Line 2 (Changzhou Metro)

From Wikipedia, the free encyclopedia
Line 2
 2 
Overview
StatusIn operation
LocaleChangzhou
Termini
Stations15
Service
TypeRapid transit
SystemChangzhou Metro
History
Opened28 June 2021
Technical
Line length19.79 km (12.30 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)

Line 2 of Changzhou Metro (Chinese: 常州地铁2号线) is a rapid transit line in Changzhou.

Construction for Line 2 began on 13 February 2017. The first phase runs from (青枫公园站) in the west to (五一路站) in the east. Line 2 opened on 28 June 2021.[1][2][3][4]

Opening timeline[]

Segment Commencement Length Station(s) Name
Qingfeng Park — Wuyi Lu 28 June 2021 19.79 km (12.30 mi) 15 Phase 1

Stations[]

station name Connections Distance
km
Location
English Chinese
青枫公园
海棠路
五星
勤业
怀德
南大街
文化宫  1 
红梅公园
五角场
三角场
紫云
青洋路
丁堰
潞城
五一路

References[]

  1. ^ "Changzhou's second metro line inaugurated". Metro Report International. 2021-07-06. Retrieved 2021-07-16.
  2. ^ "Changzhou Rail Transit Line 2 attracts 640,000 people for popular test rides". Seetao. 2021-06-22. Retrieved 2021-07-16.
  3. ^ "常州地铁2号线一期工程全面开工 2020年试运营". 2017-02-13. Archived from the original on 2019-11-01. Retrieved 2019-11-06.
  4. ^ "常州地铁二号线开通 "地铁时代"跨入"换乘时代"". 2021-06-23.
Retrieved from ""