Shanghai–Huzhou high-speed railway

From Wikipedia, the free encyclopedia
Shanghai–Huzhou
high-speed railway
沪苏湖铁路
Overview
StatusUnder construction
LocaleShanghai
Huzhou
TerminiShanghai Hongqiao
Huzhou
Stations7
Service
Operator(s)China Railway High-speed
Technical
Line length164 km (102 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)
Route map

Legend
km
Up arrow from
Nanxiang
Shanghai EMU depot
Fengbang yard
Hongqiao yard
Up arrow Airports connecting line from Shanghai East
(start of this line)
Shanghai HongqiaoShanghai Metro  2  10  17 
Shanghai SouthShanghai Metro  1  3  15 
(start of the Hukun railway)
Qibao
Lijiatang
XinzhuangShanghai Metro  1  5 
Chunshen
Xinqiao (connect to Songjiang Tram T1 Songjiang Tram)
existing section of Hukun railway on left
new route through Songjiang South on right
Songjiang
Songjiang SouthShanghai Metro  9 
Wujiang South
Nanxun
Huzhou East
Huzhou
km

The Shanghai–Huzhou high-speed railway is a high-speed railway in China.[1] It is expected to be completed in 2024.[2]

History[]

Construction began in June 2020.[3]

Stations[]

Station Name Chinese Metro
transfers/connections
Shanghai Hongqiao 上海虹桥 Shanghai Metro  2   10   17 
Songjiang South 松江南 Shanghai Metro  9 
汾湖
盛泽
南浔
湖州东
Huzhou 湖州

References[]

  1. ^ "沪苏湖高铁正式获批!开工进入"倒计时"". WeChat Official Accounts Platform. Retrieved 2020-07-02.
  2. ^ "沪苏湖铁路全面施工 苏州段新建两个站" [Shanghai-Suzhou-Huzhou railway fully under construction, Suzhou section will have two stations]. 名城苏州 (in Chinese). 31 March 2021. Retrieved 31 March 2021.
  3. ^ "沪苏湖铁路来了,长三角交通网越织越密-新华网". sh.xinhuanet.com. Retrieved 2020-07-02.


Retrieved from ""