Line 3 (Shanghai Metro)

From Wikipedia, the free encyclopedia
Line 3
SHM Line 3 icon.svg
CNR-Alstom Line3.PNG
A 03A02 train at Zhongshan Park station.
Overview
Other name(s)M3 (planned name)
Pearl line (Chinese: 明珠线)
StatusOperational
LocaleXuhui, Changning, Putuo, Jing'an, Hongkou, and Baoshan districts
Shanghai
TerminiNorth Jiangyang Road
Shanghai South Railway Station
Stations29 (of which 9 shared with Line 4)
Service
TypeUrban rail transit in China Rapid transit
SystemShanghai Metro Shanghai Metro
ServicesMainline: Shanghai South Railway StationNorth Jiangyang Road Partial Mainline: Shanghai South Railway StationSouth Changjiang Road
Operator(s)Shanghai No.3 Metro Operation Co. Ltd.
Depot(s)North Jiangyang Road Depot; Shilong Road Depot
Rolling stock49 Type A 6 car trains
Daily ridership621,000 (2019 Peak)[1]
History
CommencedJune 27, 1997; 24 years ago (1997-06-27)
OpenedDecember 26, 2000; 20 years ago (2000-12-26)
Last extensionDecember 18, 2006; 14 years ago (2006-12-18)
Technical
Line length40.23 km (25.0 mi)[2] (of which 11.57 km (7 mi) shared with Line 4)
Number of tracks2
CharacterUnderground and Elevated plus three At-grade stations
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead wires (1500 volts)
Operating speed80 km/h (50 mph)
Average speed: 34.4 km/h (21 mph)
hide
Route map
hide
Route on the Shanghai map:
  • Shanghai Metro Line3 Map.png
hide
To scale geographic map:
  • Shanghai Metro Line 3.svg

Line 3 is a north-south line of the Shanghai Metro network. Its older rolling stock carry a bright yellow colour belt to differentiate them from Line 4 trains which share a portion of its route, while the newer stock features a yellow and purple livery, which the exact line is labelled using sticker or screens saying “Line 3” or “Line 4”. Unlike the majority of the lines in the Shanghai Metro system, Line 3 is primarily elevated, entirely above ground except for Tieli Road, located at the entrance to Baosteel Group Corporation. The line runs from North Jiangyang Road in the north to Shanghai South Railway Station in the southwest of the city, where it meets Line 1. While Line 1 goes straight through the city center, Line 3 roughly follows the Inner Ring Road around the city from Caoxi Road to Zhongtan Road (where it turns eastwards to join the route of the Shanghai–Nanjing railway). The line is colored yellow on system maps. The line has about 300 drivers. Between December 26, 2000 and August 8, 2002 the line operated under the name Pearl Line; On August 8, 2002 it was renamed as Rail Transit Line 3.

History[]

This line followed the route of historic railway lines Shanghai-Hangzhou Railway Inner Circle Line from Shanghai South Railway Station to Shanghai Railway Station, and Songhu Railway from Baoshan Road station to Jiangwan Town station.

  • December 26, 2000: Shanghai South-Jiangwan Town (trial opening)
  • August 2001: Shanghai South-Jiangwan Town (official opening)
  • January 2004: As part of the Shanghai South reconstruction scheme, Line 3 suspended service at the station, operating between Shilong Road and Jiangwan Town.
  • June 10, 2004: Service suspended at Shilong Road, Longcao Road and Caoxi Road for automatic signal system testing and restoration of land subsidence at these three stations. Service was restored at these stations on July 24.
  • October 15, 2005: Service to Shanghai South Railway Station was restored after the completion of the reconstruction scheme.
  • December 18, 2006: Line 3 was extended from Jiangwan Town 15 km further north to Jiangyang North Road, providing rapid transit service to neighbourhoods in Baoshan, as well as to the Baosteel Group Corporation.[3]

In October 2006, according to a new naming scheme, East Wenshui Road station was renamed Dabaishu station. The scheme stressed naming stations after existing toponyms, sights and attractions (if any) rather than simply after neighbouring vertical streets, making it easier for visitors to find these places.[4] In this particular case, the renaming aimed also to eliminate possible confusion between Wenshui East Road and Wenshui Road, a newer station of line 1. However, in a more recent case, the same type of confusion occurred at West Yingao Road station of line 3 and East Yingao Road station of line 10.

hideShanghai metro line 3 opening history
Segment Date opened Length Station(s) Name
Shanghai South — Jiangwan Town 26 December 2000 24.6 km (15.29 mi) 19 Pearl line
Baoshan Road — Hongqiao Road 31 December 2005 tracks sharing 9 Line 3 & 4 realignment project
Jiangwan Town — North Jiangyang Road 18 December 2006 15.7 km (9.76 mi) 10 Northern extension

Stations[]

Service routes[]

hideShanghai metro line 3 service routes
Routes Station name  4  Connections Distance Location Open-
ing
Plat-
form[5]
M P English Chinese km min
Shanghai South Railway Station 上海南站  1   15   Jinshan  Shanghai South railway station SNH 0.00 0.00 0 Xuhui 26 Dec
2000[6]
At-grade
Island
Shilong Road 石龙路 1.25 1.25 3 At-grade
Side
Longcao Road 龙漕路  12  1.48 2.73 6 Elevated
Side
Caoxi Road 漕溪路 1.03 3.76 8
Yishan Road 宜山路  4 [a]  9  1.54 5.30 10
Hongqiao Road 虹桥路  10  1.37 6.67 13 Changning
West Yan'an Road 延安西路 Trolleybuses in Shanghai Yan'an BRT 1.41 8.08 15
Zhongshan Park 中山公园  2  0.96 9.04 17 Elevated
Island
Jinshajiang Road 金沙江路  13  1.66 10.70 20 Putuo Elevated
Side
Caoyang Road 曹杨路  11  0.90 11.60 22
Zhenping Road 镇坪路  7  1.40 13.00 24
Zhongtan Road 中潭路 1.44 14.44 27
Shanghai Railway Station 上海火车站  1 [b] China Railway SHH 1.72 16.16 29 Jing'an At grade
Island
Baoshan Road 宝山路 2.03 18.19 32 Elevated
Side
Dongbaoxing Road 东宝兴路 1.11 19.30 35 Hongkou
Hongkou Football Stadium 虹口足球场  8  1.28 20.58 37
Chifeng Road 赤峰路 1.15 21.73 39
Dabaishu 大柏树 0.91 22.64 41
Jiangwan Town 江湾镇 1.79 24.43 44
West Yingao Road 殷高西路 1.60 26.03 47 Baoshan 18 Dec
2006[7]
South Changjiang Road 长江南路 1.51 27.54 49
Songfa Road 淞发路 1.69 29.23 52
Zhanghuabang 张华浜 1.52 30.75 54
Songbin Road 淞滨路 1.55 32.30 57
Shuichan Road 水产路 1.24 33.54 59
Baoyang Road 宝杨路 1.75 35.29 62
Youyi Road 友谊路 1.03 36.32 64
Tieli Road 铁力路 1.70 38.02 67 Underground
Side
North Jiangyang Road 江杨北路 2.10 40.12 70 At-grade
Side

Important stations[]

Future expansion[]

The construction of the second phase of the Tonghu high speed railway will include a new railway station, the Shanghai North railway station. This might relocate the northern terminus North Jiangyang Road a bit south.

Headways[]

Because it shares tracks with Line 4, Line 3 operates on a comparatively looser schedule, with an average interval of around 7 minutes (5 minutes in the peak hours).[citation needed] However, riders can expect a 2-minute train interval at any one of the shared-line stations during rush hour. To avoid confusion, Line 3 trains have the number 3 painted on the sides of trains, and Line 4 trains the number 4.

Not all trains serve the whole line. Because Baoshan District is largely suburban, some trains stop service at Changjiang South Road, while others continue to Jiangyang North Road, the northernmost station. Therefore, service between Changjiang South Road and Jiangyang North Road operates on a 10-to-12-minute basis, compared to the rest of the line which operates on a 5-to-7-minute basis. An LED screen in front of a train will indicate its terminal station, in addition to the station broadcast and the arrival board.

Because Line 3 is elevated, transferring to other underground stations typically takes more walking. In-system transfer has been introduced to all interchange stations except Shanghai Railway Station (where Lines 3 and 4 meets Line 1). Virtual interchange is offered at both stations for Public Transportation Card holders.

hideShanghai metro line 3 interval
Time Shanghai South Railway Station
South Changjiang Road
South Changjiang Road
North Jiangyang Road
Monday - Friday (Working Days)
Morning peak 7:30–9:00
Northbound to South Changjiang Road:
About 5 minutes - 7 minutes and 30 seconds
Southbound to Shanghai South Railway Station:
About 2 minutes and 30 seconds - 5 minutes
Northbound to North Jiangyang Road:
About 5 minutes - 10 minutes
Southbound to Shanghai South Railway Station:
About 5 minutes - 10 minutes
Off-peak 9:00–17:00 About 7 minutes About 14 minutes
Evening peak 17:00–19:30 About 5 minutes About 10 minutes
Other hours
First Train — 7:00
19:30 — Last Train
About 7 - 10 minutes About 14 - 17 minutes
Saturday and Sunday (Weekends)
Peak hours 8:00–20:00 About 6 minutes and 30 seconds About 13 minutes
Other hours
First Train — 8:00
20:00 — Last Train
About 7 - 10 minutes About 13 - 16 minutes

[8]

Technology[]

Signaling[]

Lines 3 and 4 has been operating over capacity due to large passenger flows for a number of years. With the continuous extensions of operating time, the problems of aging equipment and increasing passenger demand will further increase the operating pressure of the two lines. In June 2021 it was announced that Shanghai Metro has started to update of the signal system of Lines 3 and 4.[9] These are the last lines in the system that are not equipped with CBTC systems capable of headways as low as 90 seconds. CASCO successfully won the bid for the renewal and transformation of the signaling for Lines 3 and 4 using its self-developed Qiji TACS system.[10]

Rolling Stock[]

The trains are composed of 6-carriages A-cars, with a design speed of 80 km/h, VVVF AC drive, and a design life of 30 years.

hideShanghai metro line 3 Rolling stock
Set Manufacturer Time of
manufac-
turing
Type No
of
car
Assembly[c] Sets Line Notes
28 Alstom Metropolis and CRRC Nanjing Puzhen Co., Ltd. 2002-2004 A 6 Tc+Mp+M+M+Mp+Tc 03A01 Line 3 [11]
21 Alstom Metropolis and CNR Changchun Railway Vehicles Co., Ltd. 2014-2017 A 6 Tc+Mp+M+M+Mp+Tc 03A02 Line 3 Includes 13 sets (numbers 337-349) which are seconded from Line 4. These will be returned to Line 4 after Line 3 and Line 4 are separated.

Notes[]

  1. ^ It is the southernmost station shared by Line 3 and Line 4, although the two lines do not share tracks (the Line 4 station is underground).
  2. ^ Virtual transfer with Line 1 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.
  3. ^ Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.

References[]

  1. ^ "Metro breaks records" (in Chinese). Shanghai Metro 163 Official. 2019-03-09. Retrieved 2019-03-09.
  2. ^ "Operations Overview". Shanghai Metro Operation Co, Ltd. Archived from the original on 2007-08-31. Retrieved 2007-09-22.
  3. ^ "Shanghai's metro line 3 extension to open next monday _Transport—China Economic Net". en.ce.cn.
  4. ^ Three Metro station names will be changed (Shanghai Daily)
  5. ^ 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
  6. ^ 国内首条城市高架铁道上海明珠线即将通车. 新闻晨报. Sina. 2000-12-25.
  7. ^ 3号线北延伸段明试运营 最短行车间隔16.5分钟. 东方网. 2006-12-17.
  8. ^ "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
  9. ^ Blueprint to bring Shanghai's New Cities closer
  10. ^ CASCO Qiji™ TACS is on the stage, Shanghai Line 3/4 will start to upgrade the signal system!
  11. ^ 上海明珠线地铁列车. 中车南京浦镇车辆有限公司 (in Chinese). Retrieved 2020-03-20.
Retrieved from ""