Line 8 (Guangzhou Metro)
Line 8 | ||
---|---|---|
8 | ||
Overview | ||
Other name(s) | M2e ("十" shape plan name) M2e / M3e (5 lines plan name) M4 / M5 (7 lines plan name) M8 (2000 plan name) Pazhou line (琶洲线) | |
Status | Operational | |
Owner | City of Guangzhou | |
Locale | Haizhu, Liwan and Baiyun Districts Guangzhou, Guangdong | |
Termini | Jiaoxin Wanshengwei | |
Stations | 26 | |
Service | ||
Type | Rapid transit | |
System | Guangzhou Metro | |
Services | 1 | |
Operator(s) | Guangzhou Metro Corporation | |
Rolling stock | ?? CRRC Zhuzhou Locomotive Metro cars[1] | |
Daily ridership | 645,700 (2017 daily average)[2] | |
History | ||
Opened | 25 September 2010 | |
Technical | ||
Line length | 33.9 km (21.1 mi)[3][4] | |
Number of tracks | 2 | |
Character | Underground | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | |
Electrification | Overhead lines, 1,500 V DC | |
|
Line 8 | |||
---|---|---|---|
Simplified Chinese | 广州地铁8号线 | ||
Traditional Chinese | 廣州地鐵8號線 | ||
Cantonese Yale | Gwóngjāu Deihtit Baat Houh Sin | ||
|
Line 8 of the Guangzhou Metro is a north-west L-shaped line on the system that runs from Jiaoxin to Wanshengwei, spanning a total of 33.9 km (21.1 mi)[3][4] with 26 stations. It interchanges with Line 1 at Chen Clan Academy, Line 2 at Changgang, Line 3 at Kecun, Line 4 at Wanshengwei and Line 6 at Cultural Park. All stations on Line 8 are underground.[5] Line 8's color is teal.
Line 8 used to run as part of Line 2 until the extension to both lines opened for trial operation on 25 September 2010, and Changgang to Fenghuang Xincun started operation on 3 November 2010.[6][7] With the northern extension of Line 8, daily ridership is projected to immediately reach 960,000 passengers per day, growing to 1.33 million per day in the short term and topping 1.65 million per day in the long-term.[8]
History[]
- 2004 - The Line 2 and 8 realignment project; and Line 8 Cultural Park to Xiaogang extension was announced. Creating Line 8 by splitting off the southeastern portion (Xiaogang to Wanshengwei) from Line 2.
- June 2007 - Line 2 and 8 realignment; and Line 8 phase 1 (Cultural Park to Xiaogang extension) was approved by the NDRC.
- 1 August 2007 - Construction of Line 2 and 8 realignment project; and Line 8 phase 1 extension officially commenced.
- 10 March 2010 - Line 8 phase 2 (northern extension) was announced by extend Line 8 from Liwan to Baiyun.
- 21 September 2010 - Line 2's services of train bound between Sanyuanli to Wanshengwei ends.
- 25 September 2010 - Line 2 and 8 realignment project; and Line 8 phase 1 extension first section was completed and enter operation.
- 3 November 2010 - Line 2 and 8 realignment project; and Line 8 phase 1 extension second section enter operation.
- 9 July 2014 - Line 8 phase 3 (further north extension) was announced by further extend Line 8 from Baiyun to Huadu.
- 28 December 2019 - The section from Cultural Park to Fenghuang Xincun was opened.[3]
- 26 November 2020 - The section from Cultural Park to Jiaoxin was opened, except for Xicun and Caihongqiao stations.[4]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Xiaogang — Wanshengwei | 25 September 2010 | 10.8 km (6.71 mi) | 9 | Line 2 & 8 realignment project |
Changgang — Xiaogang | 25 September 2010 | 0.6 km (0.37 mi) | 1 | |
Fenghuang Xincun — Changgang | 3 November 2010 | 4.4 km (2.73 mi) | 3 | |
Cultural Park — Fenghuang Xincun | 28 December 2019[3] | 1.8 km (1.12 mi)[3] | 2 | |
Jiaoxin — Cultural Park | 26 November 2020 | 16.3 km (10.13 mi)[4] | 11 | Northern extension |
Stations[]
Service
routes |
Station no. |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|---|
English | Chinese | |||||||
● | 8 01 | Jiaoxin | 滘心 | Baiyun | ||||
● | 8 02 | Tinggang | 亭岗 | |||||
● | 8 03 | Shijing | 石井 | |||||
● | 8 04 | Xiaoping | 小坪 | |||||
● | 8 05 | Shitan | 石潭 | |||||
● | 8 06 | Julong | 聚龙 | 12 | ||||
● | 8 07 | 上步 | ||||||
● | 8 08 | 同德 | ||||||
● | 8 09 | Ezhangtan | 鹅掌坦 | |||||
| | 8 10 | Xicun | 西村 | 5 | Liwan | |||
| | 8 11 | 彩虹桥 | 11 13 22 | |||||
● | 8 12 | Chen Clan Academy | 陈家祠 | 1 | ||||
● | 8 13 | Hualinsi Buddhist Temple | 华林寺 | |||||
● | 8 14 | Cultural Park | 文化公园 | 6 | ||||
● | 8 15 | Tongfuxi | 同福西 | Haizhu | ||||
● | 8 16 | Fenghuang Xincun | 凤凰新村 | 0.00 | 0.00 | |||
● | 8 17 | Shayuan | 沙园 | Guangfo | 0.90 | 0.90 | ||
● | 8 18 | Baogang Dadao | 宝岗大道 | 1.20 | 2.10 | |||
● | 8 19 | Changgang | 昌岗 | 2 | 0.94 | 3.04 | ||
● | 8 20 | Xiaogang | 晓港 | 0.61 | 3.65 | |||
● | 8 21 | Sun Yat-sen University | 中大 | OSI: 10 () | 1.00 | 4.65 | ||
● | 8 22 | Lujiang | 鹭江 | 1.89 | 6.54 | |||
● | 8 23 | Kecun | 客村 | 3 | 1.26 | 7.80 | ||
● | 8 24 | Chigang | 赤岗 | 12 | 1.46 | 9.26 | ||
● | 8 25 | Modiesha | 磨碟沙 | 18 | 0.70 | 9.96 | ||
● | 8 26 | Xingangdong | 新港东 | 1.61 | 11.57 | |||
● | 8 27 | Pazhou | 琶洲 | 11 | 1.05 | 12.62 | ||
● | 8 28 | Wanshengwei | 万胜围 | 4 THZ1 | 1.95 | 14.57 | ||
Further North Extension[]
Approved and under preparation for construction with an implementation period of 2019 to 2023. This extension will bring Line further North beyond Jiaoxin Station.[9] The extension will have provisions to be divided into two lines at Jiangfu Station. With the northern section of Line 8 between Jiangfu Station and Guangzhou North Railway Station will be spun off to form the new Line 24.[10][11] Line 24 will continue south to central Guangzhou.[12]
Station name | Connections | Location | |
---|---|---|---|
English | Chinese | ||
江府 | 24 | Baiyun | |
江村 | |||
江高 | |||
凤翔路 |
References[]
- ^ https://rail.kychung.com/en/2d-en/guangzhou-metro-line-8-stock/
- ^ http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf
- ^ Jump up to: a b c d e "八号线凤凰新村至文化公园段明天正式运营". 2019-12-27. Archived from the original on 2019-12-27.
凤凰新村至文化公园段长1.8公里,开通后,将连通广州“河南”与沿江路,八号线增加至17.6公里
- ^ Jump up to: a b c d "广州地铁八号线北延段正式开通 同德围"解围"-新华网". www.gd.xinhuanet.com. Retrieved 2020-11-27.
此次开通的八号线北延段全长16.3公里
- ^ "Guangzhou Metro". Railway-Technology.com. Retrieved 14 March 2017.
- ^ 404 Not Found Archived 2010-09-21 at the Wayback Machine
- ^ 广州地铁. Gzmtr.com. 16 September 2010. Archived from the original on 28 February 2012. Retrieved 12 July 2013.
- ^ "广州力争今年建成两条地铁新线--广东频道--人民网". gd.people.com.cn. Retrieved 2019-01-23.
- ^ "今明两年共7条地铁新线动工 快看看有没有经过你家!". cj.sina.com.cn. Retrieved 2018-01-27.
- ^ "广州8号线北延段拟分为两条线 江府站以南为8号线_房产广州站_腾讯网". gz.house.qq.com (in Chinese). Retrieved 2018-01-27.
- ^ "详细页". www.gzggzy.cn. Retrieved 2020-08-22.
- ^ 何雯飔. "多条地铁新线拟"变身":24号线或成又一南北大动脉,10号线设支线通往佛山_广州日报大洋网". news.dayoo.com (in Chinese). Retrieved 2020-08-22.
- Guangzhou Metro lines
- Railway lines opened in 2010