Zhangjiang Tram

From Wikipedia, the free encyclopedia

Zhangjiang Tram
Chinese name
Simplified Chinese张江有轨电车
Traditional Chinese上海張江有軌電車
Zhangjiang Tram.jpg
Overview
StatusOperational
LocalePudong, Shanghai
TerminiZhangjiang metro station
Zhangdong Road Jinqiu Road Station
Connecting lines 2 
Stations15
Service
TypeLight rail
SystemZhangjiang Tram
Services ZJ Zhangjiang Tram: Zhangjiang metro station ↔ Zhangdong Road Jinqiu Road Station
Operator(s)Shanghai Pudong Modern Rail Transportation Co., Ltd
Depot(s)Heqing Town
Rolling stock9 3-car Translohr rubber-tired tram
Daily ridership6,000 (daily average, 2016)[1]
History
CommencedDecember 23, 2007; 14 years ago (2007-12-23)
OpenedDecember 31, 2009; 12 years ago (2009-12-31)
Technical
Line length9.8 km (6 mi)
CharacterAt-grade, unreserved tracks in the middle of the road
Track gaugeNone, central guide rail
ElectrificationOverhead lines (550 volts) DC
Operating speedmax speed 70 km/h (43 mph) 40 km/h (25 mph)
Route map
Route on the Shanghai map:
  • Zhanjiang tram network map.jpg
To scale geographic map:
  • Zhangjiang Tram Route.png

Zhangjiang Tram is one of the only two tram networks operating in Shanghai today, the other being Songjiang Tram. It utilises a system manufactured by the French Translohr company. Shanghai originally had a steel wheeled electric tramway network in its urban center. Routes expanded gradually and reached largest extent in 1925 with 328 tramcars; this tram system shut down in 1975. Tram service returned to Shanghai with the opening of a rubber tired Translohr line in the suburban Zhangjiang Hi-Tech Park in 2010. It is the second rubber-tired tram system in both China and Asia, the first being TEDA tram in Tianjin.

Zhangjiang Tram started construction on December 23, 2007.[2] Construction was originally planned to be completed in December 2008, but this was delayed a year, until December 31, 2009 when it was opened to traffic.[3] Passenger operations started on December31, 2009. Zhangjiang Tram runs for 10 km (6.2 mi) from Zhangjiang Hi-Tech Park Station of the Shanghai Metro Line 2 to Heqing Town with 15 stops. The total investment of the Zhangjiang tram project is about 800 million yuan.[4]

Zhangjiang tram was planned to be built in phases. The first phase is constructed and runs from Zhangjiang Hi-Tech Park Station on Shanghai Metro Line 2 (formerly Songtao Road Zuchongzhi Road Station) in the east, to Zhangdong Road Jinqiu Road Station in the west, which covers a distance of 9.8km, with a total of 15 stops, 1 depot. Initial plans included a next phase which is an extension to Tangzhen and a third phase to Heqing Town, reaching a scale of more than 30 kilometers by 2010. There were also possible plans to build tram projects in Lujiazui and Sanlin areas. These have not materialized.

History[]

The new system was built in Zhangjiang Town, because it is a planned area, and commuting between neighborhoods of the town has always been difficult. The Translohr tramway is constructed in Zhangjiang Town which is in the heartland area of Pudong New Area (east shore of Huangpu River). Due to Economic-Technological Development Area ordinances, sound pollution must be kept to a minimum in this area. Traditional steel-wheeled trams generate much vibration and sound during their journey. Rubber tires on the trams reduce vibration, and as a result noise, substantially. Additionally, the Zhangjiang Town roads are very hilly, and rubber tired trams can more easily climb steeper grades than traditional trams. Another advantage is that rubber-tired trams don't require tracks, as steel wheeled cars do, so there is less disturbance of underground networks like power cables, phone lines, and sewer and water mains.

Timeline:

  • 2007 – Construction of rubber tired tram started.
  • 2009 – Test runs occurred.
  • 2010 – Commercial services began.

Practical Info[]

  • Tickets: There is a single fare of 2 Yuan. It accepts the Shanghai Public Transport Card, the transfer discount policy for Shanghai public transport service is applicable.
  • Total length: 9.8km.
  • Opened: December 31, 2009.
  • Operating hours: 5:45 am to 11 pm.
  • Frequency: 15 minutes (3 minutes before end of 2015).[5]
  • Operate on a "Request stop" mode. If a passenger requests a stop, a green light is illuminated and the doors open at the next stop. If no stop is requested, the doors remain closed.
  • The existing traffic light system in the area was transformed into a tram signal priority system.
  • Alignment: on unreserved tracks and in the middle of the road. Because of the rubber tires, it is not possible to lay track in grass, as the trams can only run on concrete or paved roads.

Stations[]

The modern tram runs from Zhangjiang Hi-Tech Park Station to Zhangdong Road Jinqiu Road Station. Most stops have island platforms. Most Zhangjiang tram lines run along the centre of the roads, while some stations are situated at intersections and have side platforms, while the two terminals have a central platform. Trams are stored in an indoor facility at the eastern end of the line in Heqing Town.

Routes Station name Connections Distance
km
Location
M English Chinese
Zhangjiang metro station 张江地铁站  2  (adjacent station - Zhangjiang Hi-Tech Park Station) 0.00 0.00 Pudong
Bibo Road Gaoke Road Station 碧波路高科路站
Huatuo Road Daerwen Road Station 华佗路达尔文路站
Huatuo Road Keyuan Road Station 华佗路科苑路站
Cailun Road Jinke Road Station 蔡伦路金科路站
Cailun Road Halei Road Station 蔡伦路哈雷路站
Gebaini Road Libing Road Station 哥白尼路李冰路站
Ziwei Road Gaosi Road Station 紫薇路高斯路站
Gaosi Road Zhangjiang Road Station 高斯路张江路站
Zhangjiang Middle School Station 张江中学站
*Guanglan Road Zuchongzhi Road Station 广兰路祖冲之路站  2  (adjacent station - Guanglan Road)
Guanglan Road Dangui Road Station 广兰路丹桂路站
Dangui Road Qingtong Road Station 丹桂路青桐路站
Dangui Road Zhangdong Road Station 丹桂路张东路站
Zhangdong Road Jinqiu Road Station 张东路金秋路站 9.8

Technology[]

Rolling Stock[]

The rolling stock is Translohr. It consists of 9 multiple units of three cars each. They are low floor, fully air conditioned, and can operate at high speeds up to 70km/h. Each train is generally composed of 3 cars, 25 meters long and 2.2 meters wide. It can take more than 160 people, and it can be increased to 5 cars according to demand. After the opening of the tram, there were be 12 cars on the whole line, every 6 minutes or so.

See also[]

  • Trams in Shanghai – first generation tram network
  • Songjiang Tram - steel wheel tram in Shanghai
  • List of rubber-tyred tram systems
  • Guided bus
  • Trolleybuses in Shanghai
  • List of tram and light rail transit systems

References[]

  1. ^ Modern Tram and Public Transport Integration in Chinese Cities: A case study of Suzhou
  2. ^ "[晚报晨讯]张江有轨电车项目工程今开工_新民网". sh.xinmin.cn. Retrieved September 3, 2017.
  3. ^ "张江有轨电车31号通车 营业时间与二号线衔接_新浪上海_新浪网". sh.sina.com.cn. Retrieved September 3, 2017.
  4. ^ Lu, Yannan (August 15, 2007). "张江有轨电车线10月开建". http://www.sina.com.cn. {{cite news}}: External link in |agency= (help)
  5. ^ http://english.pudong.gov.cn/html/pden/pden_ap_news_sn/2015-07-08/Detail_74827.htm

External links[]

Retrieved from ""