One Corporate Centre

From Wikipedia, the free encyclopedia
One Corporate Centre
General information
StatusCompleted
TypeOffice
LocationMeralco Avenue corner Julia Vargas Avenue, Ortigas Center, Pasig, Philippines
Coordinates14°35′1.54″N 121°3′48.13″E / 14.5837611°N 121.0633694°E / 14.5837611; 121.0633694Coordinates: 14°35′1.54″N 121°3′48.13″E / 14.5837611°N 121.0633694°E / 14.5837611; 121.0633694
Construction started2005
Opening2009
OwnerAmberland Corporation
Height
Antenna spire201.5 m (661.09 ft)
Roof185 m (606.96 ft)
Technical details
Floor count45 aboveground, 9 belowground
Floor area117,000 m2 (1,259,377.52 sq ft)
Lifts/elevators17
Design and construction
ArchitectPhilip H. Recto Architects
DeveloperAmberland Corporation
References
[1][2][3]

One Corporate Centre is an office skyscraper in Pasig, Metro Manila, Philippines. It is the 13th-tallest building in the country and Metro Manila as well with a height of 202 metres (662.73 feet) [3] from ground to tip of architectural antenna. The building has 45 floors above ground including 7 floors for commercial purposes, and 9 basement levels for parking.[4]

One Corporate Centre was designed by Philip H. Recto Architects, and is developed and owned by Amberland Corporation.

Location[]

The building is located at the corner of Meralco Avenue and Julia Vargas Avenue in the Ortigas Center of Pasig.

Tenants[]

  • Alternatives Food Corp.
  • BDO Pasig-Meralco Ave. Branch
  • CPI Outsourcing
  • EastWest Bank-Julia Vargas Ave. Branch
  • Energy Development Corp.
  • FEBC Philippines
  • I3 Technologies Corp.
  • IHI Philippines, Inc.
  • Intertek Testing Services Philippines Inc
  • KDCI Outsourcing
  • MiraMeds Philippines Group, LLC
  • NuWorks Interactive Labs
  • One Cafe and Events Place
  • One Tagaytay Place Vacation Club, Inc.
  • Pilipinas Trade Gas, Inc.
  • The OML Center
  • The Wellex Group, Inc.
  • Tsukiden Global Solutions, Inc.

Features and amenities[]

The building will have a gross leasable office space of 62,670 m2 (674,574.27 sq ft).[5]

Amenities inside the building include a Food Court, Executive Dining/Restaurants, Function Rooms with audio-visual facilities, Gallery overlooking Ground Floor lobby for art and other exhibits, Coffee shops, and a Fitness Center.

There will also be a 9 basement levels for parking with paging system, and a helipad at roofdeck.

14 high-speed elevators and 2 service elevators will service the entire building to the office floors and to the parking basements, respectively. There will also be 1 service elevator that will service all floors for other purposes.[4]

It is also serves as a radio transmitter of the FM radio station 98.7 DZFE, owned by Far East Broadcasting Company.

See also[]

  • List of tallest buildings in the Philippines

References[]

  1. ^ Skyscraperpage.com One Corporate Centre
  2. ^ Council on Tall Buildings and Urban Habitat Tallest Building In The Philippines Database as of April 2008
  3. ^ a b Blu Print Magazine Volume 2 page 18
  4. ^ a b Amberland Website One Corporate Centre
  5. ^ Colliers International One Corporate Centre Archived 2012-02-20 at the Wayback Machine
Retrieved from ""