Packards Corner station

From Wikipedia, the free encyclopedia
Packards Corner
Inbound train at Packards Corner station, August 2018.JPG
An inbound train at Packards Corner station in 2018
LocationCommonwealth Avenue at Brighton Avenue
Allston, Boston, Massachusetts
Coordinates42°21′7.51″N 71°7′29″W / 42.3520861°N 71.12472°W / 42.3520861; -71.12472Coordinates: 42°21′7.51″N 71°7′29″W / 42.3520861°N 71.12472°W / 42.3520861; -71.12472
Platforms2 side platforms
Tracks2
ConnectionsBus transport MBTA bus: 57, 57A, 193
Passengers
20112,654 (weekday average boardings)[1]
Services
Preceding station MBTA.svg MBTA Following station
Harvard Avenue Green Line Babcock Street
Former services
Preceding station MBTA.svg MBTA Following station
Fordham Road
(station closed 2004)
Green Line Babcock Street
Union Square
toward Watertown
Green Line
(closed 1969)
Alcorn Street

Packards Corner station (announced as Brighton Avenue/Packards Corner) is a light rail stop on the MBTA's Green Line B branch located at Packard's Corner - the intersection of Commonwealth Avenue and Brighton Avenue - in Allston, Boston, Massachusetts. The station is located in a median between the westbound travel lanes and frontage road of Commonwealth Avenue.

History[]

The Green Line A branch formerly diverged just north of the platforms; its trolleys stopped at separate Packards Corner platforms on Brighton Avenue. The Brighton Avenue streetcar reservation was removed from July 1 to October 5, 1949, and the side platforms for the Watertown Line were replaced with an island platform.[2] The A branch was closed on June 21, 1969 and replaced with the route 57 bus, though the trackage was retained for non-revenue moves to Watertown Yard.[3] The line was finally abandoned in 1994; a several-hundred-foot stub track was left until the mid-2000s to temporarily store disabled trains. The switch and the last few feet of track were not disconnected until track work in 2014.

Packards Corner was not made accessible during the initial 2001–03 round of Green Line station renovations. In 2019, the MBTA listed Packards Corner as a "Tier I" accessibility priority.[4] Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. As of May 2021, the MBTA expects construction at Packards Corner and four other B Branch stops to begin in 2023–24.[5]

References[]

  1. ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. ^ Clarke, Bradley H. (2003). Streetcar Lines of the Hub - The 1940s. Boston Street Railway Association. p. 110. ISBN 0938315056.
  3. ^ Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  4. ^ "Preview of 2019 Recommendations: Presentation to the FMCB" (PDF). Plan for Accessible Transit Infrastructure (PATI). Massachusetts Bay Transportation Authority. April 1, 2019. p. 12.
  5. ^ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. p. 4.

External links[]

Media related to Packards Corner station at Wikimedia Commons

Retrieved from ""