This article has multiple issues. Please help or discuss these issues on the talk page. (Learn how and when to remove these template messages)
This article needs additional citations for verification. Please help by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: – ···scholar·JSTOR(January 2011) (Learn how and when to remove this template message)
This article may require cleanup to meet Wikipedia's quality standards. No cleanup reason has been specified. Please help if you can.(January 2011) (Learn how and when to remove this template message)
This article needs to be updated. Please help update this article to reflect recent events or newly available information.(December 2018)
(Learn how and when to remove this template message)
Dam in East of Pailin District, Battambang Province, Cambodia
The Stung Battambang 1 (or Battambang 1) is a dam planned for construction on the Battambang River in Cambodia. The river is a major tributary of the Tonlé Sap. Of the two dams planned for this river, the larger is the Stung Battambang 1. A letter of commitment has been issued by the Cambodian authorities for a pre-feasibility study of the dam by an unknown Korean company[1]
Surrounding the dam site is the Bannan Irrigation project, covering some 20,000 hectares (49,000 acres), and the dam is understood to play a role in the irrigation of this area, as well as generating hydropower.[2] There is little data available about reservoir size or number of people who will be displaced. The dam is one of three possible dams in the Battambang River basin; the other two would block two tributaries to the Battambang River: the Mongkol Borey River and the Sangker River.