Qingyuan Maglev

From Wikipedia, the free encyclopedia
Qingyuan Maglev
Overview
LocaleQingyuan, Guangdong, China
Operation
Operation will start2022

Qingyuan Maglev is a medium-low speed maglev rapid transit line in Qingyuan, Guangdong province, China.[1][2][3][4] It is currently under construction.

The line will operate at speeds up to 100 km/h.[5] The first phase is 8.1 km with 3 stations and a site reserved for a fourth station.[6] The first phase will open in 2021[7] and will connect the Yinzhan railway station on Guangzhou–Qingyuan intercity railway with the Qingyuan Chimelong Theme Park.[8] In long-term the line will be 38.5 km.[9]

Stations[]

Station name[10] Connections Distance
km
Location
English Chinese
Yinzhan 银盏  Guangzhou-Qingyuan  23°33′07″N 113°07′29″E / 23.5520494°N 113.1246584°E / 23.5520494; 113.1246584
Lianhu 莲湖 23°34′30″N 113°07′30″E / 23.57492°N 113.12487°E / 23.57492; 113.12487
Changgang (reserved station) 长岗
Chimelong Theme Park 长隆主题公园 23°35′23″N 113°09′28″E / 23.58979°N 113.15784°E / 23.58979; 113.15784

History[]

On October 13, 2019, general manager Xie Hailin and Yan Juping, deputy general manager and chief engineer of the company visited Qingyuan maglev general contracting project for on-site investigation and held a project site promotion meeting.[11]

References[]

  1. ^ "Hunan Government Website International-enghunan.gov.cn World's First Intelligent Maglev Track Panel Production Line Starts Mass Production". enghunan.gov.cn. China: Government of China. Retrieved 2019-10-21.
  2. ^ "Guangdong's first medium-low-speed meglev train to start operation in 2019 - Xinhua". www.xinhuanet.com. China: Xinhua News Agency. Retrieved 2019-10-21.
  3. ^ 刘明. "Guangdong's first medium-low-speed meglev train to start operation in 2019 - Chinadaily.com.cn". www.chinadaily.com.cn. China: China Daily. Retrieved 2019-10-21.
  4. ^ Beanland, Christopher (2018-11-27). "Magnetic levitation: the return of transport's great 'what if?'". The Guardian. United Kingdom. Retrieved 2019-10-21.
  5. ^ "清远市磁浮旅游专线正式开工建设,为国内首条中低速磁浮旅游专线!". 2017-12-30.
  6. ^ "国内最长的磁浮线隧道在清远实现贯通". 2019-12-04.
  7. ^ "清远磁浮预计9月铺轨 10月启动站后工程施工". 2019-09-02.
  8. ^ "清远磁浮旅游专线进行预可行性评估". 2017-04-17.
  9. ^ "中国自主研发设计,全球首条智能化磁浮轨排生产线实现量产". 2019-03-14.
  10. ^ "清远磁浮旅游专线四电系统工程建设全面启动". 清远磁浮. 2020-12-03.
  11. ^ 谢海林一行到清远磁浮总承包项目进行现场调研

External links[]

Retrieved from ""