Padua–Bologna railway

From Wikipedia, the free encyclopedia
Padua–Bologna railway
Stanghella train station (7).jpg
Stanghella station
Overview
Native nameFerrovia Padova-Bologna
StatusOperational
OwnerRFI
Line number58, 86
LocaleItaly
TerminiPadua
Bologna
Service
TypeHeavy rail
Operator(s)Trenitalia
History
Opened1862–6
Technical
Line length123 km (76 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification3000 V DC
Route map

Legend
km
elev
122.921
Padua
to and Calalzo
119.920
(1911–1952)
113.254
109.927
Abano-Montegrotto
105.700
100.119
Monselice
92.226
85.908
79.192
Rovigo
Left arrow / Right arrow
70.872
65.595
58.722
53.680
53.334
[nb 1]
51.981
Po,
Veneto
Emilia-Romagna
regional border
deviation opened in 1945
(x.xxx) 50.293
(closed 1956)
46.830
Ferrara
Po di Volano
Left arrow
Right arrow and
39.653
33.879
31.765
29.191
23.879
17.768
11.830
(opened 2003)
9.947
6.990
Bologna Corticella
3.380
Battiferro junction
()
(5.557) 5.469
Navile junction
opened in 2017
Left arrowLeft arrowformer Agucchi junction / Left arrowformer Battiferro
junction (former link to Bologna Ravone)
Marconi Express (opened 2020)
(0.000) 1.991
Venezia junction
from Milan (HS) (opened 2017)
1.115
Lame underpass (from Porretta,
Vignola, Milan and Verona)
0.000
Bologna Centrale
Left arrowLeft arrowsurface
Left arrowunderground
to Left arrowLeft arrowFlorence (old) and Ancona
Left arrowto Florence (HS)
km
Source: Italian railway atlas[1]

The Padua–Bologna railway is an important railway line in Italy that joins the city of Padua to Bologna, passing through Rovigo and Ferrara. The infrastructure is managed by RFI, which classifies it as a primary line.[2]

History[]

Section Opened[3]
BolognaFerrara 26 January 1862
Ferrara–Pontelagoscuro 15 April 1862
PaduaRovigo 11 June 1866
Rovigo–Pontelagoscuro 1 December 1866

The railway was designed as a continuation of the Porrettana Railway towards the Po Valley and Venice.

The first section from Ferrara to Bologna was opened on January 1862, while Pontelagoscuro was reached on 15 April of the same year.

The Padua–Rovigo section, which at that time was in the Veneto region and part of the Austrian Empire, was opened on 11 June 1866, a few days before the opening of hostilities in the Third War of Independence. The missing section, from Pontelagoscuro to Rovigo, was built as a matter of urgency during the war. Civil operations started on 1 December 1866,[3] when the war had ended and the Veneto had become part of the Kingdom of Italy. The whole line was managed by the Società per le Ferrovie dell'Alta Italia (SFAI) until the establishment of the Rete Adriatica in 1885. The line has been part of the FS network since 1905, while management was transferred to RFI in 2001. On 22 December 1985, a rail crash occurred at Coronella (a village in Poggio Renatico), which caused 10 deaths and injuries to another 11. The line has been completely doubled and electrified since 2006 with the completion of the doubling of the Pontelagoscuro–Occhiobello section.

Track standards[]

The line is equipped with double track, 1,435 mm (4 ft 8+12 in) standard gauge and electrified at 3000 V DC.

References[]

Note[]

  1. ^ Change of chainage due to deviation

Footnotes[]

  1. ^ Railway Atlas 2017, pp. 25, 36–7, 48, 138, 144.
  2. ^ "Rete in esercizio" (PDF) (in Italian). RFI. Archived from the original (PDF) on 21 February 2020. Retrieved 30 July 2020.
  3. ^ a b Prospetto cronologico 1926.

Sources[]

  • RFI, ed. (December 2003). Fascicolo Linea 58 (in Italian). Rete Ferroviaria Italiana.
  • RFI, ed. (December 2003). Fascicolo Linea 86 (in Italian). Rete Ferroviaria Italiana.
  • Tuzza, Alessandro, ed. (1927). "Prospetto cronologico dei tratti di ferrovia aperti all'esercizio dal 1839 al 31 dicembre 1926" (in Italian). Ufficio Centrale di Statistica delle Ferrovie dello Stato/Trenidicarta.it. Retrieved 6 September 2020.
  • Atlante ferroviario d'Italia e Slovenia [Railway atlas of Italy and Slovenia]. Schweers + Wall. 2010. ISBN 978-3-89494-129-1.}
Retrieved from ""