Line 1 (Guangzhou Huangpu Tram)

From Wikipedia, the free encyclopedia
Guangzhou Huangpu Tram Line 1
THP1 101 at Xianjiang Park Station.jpg
Overview
Native name广州黄埔有轨电车1号线
OwnerGuangzhou Development Zone Transport Investment Group
LocaleHuangpu District, Guangzhou, Guangdong
Stations19 (in operation)
20 (future)
Service
TypeTram
SystemGuangzhou Trams
Services1
Operator(s)Guangzhou Tram Co., Ltd.
Depot(s)Lingfu, Yuyan
History
Opened1 July 2020[1]
Technical
Line length14.3 km (8.9 mi)[1]
Number of tracks2
CharacterAt-grade, elevated
Track gauge1,435 mm (4 ft 8+12 in)
Map of Guangzhou Huangpu Tram Line 1

Guangzhou Huangpu Tram Line 1 (Chinese: 广州黄埔有轨电车1号线) is a tram line serving the Huangpu District of Guangzhou. The initial section opened on 1 July 2020.[1] The remaining section opened on 28 December 2020. It is 14.3 km in length with 20 stations, currently 19 stations are operational.

Stations[]

Station

Station name[2] Connections Distance
km
Location
English[2] Chinese
THP1 19 新丰路 Huangpu
THP1 18 贤江
THP1 17 贤江公园
THP1 16 贤江西
THP1 15 岭头东
THP1 14 干部健康中心
THP1 13 岭头
THP1 12 长岭居小学
THP1 11 羌洞
THP1 10 Changping Subway Station 地铁长平站 Guangzhou Metro  21 
THP1 09 北师大实验学校
THP1 08 水西
THP1 07 峻泰路
THP1 06 Shuixi Subway Station 地铁水西站 Guangzhou Metro  21 
THP1 05 会议中心
THP1 04 市民广场 Guangzhou Metro  6  (via Luogang)
THP1 03 线坑
THP1 02 区少年宫(萝岗)
(reserved) 开萝大道
THP1 01 Xiangxue Subway Station 地铁香雪站    Guangzhou Metro  6 

See also[]

References[]

  1. ^ a b c "官宣:黄埔有轨电车1号线示范段明天开通". 2020-06-30.
  2. ^ a b "黄埔有轨电车1号线示范段中英文站名新鲜出炉". 2020-06-19.
Retrieved from ""