Line 18 (Chongqing Rail Transit)
Line 18 | |
---|---|
18 | |
Overview | |
Native name | 重庆轨道交通18号线 |
Status | Under construction |
Line number | 18 |
Locale | Chongqing, China |
Termini | |
Stations | 19 |
Service | |
Type | Rapid transit |
System | Chongqing Rail Transit |
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. |
History | |
Planned opening | 2023 |
Technical | |
Line length | 29.45 km (18.30 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | 1500 V DC Overhead line |
Line 18 (formerly known as Line 5A) of CRT is a rapid transit line in Chongqing, China.
Stations[]
Phase I[]
Phase I of Line 18 is expected to be opened in around 2023.[1]
Station No. |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English (probable) | Chinese | ||||||||
富华路 | 9 | Yuzhong | |||||||
Xietaizi | 歇台子 | 1 5 | Jiulongpo | ||||||
奥体中心 | Loop | ||||||||
石坪桥 | |||||||||
Yangjiaping | 杨家坪 | 2 | |||||||
滩子口 | |||||||||
重庆南站 | |||||||||
黄桷坪 | |||||||||
五龙庙 | |||||||||
桥南村 | Ba'nan | ||||||||
外河坪 | |||||||||
袁家湾 | |||||||||
简家槽 | |||||||||
茄子溪 | Dadukou | ||||||||
白居寺 | 2 | ||||||||
伏牛溪 | |||||||||
金鳌山 | |||||||||
跳磴 | 5 Jiangtiao | ||||||||
跳磴南 | |||||||||
Phase II[]
- Currently under construction[2]
Station No. |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
Xiaoshizi | 小什字 | 1 6 | Yuzhong | ||||||
凯旋路 | |||||||||
十八梯 | |||||||||
Qixinggang | 七星岗 | 1 10 | |||||||
重庆站 | 27 | ||||||||
菜袁路 | |||||||||
黄沙溪 | |||||||||
大坪西 | |||||||||
References[]
- ^ "轨道交通5A线、4号线二期、5号线北延伸段 3条轨道交通线路开工 总投资515亿元". January 25, 2019.
- ^ "重庆新开工4条轨道线路 看看这些站有没有经过你家". March 2, 2021.
Categories:
- Chongqing Rail Transit lines