Line 21 (Shanghai Metro)
Line 21 | |
---|---|
21 | |
Overview | |
Other name(s) | Line 24 (between 2014 and 2016) |
Status | Under construction |
Locale | Pudong, Shanghai |
Termini | Dongjing Road Liuchen Road |
Connecting lines | 2 6 9 11 12 13 14 |
Stations | 28 |
Website | www |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Operator(s) | Shanghai No. Metro Operation Co., Ltd. |
Depot(s) | Liuchen Road Depot |
Rolling stock | Type A 6-car trains |
History | |
Commenced | January 4, 2022 |
Planned opening | 2026 |
Technical | |
Track length | 48 km (30 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Operating speed | 100 km/h (62 mph) |
Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about 28 km long with 10 stations.[1] Stations will have passing loops to allow for express and local stopping patterns.[1]
The line was announced by the Municipal government in 2016.[2][3] Previous plans in 2014 designated the Disney Resort — Guanglan Road section as Line 24.
Stations[]
Service routes[]
Shanghai metro line 21 service routes | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||
Routes | Station name | Connections | Distance | Location | Open- ing | |||||
M | English | Chinese | km | min | ||||||
吴淞口国际邮轮码头 | 22 (planned) | 0.0 | 0.0 | Baoshan | Phase III | |||||
滨江森林公园 | Pudong | |||||||||
凌高路 | ||||||||||
江东路 | ||||||||||
West Gaoqiao | 高桥西 | 10 | ||||||||
清溪路 | ||||||||||
高桥新城 | ||||||||||
启帆路 | 20 (planned) | |||||||||
东煦路 | ||||||||||
Dongjing Road | 东靖路 | 6 | 0.0 | 0.0 | Pudong | Phase I 2026 | ||||
North Yanggao Road | 杨高北路 | 12 | ||||||||
凌河路 | ||||||||||
Jinqiao | 金桥 | 9 | ||||||||
Pudong Football Stadium | 浦东足球场 | 14 | ||||||||
龙东大道 | ||||||||||
Guanglan Road | 广兰路 | 2 | ||||||||
高斯路 | ||||||||||
张衡路 | ||||||||||
Xuelin Road | 学林路 | 13 | ||||||||
军民路 | ||||||||||
康南路 | ||||||||||
张江 | Airport Link | |||||||||
申江南路 | ||||||||||
Disney Resort | 迪士尼 | 11 | ||||||||
唐黄路 | ||||||||||
六陈路 | 28 | |||||||||
施新路 | Pudong | East extension 2026 | ||||||||
金闻路 | ||||||||||
Shanghai East railway station | 上海东站 | Airport Link Lianggang Express (planned) (u/c) | ||||||||
浦东机场T3航站楼 | 2 Maglev Shanghai Pudong Airport APM Airport Link Lianggang Express | 42 | ||||||||
Important stations[]
The line will interchange with various lines in Pudong at the following stations:
- Dongjing Road (Line 6)
- North Yanggao Road (Line 12)
- Guanglan Road (Line 2)
- Zhangjiang Road (Line 13)
- Disney Resort (Line 11)
References[]
- ^ a b "上海轨道交通21号线(一期)环评报批前公示-基础工程网". www.jcgcw.com. Retrieved 2022-01-17.
- ^ "Shanghai Municipal Government: City mulls plan for nine more Metro projects". publicnow.com. 20 April 2016. Retrieved 24 April 2016.
- ^ 上海市轨道交通近期建设规划(2017-2025)出炉 规划有9条线路 (in Chinese). Shanghai Municipal Government. 19 April 2016. Retrieved 24 April 2016.
Categories:
- Shanghai Metro lines
- Proposed buildings and structures in Shanghai
- Proposed public transport in China
- Shanghai Metro stubs