Line 10 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

Line 10
10
Sanyawan Station Line 10.jpg
Sanyawan Station platform
Overview
Native name重庆轨道交通10号线
StatusOperational
Line number10
LocaleChongqing, China
Termini
Liyuchi
Stations19
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017; 4 years ago (2017-12-28)
Technical
Line length34 km (21 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Legend
Lanhua Road depot
Left arrow (ACW) Loop line (CW) Right arrow
Nanping
across Yangtze River
Qixinggang
Zengjiayan
across Jialing River
Liyuchi
Line 9 to
Hongtudi
Chongqing N. Station
S. Square
Chongqing N. Station
N. Square
Bus interchange Chongqing North railway station 4
Line 9 to
Changhe
Zhujiawan depot
Jiangbei Airport
Terminal 3
Jiangbei Airport
Jiangbei Airport
Terminal 2
Jiangbei Airport Bus interchange 3
Line 5 to
Line 5 to
Wangjiazhuang depot

Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1] Rapid trains started operating on Line 10 in June 2020.[2]

Opening timeline[]

Segment Commencement Length Station(s) Name
Wangjiazhuang – Liyuchi 28 December 2017 33.7 km (20.94 mi) 18 Phase 1
S. Square of Chongqing N. Railway Station 28 December 2018 infill station 1

Stations (north to south)[]

Service
routes
Station
Station name Connections Distance
km
Location
R L English Chinese
10/27 王家庄 Int'l Expo Yubei
| 10/26 悦来 Int'l Expo 2.04 2.04
| 10/25 中央公园西 5 2.71 4.75
| 10/24 中央公园 1.09 5.84
| 10/23 中央公园东 9 0.82 6.66
| 10/22 鹿山 1.64 8.30
| 10/21 渝北广场 2.05 10.35
10/20 Terminal 2 of Jiangbei Airport 江北机场T2航站楼 3 Chongqing Jiangbei International Airport CKG 0.74 11.09
10/19 Terminal 3 of Jiangbei Airport 江北机场T3航站楼 Chongqing Jiangbei International Airport CKG 2.22 13.31
| 10/18 Changhe 长河 5.31 18.62
| 10/17 环山公园 1.85 20.47
| 10/16 上湾路 9 1.67 22.14
| 10/15 三亚湾 2.74 24.88
| 10/14 民心佳园 2.08 26.96
10/13 Chongqing North Station (North Square)[a] 重庆北站北广场 4  YW  Chongqing North railway station CUW 2.61 29.57
10/12 Chongqing North Station (South Square)[a] 重庆北站南广场 3 Loop  YW  Chongqing North railway station CUW 0.60 30.17
| 10/11 龙头寺公园 0.87 31.04
10/10 Hongtudi 红土地 6 1.63 32.67 Jiangbei
10/09 Liyuchi 鲤鱼池 9 1.09 33.76

Phase II (Under construction)[]

  • Under construction. The extension is 9.86 km in length.[3]
Station
Station name Connections Distance
km
Location
English Chinese
10/08 Zengjiayan 曾家岩 2 Yuzhong
10/07 大礼堂
10/06 Qixinggang 七星岗 1
10/05 南滨路 Nan'an
10/04 Nanping 南坪 3
10/03 万寿路
10/02 南湖 Loop
10/01 兰花路

Notes[]

  1. ^ a b The former translation is North/South Square of Chongqingbei Railway Station, which has been changed since the opening of the Line 10's station

References[]

  1. ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.
  2. ^ "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
  3. ^ "重庆轨道交通10号线二期大礼堂站至曾家岩站区间隧道贯通". 重庆轨道交通10号线二期线路全长9.86公里,共设8座车站
Retrieved from ""