Line 20 (Shenzhen Metro)

From Wikipedia, the free encyclopedia
Line 20
20
深圳地铁20号线列车.jpg
Overview
Other name(s)Fuyong line
(福永线; 福永線; Fúyǒng xiàn; fuk1 wing5 sin3)
Native name二十号线; 二十號線; Èrshí hào xiàn; ji6 sap6 hou6 sin3
StatusOperational
OwnerShenzhen Metro Group
LocaleShenzhen, China
TerminiAirport North
Stations5 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
History
Opened28 December 2021; 27 days ago (2021-12-28)
Technical
Line length8.43 km (5.24 mi) (Phase 1)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead Line, 1,500 V DC
Route map

Legend
12 Right arrow to Haishangtianyuan East
12
12
12 Right arrow to Zuopaotai
11 Up arrow to Bitou
Airport North Depot (Line 20)
Airport North Stabling Yard (Line 11)
Airport North
11
11 Down arrow to Futian
Future extension

Line 20 is a rapid transit line in the Shenzhen Metro system. The line connects Airport North with the .[2][3]

Construction started on 24 November 2016.[2] The National Development and Reform Commission approved the project in March 2020.[4] It opened on 28 December 2021,[5] after being delayed since 2018.[2]

Stations[]

Station name[6] Connections Nearby bus stops Distance
km
Location
English Chinese
会展城 Bao'an
国展北
国展
国展南
Airport North 机场北 11 Shenzhen Bao'an International Airport SZX

References[]

  1. ^ "深圳地铁四期建设规划调整方案获批". 2020-04-11.
  2. ^ a b c "深圳市地铁20号线全线开工". 2016-11-24.
  3. ^ "深圳国际会展中心配套市政项目总体设计专家评审会顺利召开". www.mp.weixin.qq.com. Retrieved 2016-07-08.
  4. ^ "国家发展改革委关于调整深圳市城市轨道交通第四期建设规划方案的批复". 2020-03-26. Retrieved 2020-04-26.
  5. ^ "铁建南方领导到20号线检查工作". 铁建南方.
  6. ^ "市规划和自然资源局关于深圳市城市轨道交通20号线交通详细规划(草案)的公示". 2021-11-22.
Retrieved from ""