Line 5 (Suzhou Rail Transit)

From Wikipedia, the free encyclopedia
Line 5
 5 
Overview
StatusOperational
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations34
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
History
OpenedJune 29, 2021
Technical
Line length44.1 km[1]
Track gauge1,435 mm (4 ft 8+12 in)

Line 5 is a west–east line of Suzhou Rail Transit. It opened on June 29, 2021. The line is 44.1 kilometers long.[1] Its western terminus will be at Taihu Xiangshan station[2] in Wuzhong District, with its eastern terminus at Yangchenghu South station[2] in Suzhou Industrial Park.[3] 50 six car type B fully automated subway trains were ordered for the line.[4]

Stations[]

Station name[2] Connections Distance
km
Location
English Chinese
太湖香山 0.00 0.00 Wuzhong
花墩
津桥
胥口
茅蓬路东
许家桥
灵岩山
渎川桥
大治桥
西跨塘
石城 Huqiu
落星桥
索山桥西  3 
双桥 Gusu
Laodonglu 劳动路  2 
新市桥
Nanmen 南门  4 
南园北路
竹辉桥
荷花荡 SIP
黄天荡  7 
金厍桥  3 
星波街
李公堤南
金湖
华莲
斜塘  8 
苏州奥体中心  6 
方洲公园
Xingtangjie 星塘街  1 
龙墩
东沙湖
葑亭大道  3 
[a] 阳澄湖南[a]
  1. ^ a b The station is not the same station as another Yangchenghu South station on Line S1.

References[]

  1. ^ a b "苏州轨交5号获批复 全长44.1公里". 2015-07-31.
  2. ^ a b c "这条明年开通的轨交线,站点名定了!". Retrieved 2021-01-21.
  3. ^ "The introduction of Suzhou Rail Transit stations" (in Chinese). Suzhou Rail Transit Co., Ltd. Archived from the original on 2012-07-13. Retrieved 2012-06-29.
  4. ^ "江苏首个全自动驾驶!苏州轨道交通5号线首列车今天下线". 2019-09-18.{{cite web}}: CS1 maint: url-status (link)
Retrieved from ""