Line 3 (Suzhou Rail Transit)

From Wikipedia, the free encyclopedia
Line 3
 3 
Suzhou Metro Line 3.svg
Map of Line 3
Overview
StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
TerminiSuzhou Xinqu Railway Station
Stations37
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
History
Opened25 December 2019[1]
Technical
Line length45.272 km[2]
Track gauge1,435 mm (4 ft 8+12 in)

Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.

Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]

Stations[]

Station name Connections Distance
km
Location
English Chinese
Suzhou Xinqu Railway Station 苏州新区火车站  6  Suzhou New District railway station ITH 0.00 0.00 Huqiu
惠昌路
文昌路
长亭
铜墩
马运路
西津桥  8 
何山
Shizishan 狮子山  1 
狮山路
沙金桥
索山桥西  5 
横山
横塘
石湖北
新郭 Gusu
Panlilu 盘蠡路  2  Wuzhong
Baodailu 宝带路  4 
迎春路
北港路 SIP
通园路南  7 
墅浦路北
东振路
金厍桥  5 
李公堤西  6 
Dongfangzhimen 东方之门  1 
烟雨桥
泥浜
唐庄  8 
跨塘
Suzhou Yuanqu Railway Station 苏州园区火车站  8  Suzhou Industrial Park railway station KAH
方湾街
丰和路
双马街
葑亭大道  5 
戈巷街
唯亭  S1 

Map[]

Suzhou Metro Line 3.svg

Future Development[]

Line 3 can interchange with Line S1 of Suzhou Rail Transit in 2023. Line S1 of Suzhou Rail Transit (opening in 2023) will serve Kunshan city and interchange with Shanghai Metro (Line 11).[4]

Gallery[]

References[]

  1. ^ a b "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
  2. ^ a b "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
  3. ^ "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07. 此次“万人试乘”活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00
  4. ^ "上海11号线、17号线有望接轨苏州S1线、4号线". sh.sina.com.cn. Retrieved 2016-08-26.
Retrieved from ""