Southern Punjab Railway
Industry | Railways |
---|---|
Founded | 1895 |
Defunct | 1930 |
Headquarters | Bathinda , |
Area served | Malerkotla State, Jind State, Patiala State & Nabha State |
Services | Rail transport |
The Southern Punjab Railway (SPR) was a 1,676 mm (5 ft 6 in) broad-gauge railway built to provide a more direct connection from Karachi to Delhi by linking to the original Indus Valley State Railway at Samasata and avoiding the North Western Railway loop via Lahore.[citation needed]
History[]
The Southern Punjab Railway Company was formed in 1895 with Bradford Leslie as Chairman. Under contract with the Secretary of State for India, Leslie and his partners formed the company to build a BG railway from Delhi to Samasata about 400 miles to the west. Horace Bell was the consulting engineer for SPR in London for the construction.
The main line ran northwest from Delhi to Bathinda then southwest through Bahawalpur State to Samasata, a total distance of 402 miles (643 km). Several extension lines (Jullunder, Sutlej Valley etc.) extended the length to 502 miles(803 km) in 1905. In 1873, metre-gauge Delhi–Rewari line from the Delhi–Rewari section of Rajputana–Malwa Railway was extended to Hisar,[1] and then to Bhatinda in 1883–84, connecting it all the way to Karachi via Delhi–Karachi line.[2][3]
The railway was worked by the North Western State (NWR) Railway (see "Records L/AG/46/34"). The railway eventually became part of Indian Railways.
Network[]
The listings below are generally based on the "Administration Report on Railways 1918"[4] with page numbers (and pdf pages) noted at the end of each entry.
Mainline and branches BG Total line length 426 miles (685 km). Page 121 (pdf 130)
- Delhi–Samasata main line, Delhi via Narwana, Jakhal, Bathinda to Samasata, opened 1897, 399 miles (642 km)
Jullundur–Doab Extension Railway BG Total line length 130 miles (209 km). Page 123 (pdf132)
- Jullunder–Ferozepore Mainline, Jullunder via Karpurthala, Sultanpur Lodi, Lohian Khas, Gidarpind, Makhu to Ferozepore Cantonment, opened 1912–14, 73 miles (117 km)
Ludhiana Extension Railway BG Total line length 152 miles (244 km). Page 123(pdf132)
- Ludhiana-Ferozepore line, Ludhiana to Ferozepore, opened 1905, 77 miles (124 km)
- Ferozepore–MacLeod Ganj line, Ferozepore to McLeod Ganj (a suburb of Dharamsala), opened 1906, 75 miles (120 km)
Sutlej Valley Extension Railway BG Total line length 208 miles (335 km). Pages 124-5 (pdf135-6)
- Kasur-Lodhran Railway, Kasur to Lodhran, opened 1910, closed and dismantled 1917–18, 208 miles (335 km)
Ludhiana–Dhuri–Jakhal Railway BG Total line length 79 miles (127 km). Page 115 (pdf124)
- Ludhiana via Dhuri to Jakhal, opened 1901. Managed, maintained and worked by North Western Railway (NWR) under an Agreement with the Princely Maler Kotla State Durbar and the Jhind State Durbars. The line was used by SPR linking the Delhi–Samasata Mainline at Jakhal with 'Ludhiana Extension Railway' at Ludhiana.[5]
References[]
- ^ Haryana Gazetteers Organization (1987). "Gazetteer of India: Haryana, Hisar, pp.127–128" (PDF). Chandigarh: Controller of Printing and Stationery. Archived from the original (PDF) on 1 May 2014.
- ^ "Gazetteer of India, Haryana, Hisar" (PDF). Haryana Government. Communications, page 135. Archived from the original (PDF) on 1 May 2014. Retrieved 10 May 2014.
- ^ "Rajputana Malwa State Railway". fibis. Retrieved 10 May 2014.[unreliable source?]
- ^ "Administration Report on Railways 1918" pages 120–126 (pdf 129–134); Retrieved 18 Dec 2016
- ^ "British Library Archives and Manuscripts Catalogue" - Search; Retrieved Jan 2016
External links[]
- Transport in Bathinda
- Defunct railway companies of India
- Rail transport in Punjab, India
- History of Punjab, India