | 26 June 2017 | |||||
Lines in operation | 3 | |||||
No. of stations | 51 (List) | |||||
Network length | 61.6 km (38.3 mi)[32] | |||||
Ridership | 479,900 (31 December 2020 record). 95.7 million (2019). | |||||
Tianjin Metro 天津地铁 |
Locale | Tianjin |
1 2 3 5 6 9 |
4 Phase 1 |
[Note 2] | |
Began operation | 30 September 2003 (28 December 1984 old system) | |||||
Lines in operation | 6 | |||||
No. of stations | 159 (List) | |||||
Network length | 233.2 km (144.9 mi) | |||||
Ridership | 1,869,000 (31 December 2019 record). 523.5 million (2019). | |||||
Chongqing-Sichuan[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Chengdu Metro 成都地铁 |
Locale | Chengdu |
1 2 3 4 5 6 7 8 9 10 17 18 |
8 Phase 2 |
||
Began operation | 27 September 2010 | |||||
Lines in operation | 13 | |||||
No. of stations | 373 (List) | |||||
Network length | 558.5 km (347.0 mi) | |||||
Ridership | 5,649,500 (daily record) 1398 million (2019 annual) | |||||
Chongqing Rail Transit (CRT) Chongqing Metro 重庆轨道交通 |
Locale | Chongqing |
4 Phase 2 |
[163] [164] [165] | ||
Began operation | 6 November 2004 | |||||
Lines in operation | 8 | |||||
No. of stations | 187 | |||||
Network length | 370 km (230 mi) | |||||
Ridership | 3,872,000 (peak day) 2,846,356 (daily avg.) 1038.9 million (2019) | |||||
Fujian[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Fuzhou Metro 福州地铁 |
Locale | Fuzhou | 1 2 |
1 Phase 2 northern section |
||
Began operation | 18 May 2016 | |||||
Lines in operation | 2 | |||||
No. of stations | 43 | |||||
Network length | 55.5 km (34 mi) | |||||
Ridership | 553,600 (31 December 2020 Record) 107.4 million (2019 annual) | |||||
Xiamen Metro (AMTR) 厦门地铁 |
Locale | Xiamen |
1 2 |
Phase 2 |
||
Began operation | 31 December 2017 | |||||
Lines in operation | 3 | |||||
No. of stations | 65 | |||||
Network length | 98.4 km (61.1 mi) | |||||
Ridership | 944,200 (2 May 2021 Record) 113.966 million (2020 annual) | |||||
Gansu[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Lanzhou Metro 兰州轨道交通 |
Locale | Lanzhou | 1 | 2 | ||
Began operation | 23 June 2019 | |||||
Lines in operation | 1 | |||||
No. of stations | 20 | |||||
Network length | 25.9 km (16.1 mi)[27] | |||||
Ridership | 301,300 (1 Oktober 2020 Record) 32.4 million (2019 annual) | |||||
Guangdong-Hong Kong-Macau[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Dongguan Rail Transit Dongguan Metro 东莞轨道交通 |
Locale | Dongguan | 2 | 2 Phase 3 | ||
Began operation | 27 May 2016 | |||||
Lines in operation | 1 | |||||
No. of stations | 15 | |||||
Network length | 37.743 km (23 mi) | |||||
Ridership | 300,300 (1 Oktober 2019 record). 53.6 million (2019). | |||||
Foshan Metro (FMetro) 佛山地铁 |
Locale | Foshan & Guangzhou |
2 Phase 1 |
[Note 3] [Note 4] | ||
Began operation | 3 November 2010 | |||||
Lines in operation | 1 | |||||
No. of stations | 22 (List) | |||||
Network length | 34.4 km (21 mi) | |||||
Ridership | 677,900 (31 December 2020 record). | |||||
Guangzhou Metro 广州地铁 |
Locale | Guangzhou |
1 2 3 4 |
3 Eastern extension |
[Note 3] [166] [167] [168] | |
Began operation | 28 June 1997 | |||||
Lines in operation | 14 | |||||
No. of stations | 282(List) | |||||
Network length | 531.1 km (330.0 mi) | |||||
Ridership | 11,569,400 (31 December 2019 record). 3305.9 million (2019 annual) | |||||
Macau Light Rapid Transit (Metro Ligeiro de Macau, MLM) 澳門輕軌 |
Locale | Macau | Taipa | Taipa Barra extension Seac Pai Van |
||
Began operation | 10 December 2019[28] | |||||
Lines in operation | 1 | |||||
No. of stations | 11 | |||||
Network length | 9.3 km (6 mi)[28] | |||||
Ridership | 48,700 (25 December 2019 record). 0.6 million (2019) | |||||
Mass Transit Railway (MTR) 港鐵 including Kowloon–Canton Railway |
Locale | Hong Kong |
Kwun Tong Tuen Ma South Island Tung Chung East Rail West Rail Island Tseung Kwan O Tsuen Wan Disneyland Resort Airport Express |
East Rail Extension
|
[Note 5] | |
Began operation | 2 December 2007 (1 October 1979 old MTR) (1 October 1910 KCR) | |||||
Lines in operation | 11 | |||||
No. of stations | 93 (List) | |||||
Network length | 175 km (109 mi) | |||||
Ridership | 8,864,700 (22 January 2020 record). 3128.1 million (2019 annual) | |||||
Shenzhen Metro 深圳地铁 |
Locale | Shenzhen |
1 2 3 4 |
3 East Ext |
[169] [170] [171] | |
Began operation | 28 December 2004 | |||||
Lines in operation | 11 | |||||
No. of stations | 283 (List) | |||||
Network length | 411 km (255 mi) | |||||
Ridership | 7,708,300 (31 December 2010). 2017.6 million (2019 annual) | |||||
Guangxi[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Nanning Metro 南宁地铁 |
Locale | Nanning |
1 2 3 4 |
Phase 1 |
||
Began operation | 28 June 2016 | |||||
Lines in operation | 4 | |||||
No. of stations | 91 | |||||
Network length | 108.0 km (67 mi) | |||||
Ridership | 1,432,600 (1 January 2021 record). 273.3 million (2019). | |||||
Guizhou[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Guiyang Metro (GYURT) 贵阳地铁(贵阳轨道交通) |
Locale | Guiyang |
2 Phase 1 & 2 |
|||
Began operation | 28 December 2017 | |||||
Lines in operation | 1 | |||||
No. of stations | 25 | |||||
Network length | 35.11 km (21.8 mi) | |||||
Ridership | 183,000 (2 December 2018 record). 50.6 million (2019). | |||||
Heilongjiang[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Harbin Metro 哈尔滨地铁 |
Locale | Harbin |
1 3 |
2 Phase 1 |
||
Began operation | 26 September 2013 | |||||
Lines in operation | 2 | |||||
No. of stations | 26 | |||||
Network length | 31.5 km (20 mi) | |||||
Ridership | 392,400 (31 December 2019). 103.2 million (2019). | |||||
Henan[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Zhengzhou Metro 郑州地铁 |
Locale | Zhengzhou |
1 2 3 4 |
3 Phase 2 |
||
Began operation | 28 December 2013 | |||||
Lines in operation | 7 | |||||
No. of stations | 151 | |||||
Network length | 213.2 km (132 mi) | |||||
Ridership | 2,221,760 (31 December 2020 record). 411.2 million (2019). | |||||
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Luoyang Subway 洛阳地铁 |
Locale | Luoyang | — | |||
Began operation | 28 March 2021 | |||||
Lines in operation | 1 | |||||
No. of stations | 19 | |||||
Network length | 25.3 km (16 mi) | |||||
Ridership | ||||||
Hubei[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Wuhan Metro 武汉地铁 |
Locale | Wuhan |
1 2 3 4 |
|
[172] [173] | |
Began operation | 28 July 2004 | |||||
Lines in operation | 9 | |||||
No. of stations | 228[35] | |||||
Network length | 339 km (211 mi)[35] | |||||
Ridership | 1229 million (2019 annual)[21] 4,456,200 (4 April 2019 Peak)[174] | |||||
Hunan[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changsha Maglev Express 长沙磁浮快线 |
Locale | Changsha |
Maglev |
|||
Began operation | 6 May 2016 | |||||
Lines in operation | 1 | |||||
No. of stations | 3 | |||||
Network length | 18.7 km (12 mi) | |||||
Ridership | ||||||
Changsha Metro 长沙地铁 |
Locale | Changsha |
1 2 3 4 5 |
3 Southern extension |
||
Began operation | 29 April 2014 | |||||
Lines in operation | 5 | |||||
No. of stations | 111 | |||||
Network length | 142.5 km (88.5 mi) | |||||
Ridership | 2,656,900 (31 December 2020 record). 378.2 million (2020). | |||||
Inner Mongolia[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Hohhot Metro 呼和浩特地铁 |
Locale | Hohhot | 1 2 | |||
Began operation | 29 December 2019 | |||||
Lines in operation | 2 | |||||
No. of stations | 44 | |||||
Network length | 49.0 km (30.4 mi) | |||||
Ridership | 239,400 (31 December 2020 record). 0.2 million (2019). | |||||
Jiangxi[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Nanchang Metro 南昌地铁 |
Locale | Nanchang | 1 2 3 |
|
||
Began operation | 26 December 2015 | |||||
Lines in operation | 3 | |||||
No. of stations | 72 | |||||
Network length | 88.7 km (55 mi) | |||||
Ridership | 1,447,000 (31 December 2020 record). 174.9 million (2019). | |||||
Jilin[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changchun Rail Transit 长春轨道交通(长春地铁) |
Locale | Changchun |
1 2 3 4 8 |
2 Western extension |
||
Began operation | 30 Οctober 2002 | |||||
Lines in operation | 5 | |||||
No. of stations | 93 | |||||
Network length | 100.2 km (62 mi) | |||||
Ridership | 938,000 (20 December 2019). 213.9 million (2019 annual)[22] | |||||
Liaoning[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Dalian Metro 大连地铁 |
Locale | Dalian |
1 2 3 12 |
2 Phase 2 |
[175] | |
Began operation | 8 November 2002 | |||||
Lines in operation | 4 | |||||
No. of stations | 69 (List) | |||||
Network length | 157.88 km (98 mi)[24] | |||||
Ridership | 724,900 (7 August 2019 record). 203.9 million (2019). | |||||
Shenyang Metro 沈阳地铁 |
Locale | Shenyang |
1 2 9 10 |
2 Southern extension |
||
Began operation | 27 September 2010 | |||||
Lines in operation | 4 | |||||
No. of stations | 91 (List) | |||||
Network length | 115.9 km (72 mi) | |||||
Ridership | 1,375,300 (15 November 2019 record). 358.6 million (2019). | |||||
Shaanxi[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Xi'an Metro 西安地铁 |
Locale | Xi'an & Xianyang | 1 Phase 3 2 Phase 2 Phase 2 |
|||
Began operation | 16 September 2011 | |||||
Lines in operation | 8 | |||||
No. of stations | 188 | |||||
Network length | 259 km (161 mi) | |||||
Ridership | 4,073,041 (31 December 2020). 945.4 (2019 annual). | |||||
Shandong[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Jinan Metro 济南地铁 |
Locale | Jinan |
1 2 3 |
|||
Began operation | 1 April 2019 | |||||
Lines in operation | 3 | |||||
No. of stations | 40 | |||||
Network length | 84.3 km (52 mi) | |||||
Ridership | 66,800 (31 December 2020 record). 5.75 million (2019). | |||||
Qingdao Metro 青岛地铁 |
Locale | Qingdao |
1 2 3 8 11 13 |
1 South Section |
||
Began operation | 16 December 2015 | |||||
Lines in operation | 6 | |||||
No. of stations | 110 | |||||
Network length | 246.2 km (153.0 mi) | |||||
Ridership | 861,300 (31 December 2020 record). 187.5 million (2019). | |||||
Shanghai-Jiangsu-Zhejiang[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Changzhou Metro 常州地铁 |
Locale | Changzhou | 1 | 2 | ||
Began operation | 21 September 2019 | |||||
Lines in operation | 1 | |||||
No. of stations | 29 | |||||
Network length | 34.24 km (21 mi) | |||||
Ridership | 243,000 (31 October 2019 record). 10.3 million (2019). | |||||
Hangzhou Metro 杭州地铁 |
Locale | Hangzhou |
1 2 4 5 6 7 8 9 16 |
3 Mainline & Branch |
||
Began operation | 24 November 2012 | |||||
Lines in operation | 5 | |||||
No. of stations | 135 (list) | |||||
Network length | 206 km (128 mi) | |||||
Ridership | 3,141,400 (31 December 2020 record). 634 million (2019). | |||||
Nanjing Metro 南京地铁 |
Locale | Nanjing |
1
2
3
4
10 |
1 Northern extension |
[176] [177] [178][179] | |
Began operation | 3 September 2005 | |||||
Lines in operation | 10 | |||||
No. of stations | 159 | |||||
Network length | 378 km (235 mi) | |||||
Ridership | 4,219,000 (31 December 2020 record). 1151.9 million (2019). | |||||
Ningbo Rail Transit Ningbo Metro 宁波轨道交通 |
Locale | Ningbo |
1 2 3 Yinfeng 4 |
2 Phase 2 |
||
Began operation | 30 May 2014 | |||||
Lines in operation | 4 | |||||
No. of stations | 103 | |||||
Network length | 154.31 km (95.88 mi) | |||||
Ridership | 1,014,600 (31 December 2020 record). 167.2 million (2019). | |||||
Shanghai Maglev Train (SMT) 上海磁浮示范运营线 |
Locale | Shanghai |
Maglev |
|||
Began operation | 31 December 2002 | |||||
Lines in operation | 1 | |||||
No. of stations | 2 | |||||
Network length | 30.5 km (19 mi) | |||||
Ridership | ||||||
Shanghai Metro 上海地铁 |
Locale | Shanghai (and Kunshan) |
1 2 3 4 |
14 |
[180] [181] [182] [183] | |
Began operation | 28 May 1993 | |||||
Lines in operation | 17 | |||||
No. of stations | 428[184] (List) | |||||
Network length | 699.5 km (434.6 mi) | |||||
Ridership | 13,294,400 (8 March 2019 record). 3880.1 million (2019). | |||||
Shaoxing Metro 绍兴轨道交通 |
Locale | Shaoxing | 1 | |||
Began operation | 28 June 2021[31] | |||||
Lines in operation | 1 | |||||
No. of stations | 10 | |||||
Network length | 20.3 km (13 mi)[31] | |||||
Ridership | ||||||
Suzhou Rail Transit Suzhou Metro 苏州轨道交通 |
Locale | Suzhou |
1 2 3 4 |
5 6 7 8 S1 |
||
Began operation | 28 April 2012 | |||||
Lines in operation | 4 | |||||
No. of stations | 134 (List) | |||||
Network length | 164.1 km (102 mi) | |||||
Ridership | 1,548,000 (2 May 2019 record). 363 million (2019). | |||||
Wenzhou Metro 温州轨道交通 |
Locale | Wenzhou |
S1 |
S2 |
||
Began operation | 23 January 2019 | |||||
Lines in operation | 1 | |||||
No. of stations | 18 | |||||
Network length | 53.5 km (33 mi) | |||||
Ridership | 71,800 (1 December 2020 not free record). 7.75 million (2019). | |||||
Wuxi Metro 无锡地铁 |
Locale | Wuxi |
1 2 3 |
4 Phase 1 S1 |
||
Began operation | 1 July 2014 | |||||
Lines in operation | 3 | |||||
No. of stations | 69 | |||||
Network length | 89.4 km (56 mi) | |||||
Ridership | 526,900 (19 December 2020 record). 109.5 million (2019). | |||||
Xuzhou Metro 徐州地铁 |
Locale | Xuzhou | 1 2 |
Phase 1 | ||
Began operation | 28 September 2019 | |||||
Lines in operation | 2 | |||||
No. of stations | 338 | |||||
Network length | 46.2 km (29 mi)[37] | |||||
Ridership | 256,700 (31 December 2020 record). 7.5 million (2019). | |||||
Shanxi[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Taiyuan Metro 太原轨道交通 |
Locale | Taiyuan | 2 | 1 | ||
Began operation | 26 December 2020 | |||||
Lines in operation | 1 | |||||
No. of stations | 23 | |||||
Network length | 23.6 km (15 mi) | |||||
Ridership | 216,100 (1 January 2021 record). | |||||
Xinjiang[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Ürümqi Metro 乌鲁木齐地铁 |
Locale | Ürümqi |
|
|||
Began operation | 25 October 2018 | |||||
Lines in operation | 1 | |||||
No. of stations | 21 | |||||
Network length | 27.615 km (17 mi) | |||||
Ridership | 124,667 (13 October 2019 record). 25.57 million (2019). | |||||
Yunnan[]
System | Information | Currently operational | Currently under construction | Map | Ref. | |
---|---|---|---|---|---|---|
Kunming Metro 昆明地铁 |
Locale | Kunming |
1 Northwestern extension |
|||
Began operation | 28 June 2012 | |||||
Lines in operation | 5 | |||||
No. of stations | 92 | |||||
Network length | 137.8 km (86 mi) | |||||
Ridership | 811,800 (30 September 2020 record). 214.1 million (2019). | |||||
Under construction[]
- Metro
- Jinhua Metro
- Nantong Metro
- Taizhou Metro
- Maglev
- Monorail
- Guilin Metro
- Liuzhou Metro
Construction suspended[]
Proposed[]
- Line 11 of Shanghai Metro and under construction Line S1 of Suzhou Metro which both run into Kunshan) (excluding
- [186]
- Xining Metro
- [187]
- Yichang Metro
- Yinchuan Metro
Notes
- ^ The first section of the Beijing Subway was completed in 1969 but did not open for trial operation until 1971 and it was restricted to riders with credential letters. The subway was fully opened to the public without credential letters in 1981.
- ^ The Tianjin Metro closed down for upgrades in 2001 and reopened in 2006.
- ^ Jump up to: a b The Guangzhou Metro annual ridership data is combined with Guangfo Metro.
- ^ The Guangfo Metro is also considered as Line 1 of Foshan Metro.
- ^ The Hong Kong Mass Transit Railway (MTR) consists of the main MTR subway system, which opened in 1979, and the Kowloon-Canton Railway (KCR), which opened in 1910 and was electrified in 1983. The two systems merged in 2007. Data no counts light rail lines. The ridership figures for the MTR does not include cross-border train service riders and includes only ridership on the MTR lines, airport express and light rail and certain MTR bus lines. The MTR compiles light rail and MTR bus line riders in one category so it is not possible to separate MTR bus riders from light rail riders. See [1]
Regional, suburban, & commuter rail[]
hideRegional, suburban, & commuter rail | ||||||||
---|---|---|---|---|---|---|---|---|
Corridor | Type | System & Operator | Location (Provincial-level) |
Service terminals | Length | Stations | Opened | |
Sub-Central | S-train | BCR ( CR Beijing) | Beijing | Liangxiang — Qiaozhuang East | 63.7 km (39.6 mi) | 6 | 2017-12-31 | |
S2 | S-train | BCR ( CR Beijing) | Beijing & Hebei | Huangtudian — Yanqing / Shacheng | 108.3 km (67.3 mi) | 6 | 2008-08-06 | |
Huairou–Miyun | S-train | BCR ( CR Beijing) | Beijing | Beijing North — | 144.6 km (89.9 mi) | 7 | 2017-12-31 | |
Tongmi | S-train | BCR ( CR Beijing) | Beijing | — / | 84.2 km (52.3 mi) | 7 | 2020-06-30 | |
Jinji | S-train | CR Beijing | Tianjin | Tianjin — Jizhou North | 112.60 km (69.97 mi) | 9 | 2015-07-05 | |
Yangda | S-train | CR Beijing | Shanxi | Yangquan North — | 45.95 km (28.55 mi)[188] | 3 | 2020-09-24[188] | |
Yongyu — Shaoxing Urban | S-train | NBIR / SXSR ( CR Shanghai) | Zhejiang | Ningbo — Hangzhou South | 144 km (89 mi) | 6 | 2017-06-10 | |
S-train | Lianyungang Suburban Railway ( CR Shanghai) | Jiangsu | Lianyungang — | 35.1 km (21.8 mi)[189] | 5 | 2019-12-30[189] | ||
S-train | Haikou Suburban Railway ( CR Guangzhou) | Hainan | Haikou — Meilan | 38.054 km (23.646 mi) | 6 | 2019-07-01 | ||
Changji — Jihun | C-train | CR Shenyang | Jilin | Changchun West — | 482 km (300 mi) | 13 | 2015-09-20 | |
Changbai — | C-train | CR Shenyang | Jilin & Inner Mongolia | Changchun — | 435 km (270 mi) | 18 | 2017-08-08 | |
Jingjin | C-train | CR Beijing | Beijing & Tianjin | Beijing South — Binhai | 165 km (103 mi) | 6 | 2008-08-01 | |
Jingxiong | C-train | CR Beijing | Beijing & Hebei | Beijing West — Daxing Airport | 48.224 km (29.965 mi) | 3 | 2019-09-26[190] | |
Zhengkai | C-train | CR Zhengzhou | Henan | Zhengzhou East — Kaifeng | 57 km (35 mi) | 4 | 2014-12-28 | |
Zhengjiao | C-train | CR Zhengzhou | Henan | Zhengzhou — Jiaozuo | 77 km (48 mi) | 6 | 2015-06-26 | |
Zhengji | C-train | CR Zhengzhou | Henan | Zhengzhou East — Xinzheng Airport | 28 km (17 mi) | 2 | 2015-12-31 | |
Jinshan | C-train | CR Shanghai | Shanghai | Shanghai South — Jinshanwei | 56.4 km (35.0 mi) | 8 | 2012-09-28 | |
Wuxiao | C-train | CR Wuhan | Hubei | Hankou — | 61.8 km (38.4 mi) | 11 | 2016-12-01 | |
Wuxian | C-train | CR Wuhan | Hubei | Wuchang — | 91 km (57 mi) | 13 | 2013-12-28 | |
C-train | CR Wuhan | Hubei | Wuhan — / | 131 km (81 mi) | 14 | 2014-06-18 | ||
Chengguan | C-train | CR Chengdu | Sichuan | Chengdu — Qingchengshan / / Lidui Park | 94.2 km (58.5 mi) | 13 | 2010-05-12 | |
Chengpu | C-train | CR Chengdu | Sichuan | Chengdu West — | 99 km (62 mi) | 12 | 2018-12-28 | |
Guikai | C-train | CR Chengdu | Guizhou | Guiyang North — Kaiyang | 62 km (39 mi) | 6 | 2015-05-01 | |
Yuwan | C-train | CR Chengdu | Chongqing | Chongqing North — Wanzhou | 247 km (153 mi) | 7 | 2016-11-29 | |
Qingrong | C-train | CR Jinan | Shandong | Qingdao North — Rongcheng | 298 km (185 mi) | 14 | 2014-12-29 | |
Guangzhu | C-train | Pearl River Delta intercity railway ( CR Guangzhou) |
Guangdong | Guangzhou South — Zhuhai / Xinhui | 143 km (89 mi) | 22 | 2011-01-07 | |
Guangfozhao | C-train | Pearl River Delta intercity railway ( CR Guangzhou) |
Guangdong | Guangzhou — Zhaoqing | 79 km (49 mi) | 11 | 2016-03-30 | |
Guanhui | C-train | Pearl River Delta intercity railway ( CR Guangzhou) |
Guangdong | Dongguan West — | 103.1 km (64.1 mi)[191] | 18 | 2016-03-30 | |
Guangshen | C-train | CR Guangzhou | Guangdong | Guangzhou — Shenzhen | 147 km (91 mi) | 8 | 2007-04-18 | |
Suishen | C-train | Pearl River Delta intercity railway ( CR Guangzhou) |
Guangdong | Guangzhou East — | 97 km (60 mi) | 16 | 2019-12-15 | |
Zhuji | C-train | Pearl River Delta intercity railway ( CR Guangzhou) |
Guangdong | Zhuhai — Zhuhai Changlong | 16.86 km (10.48 mi) | 7 | 2020-08-18 | |
Xiashen | C-train | CR Guangzhou | Guangdong | Shenzhen North — Shanwei | 156 km (97 mi) | 6 | 2013-12-28 | |
Changzhutan | C-train | CR Guangzhou | Hunan | Changsha West — / Xiangtan | 97 km (60 mi) | 21 | 2016-12-26 | |
Lanzhong | C-train | CR Lanzhou | Gansu | Lanzhou West — Zhongchuan Airport | 61 km (38 mi) | 6 | 2015-09-30 |
See also[]
- Rapid transit in Taiwan
- Trams in China
- Autonomous Rail Rapid Transit in China
- List of tram and light rail transit systems
- List of town tramway systems in Asia
- List of rapid transit systems
- List of trolleybus systems
Notes[]
References[]
- ^ 中国城市轨道交通 [China Urban Mass Transit]. Archived from the original on 4 April 2012. Retrieved 18 February 2013.
- ^ Jump up to: a b "China builds more urban rail transit lines in 2020--China Economic Net". en.ce.cn. Retrieved 10 January 2021.
- ^ "China: urban subway line length 2019". Statista. Retrieved 10 January 2021.
- ^ Jump up to: a b "Chinese metro boom shows no sign of abating". International Rail Journal. 19 November 2014. Retrieved 23 November 2014.
- ^ https://www.youtube.com/watch?v=dNCaK4d0GA0
- ^ "Shanghai now the world's longest metro". Railway Gazette. 4 May 2010. Retrieved 9 April 2014.
- ^ "中国27城开通轨交:运营线路上海最长 为579.2公里". sh.eastday.com.
- ^ "China's urban subway rankings released! 41 cities entered the subway era, Shanghai, Beijing, Guangzhou and Shenzhen temporarily ranked top four – RAILINKS". Retrieved 10 January 2021.
- ^ 深圳地铁"十年怀胎"终圆梦---深圳特区报. sztqb.sznews.com. Archived from the original on 6 January 2016. Retrieved 11 August 2017.
- ^ Lu Fang (鲁放); Han Baoming (韩宝明); Li Dewei (李得伟); Zhang Qi (张琦). 城市轨道交通小编组高密度运行的合理实施[J]. 城市轨道交通研究 [Urban Rail Transport Research Institute]. 2009 (8): 4–7.
- ^ Chen Haoran (陈浩然). 用于城市轨道交通的小编组、高密度列车运行方案[J]. 中国铁路. 2001 (5): 44–46.
- ^ Chen Haoran (陈浩然). 采用小编组、高密度列车运行方案——是降低工程造价及运营费用的有效途径[J]. 中国铁路. 2002 (1): 39–45.
- ^ "Rapid Transit Trends Show Record Growth in 2016, with Huge Increases in China, Brazil – Institute for Transportation and Development Policy". Institute for Transportation and Development Policy. 17 February 2017. Retrieved 9 April 2017.
- ^ "In response to growth, Chinese cities choose metros". The Transport Politic. 17 January 2018. Retrieved 20 January 2018.
- ^ "China's Metro Boom Continues to Drive Rapid Transit Growth – Institute for Transportation and Development Policy". Institute for Transportation and Development Policy. 30 July 2018. Retrieved 20 November 2018.
- ^ 谁的地铁,谁做主? (in Chinese). Sohu Business. 23 March 2010.
- ^ "China to let more cities build metro systems – Economic Information Daily". Reuters. 16 May 2016. Retrieved 9 September 2017.
- ^ "China to build more high-speed railways in five years: white paper". shanghaidaily.com. Retrieved 31 December 2016.
- ^ "A transport system to lead the world". shanghaidaily.com. Retrieved 31 December 2016.
- ^ "Over 40 Chinese Third-Tier Cities Plan to Build Subway Systems". Yicai Global. Retrieved 9 September 2017.
- ^ Jump up to: a b c "2018年统计报告".
- ^ Jump up to: a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax ay az ba bb bc bd be bf "2018年统计报告".
- ^ Jump up to: a b c "定了!常州市轨道交通1号线本周六上午9:30开通". 18 September 2019.
- ^ Jump up to: a b c d e f "你关心的大连地铁建设情况来了". Dalian Metro. 20 October 2019.
- ^ Jump up to: a b Wei, Fuyun. 2017年广佛线年客运量首次突破一亿人次. Foshan Daily Post. Retrieved 27 April 2018.
- ^ "MTR > Patronage Updates". mtr.com.hk.
- ^ Jump up to: a b c d "6月23日兰州轨交1号线试运营". 21 June 2019. Retrieved 21 June 2019.
- ^ Jump up to: a b c d e f g h "輕軌下周二開通 年底前免費乘搭". 6 December 2019.
- ^ https://mp.weixin.qq.com/s/l-sFhcwiDvepFZBpPDXkYA
- ^ 南昌地铁运营. "感恩有您,大数据记录南昌地铁运营这五年". Weixin Official Accounts Platform. Retrieved 26 December 2020.
- ^ Jump up to: a b c d e f g "绍兴正式进入"地铁时代" 两地"一张网"运营创全国先例". 28 June 2021.
- ^ Jump up to: a b "石家庄地铁2号线一期将于8月26日开通运营". 25 August 2020.
石家庄轨道交通运营里程将增至61.6公里
- ^ http://www.camet.org.cn/index.php?m=content&c=index&a=show&catid=42&id=15550
- ^ Jump up to: a b "太原地铁2号线一期开通运营". news.sxrb.com. Retrieved 6 January 2020.
- ^ Jump up to: a b c d e f "明日9点,武汉轨道交通8号线三期工程开通试运营". Wuhan Metro Operation. 5 November 2019.
- ^ Jump up to: a b "城市轨道交通2020年度统计和分析报告".
- ^ Jump up to: a b "定了,徐州地铁1号线6月7日试运行!". 6 May 2019.
- ^ Jump up to: a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap aq ar as at au av aw ax ay az ba bb bc bd be bf bg bh bi bj bk bl bm bn bo bp bq br bs bt bu bv bw bx by bz ca cb cc 2016年统计报告. CAMET. Retrieved 2 January 2018.
- ^ "北京:四年内副中心陆续开4条地铁-新华网". Xinhua News Agency.
- ^ Jump up to: a b c d e "14号线 – 北京京港地铁有限公司". mtr.bj.cn.
- ^ "北京首条中低速磁浮交通线路S1线年底部分开通-新华网". Xinhua News Agency.
- ^ "北京地铁7号线东延和八通线南延今年底开通试运营-千龙网·中国首都网". beijing.qianlong.com.
- ^ "地铁昌平线南延全面进场施工 新建8座车站 其中5座为换乘车站". 6 November 2019.
- ^ Jump up to: a b "地铁大兴机场线明起运营,6条机场大巴线路同步开通". 25 September 2019.
- ^ Jump up to: a b "房山线北延四站明年开工".
北起丰台区郭公庄站,南至房山区苏庄站。全长24.79公里,设11座车站
- ^ Jump up to: a b "全自动、磁浮、有轨电车 北京宣布开通三条轨道交通新线". 29 December 2017.
30日还将开通房山线阎村东至苏庄的一站一区间,长度约2.2公里
- ^ Jump up to: a b c d e f g h i j k l m n o p q r s t u v 快报|2017年中国内地城轨交通线路概况. CAMET. Retrieved 2 January 2018.
- ^ Jump up to: a b "长春地铁1号线通车试运营". 30 June 2017.
- ^ Jump up to: a b "长春地铁进入换乘时代 2号线8月30日通车". 30 August 2018.
- ^ "轻轨4号线3日起试运营 全程16.33公里". 5 February 2013.
- ^ Jump up to: a b "长春轨道8号线来啦!明日正式开通试运营 共设车站12座". 29 October 2018.
- ^ Jump up to: a b c d "双线齐发车!长沙地铁3、5号线试运行". 31 December 2019.
- ^ Jump up to: a b c "常州地铁二号线开通 "地铁时代"跨入"换乘时代"". 23 June 2021.
- ^ Jump up to: a b c d e "成都地铁新开5条线 运营里程558公里". 18 December 2020.
- ^ Jump up to: a b "成都地铁乘客有福了 7号线10号线将打造主题列车". 22 November 2016.
- ^ Jump up to: a b "成都地铁5号线、10号线竣工验收!创下国内多个"首次"". 28 November 2019.
- ^ Jump up to: a b "9月27日,成都地铁18号线首开段开通运营(附时刻表)". 26 September 2020.
- ^ Jump up to: a b "重庆轨道交通环线东北半环、4号线一期开通试运营". 29 December 2018.
- ^ Jump up to: a b "无人驾驶"云巴"16日在璧山开通". 10 April 2021.
- ^ "八号线凤凰新村至文化公园段明天正式运营". 27 December 2019.
- ^ "广州地铁运营里程将突破500公里". 19 December 2019.
- ^ Jump up to: a b "贵阳地铁2号线试运行 部分市民代表参加试乘体验". 29 December 2020.
- ^ "今天17时,地铁2号线全程开通 从头坐到尾只需77分钟". 27 December 2017.
- ^ "杭州地铁5号线后通段、16号线计划4月底通车 _杭州网新闻频道". hznews.hangzhou.com.cn.
- ^ Jump up to: a b "喜讯!众合科技助力杭州地铁9号线临平段改造工程圆满完成". 15 July 2021.
为9号线的中段,由既有1号线临平支线拆分独立运营构成,长约12.5公里
- ^ Jump up to: a b "7月10日起,杭州地铁9号线来了!". 7 July 2021.
- ^ Jump up to: a b "杭州地铁16号线开通在即 余杭到临安不到38分钟". 9 April 2020.
- ^ Jump up to: a b c d "合肥轨道交通3号线12月26日8:56正式开通". 25 December 2019.
- ^ Jump up to: a b "内蒙古年底将迈入"地铁时代"". 15 July 2019.
- ^ Jump up to: a b c "呼和浩特市地铁2号线10月1日起开通初期运营". 1 October 2020.
正线全长27.32km
- ^ "【屯馬線】鐵路迷啟德站外通宵等搭頭班車".
屯馬線一期的走線由烏溪沙至啟德共12個車站...全線長度約17公里
- ^ Jump up to: a b "定了!济南地铁3号线12月28日正式通车". sd.ifeng.com.
- ^ Jump up to: a b c "重磅!南昌地铁2号线后通段开通时间确定". jx.sina.cn. 28 June 2019.
- ^ "江西南昌地铁3号线正式开通试运营". www.chinanews.com. 26 December 2020.
- ^ Jump up to: a b c d "南宁地铁3号线6月6日开通试运营!看站点、换乘、票价". 3 June 2019.
- ^ Jump up to: a b "3号线一期6月30日试运营 宁波轨道交通进入"多线时代"-浙江新闻-浙江在线". zjnews.zjol.com.cn.
- ^ Jump up to: a b "3号线鄞奉段、机场快速路南延南段、三官堂大桥9月27日开通". 26 September 2020.
- ^ Jump up to: a b "辽宁频道_凤凰网". ln.ifeng.com.
- ^ Jump up to: a b "沈阳地铁集团有限公司 -公司新闻". symtc.com.
- ^ "约起!深圳地铁5号线二期9月28日开通".
5号线运营总里程将延长至47.393公里
- ^ Jump up to: a b c d "官宣!深圳地铁6、10号线8月18日开通初期运营". Shenzhen Metro. 16 August 2020.
- ^ Jump up to: a b c d "石家庄地铁2号线一期工程8月26日载客运营". 16 August 2020.
- ^ Jump up to: a b "苏州轨交3号线"橙姑娘"开始试跑 预计12月首班试运营列车开通". 15 July 2019.
- ^ "苏州轨道交通3号线明日(12月25日)11点30分开通". 24 December 2019.
- ^ "开始试乘体验 天津地铁5号线开通在即". 18 October 2018.
- ^ "天津地铁5号线开通试运营". 22 October 2018.
- ^ Jump up to: a b "无锡地铁2号线昨通车 8分钟一班". 29 December 2014.
- ^ Jump up to: a b "坚实一步!无锡地铁3号线一期工程取得空载试运行证书". 27 May 2020.
- ^ Jump up to: a b c "西安市地铁一号线三期工程(秦都站~森林公园)环境影响报告书(征求意见稿)". 西安地铁官方网站. 8 October 2019. Retrieved 8 October 2019.
- ^ "西安市地铁二号线二期工程(常宁~韦曲南、北客站~草滩北)环境影响报告书(征求意见稿)". 西安地铁官方网站. 8 October 2019. Retrieved 8 October 2019.
- ^ Jump up to: a b "厦门地铁2号线12月25日8点半开通运营!21日市民可免费体验". 20 December 2019.
- ^ Jump up to: a b c d "6月25日,厦门地铁3号线开通运营". 18 June 2021.
- ^ Jump up to: a b "定了,徐州地铁1号线6月7日试运行!". 6 May 2019.
- ^ "交会换乘,多线共建徐州地铁网络正加速形成".
- ^ Jump up to: a b c d "定了!徐州地铁三号线28号上午开通". 24 June 2021.
- ^ "郑州市轨道交通1号线35KV及以下供电系统设施2020—2022年委外维修项目比选公告". 24 September 2019.
郑州市轨道交通1号线全长41.2km,设站30座,均为地下车站。其中,1号线一期工程线路长约26.2km,设站20座...1号线二期工程线路全长约15 km,设站10座...
- ^ Jump up to: a b "郑州地铁1号线今日正式试运营 开启中原城市新格局". 28 December 2013.
- ^ Jump up to: a b "郑州地铁2号线19日开通 1、2号线换乘攻略". 18 August 2016.
- ^ Jump up to: a b c "官宣!郑州地铁2号线二期12月28日开通试运营". 26 December 2019.
- ^ Jump up to: a b "地铁5号线预计2019年建成通车". 25 April 2018. Retrieved 6 May 2019.
- ^ "快讯 郑州地铁14号线(一期)近期开通运营". 17 September 2019.
- ^ Jump up to: a b "郑州地铁1号线二期和城郊铁路一期将开通试运营". 11 January 2017.
- ^ Jump up to: a b "两条地铁线路年内将"升级"". 18 October 2018.
- ^ "北京地铁7号线年底开通试运 双井站拟暂缓换乘". 20 November 2014.
- ^ Jump up to: a b "7号线东延八通线南延本周六开通试运营 运营时间保持不变 环球度假区站暂不开通". 25 December 2019.
- ^ "地铁7号线东延、八通线南延今日试运行 年底开通". 10 September 2019.
- ^ Jump up to: a b "定了!北京环球度假区各交通站口明天同步开通". 25 August 2021.
- ^ "7号线路网车站站间距信息".
- ^ Jump up to: a b c "北京7条计划年底通车地铁线路全部空载试运行".
- ^ Jump up to: a b c "地铁14号线剩余段、17号线南段、11号线西段进入空载试运行".
- ^ Jump up to: a b c "地铁房山线北延、16号线中段和有轨电车T1线今日开通".
- ^ "地铁19号线开始空载试运行". 16 September 2021.
- ^ Jump up to: a b "八通线路网车站站间距信息".
- ^ "北京地铁昌平线本月底开通 最高时速100公里". 25 December 2010.
- ^ "北京地铁14号线中段、昌平线二期12月28日前试运营". 20 November 2015.
- ^ "首次全景亮相!地铁昌平线南延这一站,有望年底前开通!". 15 September 2021.
- ^ Jump up to: a b c d e "12月18日五线齐发,成都轨道交通运营里程突破500公里!".
18号线三岔站(不含)至天府机场北站段五条线路将同步开通初期运营
- ^ "为什么说5条新线,是"2020最完美拼图"". Chengdu Metro.
6号线全长约68.88km,共设有56座车站
- ^ Jump up to: a b "重庆又有两段轨道开通:1号线尖璧段、环线西南半环". 30 December 2019.
- ^ "重庆轨道交通首次驶出主城 1号线璧山站要来了". 13 November 2019.
- ^ Jump up to: a b "重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". 21 August 2020. Archived from the original on 30 August 2020.
- ^ Jump up to: a b "这天,八号线长"长"了!". Guangzhou Metro. 27 December 2019.
- ^ Jump up to: a b "广州地铁18号线陇枕停车场首次迎接"活力橙"". 20 February 2021.
广州市2021年十件民生实事显示,2021年广州将力争开通试运营地铁18号线先通段(万顷沙-冼村,58.3公里)、22号线先通段(番禺广场-陈头岗,18.2公里)
- ^ Jump up to: a b "广州地铁21号线年底开通 设21座车站与7条线路换乘". 31 October 2019.
- ^ "定了!广州地铁21号线20日全线开通运营". 19 December 2019.
- ^ "贵阳地铁驶来:1号线观山湖段试运行". Guiyang Daily. Xinhua News Agency. Retrieved 20 July 2017.
- ^ Jump up to: a b c d e "明天11点,杭州地铁新线齐开,首次实现十城区地铁全覆盖".
- ^ "快不快好不好?杭州地铁5号线首通段初体验-浙江在线杭州在线网站". hangzhou.zjol.com.cn.
- ^ Jump up to: a b c "明天下午3时 杭州地铁9号线北段和7号线市民中心站正式开通". 16 September 2021.
- ^ "杭州地铁9号线北段即将开通 带你提前探营". 9 September 2021.
线路全长约6.2km
- ^ "重磅!哈尔滨地铁2号线19日开通".
- ^ "合肥地铁5号线南段12月26日开通运营".
- ^ "港鐵屯馬線一期2月14日開通". 17 January 2020.
- ^ "铁四院设计的昆明地铁首期工程全线贯通运营". 30 April 2014.
加上已于2012年6月28日开通运营的地铁6号线一期18.018公里
- ^ "南昌地铁3号线明日通车".
- ^ Jump up to: a b "官宣 定了!宁波轨道交通2号线二期首通段5月30日开通运营". Ningbo Rail Transit. 13 May 2020.
- ^ "官宣 定了!宁奉线首通段9月28日开通,与3号线一期贯通运营". Ningbo Rail Transit. 19 September 2019.
- ^ Jump up to: a b "重磅!地铁1号线北段、8号线北段12月24日通车".
- ^ "青岛地铁2号线西段轨通,年底全线通车". 30 April 2019.
- ^ Jump up to: a b "官宣!上海两条地铁新线本周六开通试运营".
- ^ Jump up to: a b "深圳地铁7、9号线试运营 轨道网络规模居国内第三". 28 October 2016.
- ^ Jump up to: a b "石家庄地铁开通 河北正式迈入"地铁时代"_央广网". cnr.cn.
- ^ "石家庄地铁1号线二期先开通这6座车站,票价确定". 河北新闻网.
- ^ Jump up to: a b "石家庄地铁3号线一期工程北段将于1月20日开通运营". 16 January 2020.
- ^ Jump up to: a b "准备就绪!石家庄地铁3号线明日开通新线14.9公里". 5 April 2021.
- ^ "太原地铁2号线拟定12月26日开通!高颜值地铁站抢先看一哈".
- ^ "评审通过!地铁1号线东延线部分站点开通在即!". Tianjin Metro Group. 29 November 2019.
年底前拟开通高庄子站、北洋村站、国展路站、东沽路站 (Stations will open in this year: Gaozhuangzi, Beiyangcun, Guozhanlu, Donggulu.)
- ^ Jump up to: a b "28日,京疆合作的乌鲁木齐轨道交通1号线全线开通试运营". 3 September 2019.
- ^ "刚刚!温州首条轨道交通S1线正式开通试运营". 23 January 2019.
- ^ "S1线东段通过项目工程质量验收,计划月底通车". 1 September 2019.
- ^ "被调侃开往德国 武汉地铁柏林站注音改为"bailin"". 4 October 2019.
- ^ "蔡甸线三大特色站亮相". 20 September 2019.
- ^ "无锡地铁1号线南延线工程顺利通过竣工验收". 9 September 2019.
- ^ "定了!西安地铁5号线、6号线一期、9号线将于12月28日上午同步开通初期运营".
- ^ "定了!西安地铁5号线、6号线一期、9号线将于12月28日上午同步开通初期运营".
- ^ "定了!西安地铁5号线、6号线一期、9号线将于12月28日上午同步开通初期运营".
- ^ Jump up to: a b "与城市发展"赛跑" 郑州地铁进入3.0时代". gmw.cn. 12 January 2017.
- ^ "中原首条地铁载客运营 古城郑州驶入地铁时代". 29 December 2013.
- ^ "郑州地铁3号线一期、4号线正式开通". 26 December 2020.
- ^ 北京公交出行再增两个百分点. Qianlong. 10 February 2012. Retrieved 29 January 2012.
- ^ "Official Ridership". Beijing Subway. Archived from the original on 22 March 2013. Retrieved 10 March 2013.
- ^ 杜燕 (2 January 2014). 北京地铁一年运客超32亿人次 同比增长近30%. 中国新闻网. Retrieved 2 January 2014.
- ^ 2010重庆市主城区交通发展年度报告解读. Cq.cqnews.net. Retrieved 26 January 2012.
- ^ "节后3条轨道运力增幅超10% 观音桥站或6月扩建_新浪重庆新闻_新浪重庆". Sina Corp.
- ^ 重庆市主城区交通发展年度报告2012. Cq.cqnews.net. Retrieved 26 January 2012.
- ^ 2011广州地铁运客16.4亿人次 行车里程达19308万车公里 [Guangzhou Metro 2011 ridership tops 1.64 billion]. Guangzhou Metro Daily (in Chinese). 18 January 2012. Retrieved 24 January 2012.
- ^ 第二届地铁春联今起征集 [Second Metro Spring Duilian Contest starts today]. Guangzhou Metro Daily (in Chinese). 10 January 2011. Archived from the original on 17 March 2012. Retrieved 23 January 2010.
- ^ 交通六件事 事事有着落. Guangzhou Daily (in Chinese). 2013. Archived from the original on 1 January 2014. Retrieved 20 January 2014.
- ^ (Chinese) "深圳市统计局2011年度12月份 深圳统计月报 Archived 17 March 2012 at the Wayback Machine 运输邮电,地铁客流量1–12月累计. Retrieved 17 March 2012.
- ^ (Chinese) "深圳地铁客流量 去年猛增近七成. Retrieved on 2013-01-10.
- ^ 340.96万!2013跨年日地铁创下客流新高. 深圳都市报. 2 January 2014. Archived from the original on 29 November 2014. Retrieved 21 January 2014.
- ^ 轻轨高峰发车间隔缩短半分钟. Cjmp.cnhan.com. 26 October 2011. Archived from the original on 30 December 2011. Retrieved 26 January 2012.
- ^ [2]
- ^ "武汉地铁清明小长假送客1615万乘次,客流量42天内三创纪录_手机搜狐网". m.sohu.com.
- ^ [议案之一]轨道交通不载客试运行三个月. 大连天健网. 8 January 2012. Retrieved 12 January 2012.
- ^ Ditiezu Archive » 2011年南京地铁客流量34370.10万人次.
- ^ 南京地铁一号线3月9日起调整运行图. jspeople. 8 March 2012. Retrieved 24 August 2012.
- ^ 2012年清明小长假 南京地铁安全送客531万人次. longhoo. 8 March 2012. Retrieved 24 August 2012.
- ^ 南京铁运营十年日均客流占全市公交出行量三分之一. Xici. 31 December 2013. Retrieved 20 January 2013.
- ^ excluding Maglev and Jinshan railway
- ^ 2015年上海市国民经济和社会发展统计公报. Shanghai Bureau of Statistics and Shanghai Survey Corps, National Bureau of Statistics of China. 1 March 2016. Retrieved 3 March 2016.
- ^ 新年前日上海地铁运送1083万人次创纪录 加班车功劳大 (in Chinese). Eastday. 2 January 2016. Retrieved 9 January 2016.
- ^ 回顾上海地铁2013 (in Chinese). Eastday. 15 January 2014. Retrieved 15 January 2014.
- ^ "上海轨道交通11号线陈翔公路站将于8月25日开通". 23 August 2020.
- ^ "BYD's SkyRail Project Called Off Amid Stricter Scrutiny of Rail Projects". 8 June 2018.
- ^ "『泉州』快速轨道交通规划:1号、2号、3号、4号、5号、6号线". 22 August 2020.
- ^ "扬州申建地铁为啥没获批准?". 3 March 2020.
- ^ Jump up to: a b "阳大铁路正式开通运营". 24 September 2020.
- ^ Jump up to: a b "连云港市域列车满图试运营 预计30日开通". 26 December 2019.
- ^ "京雄城际铁路北京西至大兴机场段26日开通运营". 25 September 2019.
- ^ "莞惠城轨今天全线开通 计划每天开动车31对". 28 December 2017. Retrieved 14 December 2019.
External links[]
- Rapid transit in China