Line 5 (Guangzhou Metro)

From Wikipedia, the free encyclopedia
Line 5
 5 
Guangzhou Metro Line 5 CSR Sifang L2 Train 023024 arriving Tanwei Station 2018 01.jpg
Line 5 train near Tanwei
Overview
Other name(s)L2 (5 lines plan name)
M3 (7 lines plan name)
M5 (2000 plan name)
Huanshilu line (环市路线)
StatusOperational
OwnerCity of Guangzhou
LocaleHuangpu, Tianhe, Yuexiu, and Liwan districts
Guangzhou, Guangdong
TerminiJiaokou
Wenchong
Stations24
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Rolling stockCRRC Qingdao Sifang/Kawasaki Heavy Industries Metro cars[1]
Daily ridership1.09 million (2017 daily average)[2]
1.367 million (2015 Peak)[3]
History
Opened28 December 2009; 12 years ago (2009-12-28)
Technical
Line length31.9 km (19.82 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationThird rail, 1,500 V DC
(Overhead lines with same voltage installed in depot)
Route map

Legend
Proposed extension
Huangpu Ferry Terminal
( 8 )
Lujiao Creek
Huangpu Industrial Zone
 13  to Xinsha
Xiayuan
 13 
Longtoushan
Shuanggang
Proposed extension
Wenchong
Dashadong
( 7 )
 7 
Left arrow to Shuixibei
to Guangzhou South Railway StationRight arrow
Dashadi
Huangpu railway
Yuzhu
 13 
 13  to Chaoyang
Yuzhu Depot
Sanxi
Dongpu
connection to Line 4
Chebeinan
 4 
 4 
Left arrow to Huangcun
to Nansha Passenger Port Right arrow
Keyun Lu
Yuancun
 21 ( 11  before 2022)
 21 
Left arrow to Zengcheng Square
Right arrow
Tancun
(  )
Liede
Zhujiang New Town
 3 
 3 
Left arrow to Tianhe Coach Terminal
to Panyu Square Right arrow
Wuyangcun
( 10  Siyou Xinma Lu)
Yangji Stream
Yangji
 1 
 1 
Left arrow to Guangzhou East Railway Station
to Xilang Right arrow
Zoo
 6  to Xiangxue
Ouzhuang
 6 
Taojin
 6 
Xiaobei
Guangzhou Railway Station
 2  ( 11   14 )
 2 
Left arrow to Jiahewanggang
to Guangzhou South Railway Station Right arrow
Xicun
( 8 )
 8 
Left arrow to Jiaoxin
to Wanshengwei Right arrow
Xichang
( 13 )
 13 
Left arrow to Chaoyang
to Xinsha Right arrow
Sima Creek
Zhongshanba
( 11 )
 11  anti-clockwise
 6 
Tanwei
 6 
connection to Line 6
 6  to Xunfenggang
Jiaokou Bus interchange
(  )
Guangmao railway
Line 5
Simplified Chinese广州地铁5号线
Traditional Chinese廣州地鐵5號線

Line 5 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Jiaokou running 31.9 km (19.8 mi) in a wide "∩" shape and ends at Wenchong. Like line 4 and 6 it's equipped with linear induction motor technology. Line 5's color is red. Huangpu Line began operation on 28 December 2009, from Jiaokou to Wenchong. As of May 2017, Line 5 carries an average of 1.05 million passengers per day and is extremely congested throughout the day, operating at over 100% capacity during rush hours.[4][5] The opening of Phase I of Line 13 further increased traffic demand on the west end of Line 5 and pushing congestion to over 130% capacity.[6] Prompting the Guangzhou Metro to limit passenger traffic at a number of subway stations on Line 5.[6] In the future Line 13 Phase II will provide relief for Line 5.

Opening timeline[]

Line 5 drawn to scale.
Segment Commencement Length Station(s) Name
Jiaokou — Wenchong 28 December 2009 31.9 km (19.82 mi) 24 (initial phase)

Stations[]

Station
No.
Station name Connections Distance
km
Location
English Chinese
5 01 Jiaokou 滘口 0.00 0.00 Liwan
5 02 Tanwei 坦尾  6  1.75 1.75
5 03 Zhongshanba 中山八  11  1.54 3.29
5 04 Xichang 西场  13  1.53 4.82
5 05 Xicun 西村  8  0.68 5.50
5 06 Guangzhou Railway Station 广州火车站  2   11   14 

 GS  Guangzhou railway station GZQ

1.58 7.08 Yuexiu
5 07 Xiaobei 小北 2.40 9.48
5 08 Taojin 淘金  12   13  (both via ) 1.10 10.58
5 09 Ouzhuang 区庄  6  1.03 11.61
5 10 Zoo 动物园 1.09 12.70
5 11 Yangji 杨箕  1  1.05 13.75
5 12 Wuyangcun 五羊邨  10  () 1.06 14.81
5 13 Zhujiang New Town 珠江新城  3  0.76 15.57 Tianhe
5 14 Liede 猎德 1.15 16.72
5 15 Tancun 潭村 1.44 18.16
5 16 Yuancun 员村  21  (to be replaced by  11 ) 1.79 19.95
5 17 Keyun Lu 科韵路 1.55 21.50
5 18 Chebeinan 车陂南  4  1.37 22.87
5 19 Dongpu 东圃 1.37 24.24
5 20 Sanxi 三溪 1.55 25.79
5 21 Yuzhu 鱼珠  13  1.79 27.58 Huangpu
5 22 Dashadi 大沙地 1.55 29.13
5 23 Dashadong 大沙东  7  1.33 30.46
5 24 Wenchong 文冲 1.19 31.65

Future Development[]

An eastern extension to Huangpu Passenger Port is currently under construction with opening scheduled in 2023. It is 9.76km long and with seven stations.[7][8]

Station
no.
Station name Connections Distance
km
Location
English Chinese
5 25 双沙 Huangpu
5 26 Miaotou Lu 庙头路
5 27 Xiayuan 夏园  13  Guangzhou Bus Rapid Transit GBRT
5 28 保盈大道
5 29 Guangzhou Development Zone 广州开发区
5 30 Huangpu Passenger Port 黄埔客运港 Dongguan Rail Transit  1  (Planned)

Rolling Stock[]

Line 5 uses six car linear motor trains. In 2020, Guangzhou Metro started bidding for 14 additional trains to supplement the fleet in preparation for the east extension.[9]

Type Time of manufacturing Series Sets Assembly Notes
Type L 2008–2010 L2 30 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Qingdao Sifang[10]
Type L 2011–2013 L4 32 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Qingdao Sifang

References[]

  1. ^ "Guangzhou Metro - Railway Technology".
  2. ^ http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf
  3. ^ 中秋假期广州地铁日均客流730万人次- 新华网. www.gd.xinhuanet.com. Retrieved 2016-09-17.
  4. ^ 广州地铁五号线最小行车间隔压缩至2分06秒_金羊网新闻. news.ycwb.com. Retrieved 2017-07-08.
  5. ^ "广州日报数字报-地铁高峰时段燕塘至广州东最挤". 2018-04-09. Archived from the original on 2018-04-09. Retrieved 2020-05-10.
  6. ^ a b "广州地铁 全程为你--公司新闻". gzmtr.com. Retrieved 2020-05-10.
  7. ^ "广州地铁5号线工可报告获批 将向东延至黄埔客运港站". gd.sina.com.cn. Retrieved 2020-08-22.
  8. ^ "广州地铁5号线东延段要开工啦!黄埔、开发区往返市区更方便!_网易新闻". 2018-01-22. Archived from the original on 2018-01-22. Retrieved 2020-08-22.
  9. ^ "详细页". www.gzggzy.cn. Retrieved 2020-08-22.
  10. ^ "地铁五号线最后一列运到 下月启用27辆新车_广州新闻_大洋网". 2017-01-14. Archived from the original on 2017-01-14. Retrieved 2020-08-22.
Retrieved from ""