Line 21 (Shanghai Metro)

From Wikipedia, the free encyclopedia
Line 21
 21 
Overview
Other name(s)Line 24 (between 2014 and 2016)
StatusUnder construction
LocalePudong, Shanghai
TerminiDongjing Road
Liuchen Road
Connecting lines 2   6   9   11   12   13   14 
Stations28
Websitewww.shmetro.com
Service
TypeUrban rail transit in China Rapid transit
SystemShanghai Metro Shanghai Metro
Operator(s)Shanghai No. Metro Operation Co., Ltd.
Depot(s)Liuchen Road Depot
Rolling stockType A 6-car trains
History
CommencedJanuary 4, 2022; 21 days ago (2022-01-04)
Planned opening2026; 4 years' time (2026)
Technical
Track length48 km (30 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed100 km/h (62 mph)

Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about 28 km long with 10 stations.[1] Stations will have passing loops to allow for express and local stopping patterns.[1]

The line was announced by the Municipal government in 2016.[2][3] Previous plans in 2014 designated the Disney Resort — Guanglan Road section as Line 24.

Stations[]

Service routes[]

Shanghai metro line 21 service routes
  • M - Mainline: ↔
Routes Station name Connections Distance Location Open-
ing
M English Chinese km min
吴淞口国际邮轮码头  22  (planned) 0.0 0.0 Baoshan Phase III
滨江森林公园 Pudong
凌高路
江东路
West Gaoqiao 高桥西  10 
清溪路
高桥新城
启帆路  20  (planned)
东煦路
Dongjing Road 东靖路  6  0.0 0.0 Pudong Phase I
2026
North Yanggao Road 杨高北路  12 
凌河路
Jinqiao 金桥  9 
Pudong Football Stadium 浦东足球场  14 
龙东大道
Guanglan Road 广兰路  2 
高斯路
张衡路
Xuelin Road 学林路  13 
军民路
康南路
张江  Airport Link 
申江南路
Disney Resort 迪士尼  11 
唐黄路
六陈路 28
施新路 Pudong East extension
2026
金闻路
Shanghai East railway station 上海东站  Airport Link   Lianggang Express     (planned) Shanghai East railway station (u/c)
浦东机场T3航站楼  2   Maglev  Shanghai Pudong Airport APM  Airport Link   Lianggang Express  42

Important stations[]

The line will interchange with various lines in Pudong at the following stations:

References[]

  1. ^ a b "上海轨道交通21号线(一期)环评报批前公示-基础工程网". www.jcgcw.com. Retrieved 2022-01-17.
  2. ^ "Shanghai Municipal Government: City mulls plan for nine more Metro projects". publicnow.com. 20 April 2016. Retrieved 24 April 2016.
  3. ^ 上海市轨道交通近期建设规划(2017-2025)出炉 规划有9条线路 (in Chinese). Shanghai Municipal Government. 19 April 2016. Retrieved 24 April 2016.


Retrieved from ""