Line 1 (Changzhou Metro)

From Wikipedia, the free encyclopedia
Line 1
 1 
Rolling stock
Overview
StatusIn operation
LocaleChangzhou
Termini
Nanxiashu
Stations29[1]
Service
TypeRapid transit
SystemChangzhou Metro
History
Opened21 September 2019[2]
Technical
Line length34.24 km (21.28 mi)[3]
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)

Line 1 of Changzhou Metro (Chinese: 常州地铁1号线; pinyin: Chángzhōu Dìtiě Yī Hào Xiàn) is a rapid transit line in Changzhou. It connects the two railway stations Changzhou and Changzhou North.

Construction for Line 1 began on 28 October 2014. The first phase runs from (森林公园) in the north to Nanxiashu (南夏墅) in the south. Line 1 opened on 21 September 2019.[2]

Opening timeline[]

Segment Commencement Length Station(s) Name
Forest Park — Nanxiashu 21 September 2019[2] 34.24 km (21.28 mi)[3] 29 Phase 1

Stations[]

station name Connections Distance
km
Location
English Chinese
森林公园
新龙
旅游学校
新桥
Changzhou North Railway Station 常州北站 China Railway ESH
Bus rapid transit Changzhou BRT
北郊中学 Bus rapid transit Changzhou BRT
外国语学校 Bus rapid transit Changzhou BRT
环球港
新区公园
河海
奥体中心
市民广场
翠竹
Changzhou Railway Station 常州火车站 China Railway CZH
博爱路
文化宫  2 
Bus rapid transit Changzhou BRT
同济桥
清凉寺
茶山
聚湖路
湖塘
新天地公园
长虹路
延政大道
科教城北
科教城南 Bus rapid transit Changzhou BRT
武进沿江城际
阳湖路
Nanxiashu 南夏墅

References[]

  1. ^ "揭开神秘面纱 常州地铁1号线向媒体开放".
  2. ^ a b c "常州地铁1号线今日正式开通初期运营". 2019-09-21.
  3. ^ a b "定了!常州市轨道交通1号线本周六上午9:30开通". 2019-09-18.
Retrieved from ""