One Corporate Centre
One Corporate Centre | |
---|---|
General information | |
Status | Completed |
Type | Office |
Location | Meralco Avenue corner Julia Vargas Avenue, Ortigas Center, Pasig, Philippines |
Coordinates | 14°35′1.54″N 121°3′48.13″E / 14.5837611°N 121.0633694°ECoordinates: 14°35′1.54″N 121°3′48.13″E / 14.5837611°N 121.0633694°E |
Construction started | 2005 |
Opening | 2009 |
Owner | Amberland Corporation |
Height | |
Antenna spire | 201.5 m (661.09 ft) |
Roof | 185 m (606.96 ft) |
Technical details | |
Floor count | 45 aboveground, 9 belowground |
Floor area | 117,000 m2 (1,259,377.52 sq ft) |
Lifts/elevators | 17 |
Design and construction | |
Architect | Philip H. Recto Architects |
Developer | Amberland Corporation |
References | |
[1][2][3] |
One Corporate Centre is an office skyscraper in Pasig, Metro Manila, Philippines. It is the 13th-tallest building in the country and Metro Manila as well with a height of 202 metres (662.73 feet) [3] from ground to tip of architectural antenna. The building has 45 floors above ground including 7 floors for commercial purposes, and 9 basement levels for parking.[4]
One Corporate Centre was designed by Philip H. Recto Architects, and is developed and owned by Amberland Corporation.
Location[]
The building is located at the corner of Meralco Avenue and Julia Vargas Avenue in the Ortigas Center of Pasig.
Tenants[]
- Alternatives Food Corp.
- BDO Pasig-Meralco Ave. Branch
- CPI Outsourcing
- EastWest Bank-Julia Vargas Ave. Branch
- Energy Development Corp.
- FEBC Philippines
- I3 Technologies Corp.
- IHI Philippines, Inc.
- Intertek Testing Services Philippines Inc
- KDCI Outsourcing
- MiraMeds Philippines Group, LLC
- NuWorks Interactive Labs
- One Cafe and Events Place
- One Tagaytay Place Vacation Club, Inc.
- Pilipinas Trade Gas, Inc.
- The OML Center
- The Wellex Group, Inc.
- Tsukiden Global Solutions, Inc.
Features and amenities[]
The building will have a gross leasable office space of 62,670 m2 (674,574.27 sq ft).[5]
Amenities inside the building include a Food Court, Executive Dining/Restaurants, Function Rooms with audio-visual facilities, Gallery overlooking Ground Floor lobby for art and other exhibits, Coffee shops, and a Fitness Center.
There will also be a 9 basement levels for parking with paging system, and a helipad at roofdeck.
14 high-speed elevators and 2 service elevators will service the entire building to the office floors and to the parking basements, respectively. There will also be 1 service elevator that will service all floors for other purposes.[4]
It is also serves as a radio transmitter of the FM radio station 98.7 DZFE, owned by Far East Broadcasting Company.
See also[]
- List of tallest buildings in the Philippines
References[]
- ^ Skyscraperpage.com One Corporate Centre
- ^ Council on Tall Buildings and Urban Habitat Tallest Building In The Philippines Database as of April 2008
- ^ a b Blu Print Magazine Volume 2 page 18
- ^ a b Amberland Website One Corporate Centre
- ^ Colliers International One Corporate Centre Archived 2012-02-20 at the Wayback Machine
- Skyscrapers in Ortigas Center
- Skyscraper office buildings in Metro Manila
- Office buildings completed in 2009