Line 30 (Chengdu Metro)

From Wikipedia, the free encyclopedia
Chengdu Metro Line 30
30
Overview
StatusConstruction
OwnerCity of Chengdu
LocaleChengdu, Sichuan
TerminiTerminal 2 of Shuangliu International Airport
[1]
Stations24[1]
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)
Depot(s)Gaobeiba Depot (高碑坝车辆段)
Hongjiaqiao Depot (洪家桥停车场)
History
Planned opening2024
Technical
Line length27.74 km (17.2 mi)[1]
Number of tracks2
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead lines, 1,500 V DC
Operating speed80km/h

Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport to .[1] Phase 1 is 27.74 km long with 24 stations, all underground.[1] Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h.[2] Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.[2]

History[]

  • On Aug 21, 2019, Line 30 is approved officially as part of the fourth phase expansion for the Chengdu Metro by the National Development and Reform Commission, confirming it for 2019-2024's subway construction plan.
  • On March 18, 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[3]
  • On July 17, 2020, Construction officially started for the 4 stations on Line 30 in Longquanyi District.[4]

Stations[]

Station name Transfer Distance
km
Location
English Chinese
Terminal 2 of Shuangliu International Airport 双流机场2航站楼 10 0.00 0.00 Shuangliu
寺圣 2.09 2.09
星月 0.81 2.90
光明 0.92 3.82
谢家渡 1.31 4.13
Zhujiang Road 珠江路 8    0.66 5.79
大同 1.34 7.13
Shiyang 石羊 8    1.99 9.12 High-Tech Zone
新园大道 0.87 9.99
Chengdu First People's Hospital 市一医院 5 1.15 11.14
益州大道 0.84 11.98
金融城北 0.86 12.84
府城桥 0.61 13.44
Jinshi Road 金石路 6 1.25 14.69 Jinjiang
棬子树 1.59 16.28
锦逸 0.99 17.27
娇子立交 13 1.70 18.97
海桐街 0.90 19.87
航天立交 1.01 20.87
Huiwangling 惠王陵 2 1.07 21.94 Longquanyi
玉石 1.37 23.31
分水 1.09 24.40
[1] 银玉路
[1] 龙泉

References[]

  1. ^ a b c d e f g "轨道交通30号线一期工程". Archived from the original on 2021-11-10. 30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74km,共设车站24座,全部为地下线
  2. ^ a b "成都轨道交通30号线一期工程 首次环境影响评价信息公开". 成都轨道集团官方网站. Retrieved 2020-02-19.
  3. ^ "刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线". sichuan.scol.com.cn. Retrieved 2020-06-14.
  4. ^ "喜!成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点".
Retrieved from ""