Line 2 (Xuzhou Metro)

From Wikipedia, the free encyclopedia
Line 2
 2 
XZM2 0201 at Xinqudong Depot (20191206134245).jpg
Overview
Native name徐州地铁2号线
StatusOperational
LocaleXuzhou, Jiangsu
Termini
Stations20
Service
TypeRapid transit
SystemXuzhou Metro
Rolling stockType B (CRRC Nanjing Puzhen)
History
Commenced2016
OpenedNovember 28, 2020; 14 months ago (2020-11-28)[1]
Technical
Line length24.25[1] km (15.07 mi)
Number of tracks2
CharacterUnderground
Operating speed80 km/h (50 mph)

Line 2 of the Xuzhou Metro (Chinese: 徐州地铁2号线; pinyin: Xúzhōu dìtiě èr hào xiàn) is a rapid transit line in Xuzhou city, Jiangsu province, China. Construction commenced in February 2016,[2] and the line was opened on November 28, 2020.[1] It is the second metro line to open in Xuzhou.

Line 2 runs primarily north–south through Xuzhou's CBD and Xuzhou New District, from North Coach Station in the north to Xinchengqu East in the south.

Line overview[]

Phase 1 stations (from north to south)
Station Name Platform Type Connections Status
English Chinese
客运北站 Underground, island Operational
李沃
九里山
奔腾大道   
九龙湖
庆云桥
彭城广场  1 
户部山
师大云龙校区   
中心医院
淮塔   
科技城
七里沟   
百果园
拖龙山
大龙湖
市行政中心   
汉源大道
新元大道   
新城区东   

History[]

Xuzhou Metro Line 2 officially began construction on February 22, 2016. As of September 2018, about half of the stations have begun main structure construction, while the other half have been capped successfully. Tunneling has begun on most stations, with eight stations having tunneled through for both tracks on the line.

Civil engineering work on Line 2 is expected to complete in May 2019, with railway work completing in October 2019. Installation of electromechanical equipment will complete in March 2020, railway adjustment work will complete in June 2020, rolling stock will be tested on the line from July 1 to September 30, 2020, and the line opened to traffic in November 2020.[1][2][3]

As of 2018, the second phase has not begun construction; it will include six elevated stations to the south of Xinchengqu East Station.

References[]

  1. ^ a b c d "徐州2号线首列电客车来了!". 2019-05-28.
  2. ^ a b "轨道交通2号线一期工程中心医院站主体结构顺利封顶" [The main structure of the Central Hospital Station on the first phase of rail transit line 2 was successfully capped]. Xuzhou Rail Transit. 2018-08-31.
  3. ^ "徐州地铁最新消息!1号线明年10月通车!" [Xuzhou Metro latest news! Line 1 will open to traffic in October next year!]. 淮海地铁圈 (Huaihai Metro Loop). 2018-09-22. Retrieved 2018-09-22.
Retrieved from ""