Rawalpindi-Islamabad Metrobus

From Wikipedia, the free encyclopedia

Rawalpindi-Islamabad Metrobus
Punjab Metrobus Authority Logo.png
The Red Metro Bus in Blue Area.jpg
Overview
SystemRawalpindi-Islamabad Metrobus
OperatorPunjab Mass Transit Authority
Vehicles68
Began service4 June 2015; 6 years ago (2015-06-04)
Route
Route typeBus Rapid Transit
LocaleIslamabad-Rawalpindi metropolitan area
Stops38

Line 1 Rawalpindi Islamabad Metrobus.png SaddarPak Secretariat

Line 2 Rawalpindi Islamabad Metrobus.png Peshawar MorrAirport
Service
Ridership100,558[1]
Route map
← {{{previous_line}}}  {{{system_nav}}}  {{{next_line}}} →

The Rawalpindi-Islamabad Metrobus is a 22.5 km (14.0 mi) bus rapid transit system operating in the Islamabad-Rawalpindi metropolitan area of Pakistan. The Metrobus network's first phase was opened on 4 June 2015, and stretches 22 kilometres between Pak Secretariat, in Islamabad, and Saddar in Rawalpindi. The second stage is currently under construction, and stretched 25.6 kilometres between the Peshawar Morr Interchange and New Islamabad International Airport.[2] The extension will add 9 bus stations that include NHA Station, G-10 Station, NUST Station, G-1 Station, G T Road Station, Badana KalanStation, Peshawar-Islamabad Motorway and Islamabad-Lahore Motorway Junction Station and Airport Station.[3] The system uses e-ticketing and an Intelligent Transportation System, and is managed by the Punjab Mass Transit Authority.

Construction[]

Construction of the bus rapid transit system began on 28 February 2014 and was completed by June 2015, with 60 buses initially plying on the route. The Rawalpindi Development Authority was tasked with overlooking the project with a cost of approximately 44.31 billion (US$280 million), which was between the federal government and the Punjab provincial government.[4] The initial date of inauguration was set for 28 February 2015, but was delayed work in construction of drainage channels. Ex-Prime Minister Nawaz Sharif inaugurated Metrobus on 4 June 2015. Even after the service launch of the metro bus service, the issues regarding the drainage of rainwater still remained unfinished resulting in the inundation of the underground bus stations during monsoon rains. However, rainfall in the area was above normal throughout the year resulting in greater delay during construction. The project was initially divided into five packages, where Package-1 consisted of flyovers, bridges and pedestrian underpasses. The project was started on 23 April 2014 and was completed on 27 March 2015 incurring a total cost of 33.5 billion (US$210 million) as quoted by the contractor of the project. The construction project was awarded to Habib Construction Services which is one of the largest construction companies of Pakistan and have worked on several other mega projects previously.

Lines[]

Station of Islamabad-Rawalpindi Metrobus in Blue Area (Pak Secretariat-Saddar line).
Station of Islamabad-Rawalpindi Metrobus in Peshawar Morr-Airport line along the Srinagar Highway.
Line Length Opening year Route Number of stations Journey time (end to end) Notes
Line 1 Rawalpindi Islamabad Metrobus.png 22.5 km (14.0 mi) 2015 Pak Secretariat-Saddar 24 Every 4–8 minutes during daytime hours (06:00-20:00) [5]
Line 2 Rawalpindi Islamabad Metrobus.png 25.6 km (15.9 mi) 2020 Peshawar Morr-Airport 14

Ticketing and fares[]

The system uses e-ticketing and Intelligent Transportation System wand. The system is managed by the Punjab Metrobus Authority (PMBA) with the IT part is being carried out in coordination with Punjab IT Board. Functional elements at the stations include ticketing booths, concourse level passenger transfer, escalators, platform screen. toliterities, doors turnstiles for automatic fare collection and all other amenities for passenger convenience. A central ITS control room is also included in the project to control the whole operation of the Metro Bus system.

Fleet[]

The current fleet consists of 68 articulated 18-meter-long high-floor buses. These buses were imported and supplied by VPL Limited from the China-based company Sunwin Bus, which is a Joint-Venture formed between SAIC Motor Corporation Limited (SAIC) and Sweden-based Volvo Bus Company, VPL Limited also happens to be the sole after-sales distributor for both Volvo Buses and Sunwin Buses in Pakistan, among other products.

Controversies and Mishaps[]

The rainy season of 2015 exposed significant problems in drainage systems of the network. One of the worst affected stations was the Centaurus metro bus station, with severe flooding affecting smooth operation severely.[6] Similarly, cracks appeared after a minor earthquake in Rawalpindi, which raised questions over the structural integrity of the infrastructure used in the project.[7] The long-term financial model to run the project and its utilization is a subject of serious controversy surrounding the project. Reports show that although 150,000 passengers were expected, the project was unable to produce over 80,000 passengers in the long run. It became extremely difficult for management to afford fuel costs for 68 buses, and only 35 buses were utilized. This resulted in jamming and overcrowding during peak travelling hours.[8]

Another serious controversy surrounding project is its annual loss. According to official numbers, a single bus trip costs 9,100 PKR, while it earns only 2,600 PKR. This incurs a loss of 6,500 PKR each trip. The huge subsidy contributes to a 2 billion PKR loss every year, however raising the cost of tickets may result in total loss of already dropping passengers.[9] After heavy loans accumulated on the Punjab government in paying subsidies, it was decided in 2016 to divide the load between the Punjabi government and Capital Development Authority (CDA) on the basis of length in Rawalpindi and Islamabad.[10] However, CDA refused to pay for losses of Metro bus attributing to lack of funds in 2016. Federal government provided funds to CDA to shoulder the burden of Punjab Metro authority in 2016. However, in 2017 the problem surfaced again, raising question marks on long term losses and the financial burden of this under utilized project.[11]

Scams and Corruption probe[]

The earlier audit report revealed massive corruption Rs. 5 billion for unnecessary construction material used in the project.[12][13] Besides transparency international raised serious question marks on practices followed during construction of the project, award of contracts, and use of material.[14] In detailed report latter auditor general of Pakistan unveiled use of poor quality of concrete and steel causing corruption of further Rs 280.2 million[15] services cost before the project was even launched, project completion in 20 months instead of 9 and peculiar payments made to illegal occupants while acquiring lands.[13] Several unjustified payments noticed during the project even moved transparency international, questioning extraordinary payments and violation of rules and regulations.[16] All these controversies moved NAB to investigate project discrepancies, including electric stairs installation,[17] violation of procedures in pre-qualification,[18] tendering and award of contracts, NAB took records for proper probe from RDA[19]

See also[]

External links[]

References[]

  1. ^ Hussain, Danish. "Punjab went 'halfsies' on cost, but not on revenue". The Express Tribune. Retrieved 18 April 2016.
  2. ^ "Metro Bus extension: NHA assures timely completion - The Express Tribune". The Express Tribune. 16 November 2017. Retrieved 6 March 2018.
  3. ^ "Metro Bus extension: NHA assures timely completion". The Express Tribune. 15 November 2017. Retrieved 31 March 2021.
  4. ^ "Shahbaz to inaugurate work on Metro Bus Service on Feb 28"
  5. ^ Metro bus project: Capital's civic managers cave in to pressure from Punjab govt
  6. ^ "Rawalpindi-Islamabad metro bus project not waterproof". The Dawn. 8 July 2015.
  7. ^ "Engineers to assess damage to metro track". The Dawn. 27 October 2015.
  8. ^ "Half of metro bus fleet unutilised in twin cities". The Dawn. 7 January 2016.
  9. ^ "Economically unviable: Metro Bus - a white elephant painted red". The Express Tribune. 29 June 2015.
  10. ^ "CDA to share 60pc of metro bus subsidy". The Dawn. 3 October 2016.
  11. ^ "CDA unable to shoulder burden of Metro Bus in long term with Punjab". The Times of Isalamabad. 21 March 2017.
  12. ^ "Audit report exposes alleged corruption of Rs5 bn in Islamabad metro bus project". Pakistan: Such TV. 6 March 2018. Retrieved 14 September 2018.
  13. ^ a b "Audit report exposes alleged corruption of Rs5 bn in Islamabad Metro Bus Project". Pakistan Observer. 6 March 2018. Retrieved 14 September 2018.
  14. ^ Transparency international questioned Rawalpindi metro.
  15. ^ Audit report revealed corruption of 280.2 million Rs.: Substandard use of material.
  16. ^ Unusual payments and contracts under question.
  17. ^ NAB to investigate Rawalpindi metro: Question raised on purchase of low quality material.
  18. ^ Pre qualification and contract award questioned: NAB probes violation of rules in purchase of material and award of contracts.
  19. ^ NAB takes record of RWP metro from RDA: Use to low quality materials, and violation in award of contracts
Retrieved from ""