Line 12 (Guangzhou Metro)
Line 12 | |
---|---|
12 | |
Overview | |
Status | Under construction |
Locale | Guangzhou, Guangdong, China |
Termini | Xunfenggang Higher Education Mega Center South |
Stations | 25 |
Service | |
Type | Rapid transit |
System | Guangzhou Metro |
Services | 1 |
Technical | |
Line length | 37.6 km (23.36 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 12 of the Guangzhou Metro (Chinese: 广州地铁12号线) is a rapid transit line in Guangzhou, China. It is expected to open in 2023.[1]
History[]
Construction officially began in November 2018.[2]
Stations (north to south)[]
Station name | Connections | ||||
---|---|---|---|---|---|
English | Chinese | ||||
Xunfenggang | 浔峰岗 | 6 | |||
里横路 | |||||
槎头 | 13 | ||||
Julong | 聚龙 | 8 | |||
Baiyun Railway Station | 白云站 | TVQ 8 (via Shitan) 22 24 | |||
南航新村 | |||||
新市墟 | 14 | ||||
Baiyun Culture Square | 白云文化广场 | 2 | |||
云溪公园 | |||||
小金钟 | |||||
景云路 | |||||
广园新村 | 11 | ||||
恒福路 | |||||
建设六马路 | 13 5 (via Taojin) | ||||
Martyrs' Park | 烈士陵园 | 1 | |||
Donghu | 东湖 | 6 10 | |||
二沙岛 | |||||
岭南广场 | |||||
Chigang | 赤岗 | 8 | |||
赤沙 | |||||
赤沙滘 | 11 | ||||
仑头 | |||||
Guanzhou | 官洲 | 4 | |||
Higher Education Mega Center North | 大学城北 | 4 | |||
Higher Education Mega Center South | 大学城南 | 4 7 | |||
Rolling stock[]
The line will use driverless trains.[3]
References[]
- ^ "广州地铁12号线将设17个换乘站并设支线" [Guangzhou Metro Line 12 will have 17 transfer stations and a branch line]. 新华网 (in Chinese). 21 September 2018. Retrieved 12 February 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "广州一天开建6条地铁" [Guangzhou starts construction on six metro lines in a single day]. 人民网 (in Chinese). 20 November 2018. Retrieved 12 February 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "地铁十二号线将实现无人驾驶". 广州市人民政府. 29 May 2017. Retrieved 12 February 2021.
{{cite web}}
: CS1 maint: url-status (link)
Categories:
- Guangzhou Metro lines