Xilang station

From Wikipedia, the free encyclopedia

Xilang

西塱
Guangzhou Metro
Xilang Station Platform center For Line 1.JPG
Chinese name
Traditional Chinese西塱站
General information
LocationHuadi Avenue South(花地大道南)
Liwan District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Foshan Railway Investment Construction Group Co. Ltd.
Line(s)
Platforms5 (3 island platforms
1 side platform)
Construction
Structure typeAt-grade
(Guangzhou Line 1)
Underground
(Guangfo Line/Foshan Line 1)
Other information
Station code1 01 (Line 1)
GF 18 (Guangfo Line)
History
Opened28 June 1997
(Guangzhou Line 1)
3 November 2010
(Guangfo Line/Foshan Line 1)
Services
Preceding station   Guangzhou Metro   Following station
TerminusLine 1
Guangfo line
toward Lijiao

Xilang station (Chinese: 西塱站; pinyin: Xīlǎng Zhàn; Jyutping: sai1long5 zaam6 [note 1]), formerly Guanggang station[1] because of nearby 's headquarters when planning,[2] is a terminus of Line 1 of the Guangzhou Metro and Guangfo Line (FMetro Line 1). It started operations on 28 June 1997. It was situated at the underground of Huadi Avenue South[3] in Fangcun, Liwan District.[4]

During COVID-19 pandemic control rules from 29 May to 24 June 2021, services of Xilang station had been largely restricted, as all entrances and exists are closed, passengers can't embark or disembark at this station, and while the trains on both lines can still stop here, passengers can only transfer between both lines within the fare zone.[5] The entrance has reopened in the afternoon of 24 June.

Station layout[]

F3
Offices
- Offices
F2
Concourse
Line 1 Lobby Customer Service, Shops, Vending machines, ATMs, Transfer passageways between Lobbies
G
Platforms
Platform 5  1  termination platform(back to Xilang Depot)
Island platform, alighting passengers only
Platform 4
Platform 3
 1  towards Guangzhou East Railway Station (Kengkou)
Island platform, boarding passengers only
Platform 2
Platform 1
 1  towards Guangzhou East Railway Station (Kengkou)
Side platform, alighting passengers only
B1
Concourse
Guangfo Line Lobby Customer Service, Shops, Vending machines, ATMs, Transfer passageways between Lobbies
B2
Platforms
Platform 7  Guangfo  towards Xincheng Dong (Jushu)
Island platform, doors will open on the left
Platform 6  Guangfo  towards Lijiao (Hedong)

Exits[]

Exit number Exit location
Exit A Huadi Daodaozhong
Exit B Huadi Daodaozhong
Exit D Huadi Daodaozhong
Exit F Huadi Daodaozhong
Exit J Huadi Daodaonan

References[]

  1. ^ Its Chinese name was 西朗站 before September 2018, due to lack of Unicode CJK Unified Ideographs support in early ticket system and signal system, where the 塱 is coded U+5871 in the block
  1. ^ simplified Chinese: 广钢站; traditional Chinese: 廣鋼站; pinyin: Guǎnggāng Zhàn; Jyutping: gwong2gong3 zaam6; lit. 'Guangzhou Iron and Steel Plant Station'
  2. ^ 地鐵三四號線六站更名 "廣州豐田"成站名 (in Simplified Chinese).
  3. ^ 花地大道南; Huādì Dàdào Nán; faa1dei6 daai6dou6 naam4; 'Flower Ground South Avenue'
  4. ^ Xilang
  5. ^ Li Tianyan (6 June 2021). "6月7日起,芳村区域所有地铁站停运". Guangzhou Daily.

Coordinates: 23°03′52″N 113°13′56″E / 23.06444°N 113.23222°E / 23.06444; 113.23222

Retrieved from ""