Line 27 (Chongqing Rail Transit)
Line 27 | |
---|---|
27 | |
Overview | |
Termini | Bishan |
Stations | 14 |
Service | |
Type | Rapid transit |
System | Chongqing Rail Transit |
Operator(s) | Chongqing Rail Transit Corporation Limited |
Technical | |
Line length | 51.8 km (32.2 mi) |
Electrification | 25kV AC[1] |
Operating speed | 140 km/h (87 mph) |
Line 27 of Chongqing Rail Transit is a rapid transit line in Chongqing, China. It is currently under planning and expected to start construction in 2021.[2] The line will be 51.8 kilometres (32.2 mi) long and trains will run at a maximum speed of 140 kilometres per hour (87 mph).[3] It will through operate with the Bitong Line and continue to Tongliang.[4][5]
Stations[]
Station name | Connections | ||
---|---|---|---|
English | Chinese | ||
Bishan | 璧山 | 1 Bishan Tram | |
虎溪 | |||
大学城南 | |||
寨山坪 | |||
西永 | |||
Ciqikou | 磁器口 | 1 | |
Shapingba | 沙坪坝 | 1 9 Loop | |
Shiqiaopu | 石桥铺 | 1 5 | |
大坪西 | |||
重庆站 | 18 | ||
Nanping | 南坪 | 3 10 | |
广福大道 | |||
重庆东 | 6 | ||
References[]
- ^ http://www.freezepage.com/1604556595FNFWJZOXCI
- ^ "城轨快线15号、27号线今年开建" [Line 15 and 27 of the City Rail Express will start construction this year]. cq.xinhuanet.com (in Chinese). 30 January 2021. Retrieved 31 January 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "设14座车站建设工期72个月 重庆轨道27号线将这样建" [The construction of 14 stations will take 72 months and Chongqing Rail Transit Line 27 will be built in this way]. cq.xinhuanet.com (in Chinese). 4 November 2020. Retrieved 31 January 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "璧铜线开工 | 璧铜线设站9座 新型快线车从铜梁一小时飙拢解放碑-上游新闻 汇聚向上的力量". www.cqcb.com. Retrieved 2022-01-24.
- ^ "国内首个PPP+TOD轨道交通项目亮相璧铜线_铜梁". www.sohu.com. Retrieved 2022-01-24.
Categories:
- Chongqing Rail Transit lines
- People's Republic of China rapid transit stubs