Foshan–Dongguan intercity railway

From Wikipedia, the free encyclopedia
Foshan–Dongguan
intercity railway
Overview
Native name佛莞城际轨道交通
佛莞线
StatusUnder Construction
LocalePeople's Republic of China
TerminiDongguan West
Panyu (through operation to Foshan West)
Stations7
Service
TypeHigher-speed rail
Operator(s)China Railway High-speed
History
Planned opening2021[1]
Technical
Line length36.681 km (23 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed200 km/h (124 mph)
Foshan–Dongguan ICR
Legend
Dongguan West Urban rail transit in China
Guangzhou–Shenzhen ICR
to Guangzhou South
Shizhiyang Tunnel
under Pearl River
(
6.258 km
3.889 mi
)
Guanqiao Urban rail transit in China
Guangzhou Changlong Urban rail transit in China
Changlong Tunnel (
10.800 km
6.711 mi
)
Panyu Urban rail transit in China
Foshan West
Nanning-Guangzhou HSR
to Nanning

Foshan–Dongguan intercity railway, also called the Foguan intercity railway, is an under construction regional railway within Guangdong province, China, between the cities of Foshan, via Guangzhou, to Dongguan. It forms one leg of the Pearl River Delta Metropolitan Region intercity railway network and will provide connections with the Guangzhou–Shenzhen intercity railway, Dongguan–Huizhou intercity railway and local metro systems. It will connect Panyu District, Guangzhou at the major Guangzhou South interchange, tunnelling under the Pearl River through Machong and Hongmei to Dongguan West providing connections via the Dongguan Rail Transit, the Guangzhou–Shenzhen intercity railway or the Dongguan–Huizhou intercity railway. The length of the railway is 36.681 kilometres. Although this first phase of the project is named Foshan–Dongguan intercity railway, it does not pass through the city of Foshan in any way. The second section of this railway from Panyu to Foshan West has been planned, prepared and the line is under construction as the southern section of Guangzhou–Foshan circular intercity railway.

Overview[]

It is planned to use domestic CRH6 Intercity EMUs on this railway. Targeting a maximum operational speed of up to 200 km/h. According to the plans, construction was expected to start in 2014, with a construction time of about 5 years. It is expected to open in 2021.[1]

Stations[]

Station Name Chinese Distance
km
PRD MIR (CR C-train)
transfers/connections
Metro
transfers/connections
Location
Dongguan West (Dongguanxi) 东莞西 0.00 0.00  GH   SS 
麻涌 5.36 5.36
广州莲花山 9.02 14.38
Guanqiao 官桥 5.48 19.86 Guangzhou Metro  4 
东环 8.35 28.21
Guangzhou Changlong 广州长隆 4.21 32.42 Guangzhou Metro  3   7  (via Hanxi Changlong station)
Panyu 番禺 6.56 38.98  GZ   GFZ   GFC  Guangzhou Metro  2   7  (via Guangzhou South railway station)
Through service via Guangzhou–Foshan circular intercity railway to/from Foshan West
陈村 3.92  GFZ   GFC 
北滘西 6.63  GFZ   GFC 
顺德北 5.21  GFZ   GFC  Mainline rail interchange  Guangfo  (via Dongping station)
张槎 9.48  GFZ   GFC 
Foshan West (Foshanxi) 佛山西 11.18  GFZ   GFC 

References[]

  1. ^ a b "2021年粤港澳大湾区将开工11个城际轨道交通项目". 2021年,粤港澳大湾区将建成广佛环线南段和佛莞城际
Retrieved from ""