Tabriz–Urmia Freeway

From Wikipedia, the free encyclopedia
Freeway in Iran.svgIRN-Fwy 16.svg
IRN-EN-Fwy 16.svg
Freeway 16
16 آزادراه
Tabriz–Urmia Freeway
آزادراه تبریز-ارومیه
Tabriz–Urmia
Length118 km (73 mi)
FromUrmia, West Azerbaijan
AB-Kreuz-blaugrün.svg Expressway in Iran.svg
Street in Iran.svg Abuzr Street
Major intersections Road 21 near Khaseban, East Azerbaijan
FromNear Sahand, East Azerbaijan
AB-Kreuz-blau.svgAzadrah16-IR.png Tabriz–Sahand Freeway
Tabriz–Sahand Freeway
Length19 km (12 mi)
FromSahand Phase 3, East Azerbaijan
Major intersectionsAzadrah16-IR.png Tabriz–Urmia Freeway towards Urmia
Avenue in Iran.svg Tashayyo' Blvd., Shahrak-e Andisheh
FromTabriz, East Azerbaijan
AB-Kreuz-blau.svgAzadrah2-IR.pngIran First Level Road 16.pngRoad32.png Tabriz Southern Bypass Freeway
Tabriz Second Southern Bypass Freeway
Length30 km (19 mi)
FromTabriz, East Azerbaijan
AB-Kreuz-blau.svgAzadrah2-IR.pngIran First Level Road 16.pngRoad21.pngRoad32.png Tabriz Western and Southern Bypass Freeway
Major intersectionsAzadrah16-IR.png Tabriz–Sahand Freeway
Azadrah2-IR.png Tabriz–Zanjan Freeway
FromNear Basmenj, East Azerbaijan
AB-Kreuz-blaugrün.svgIran First Level Road 14.pngIran First Level Road 16.pngIran First Level Road 27.pngRoad32.png Tabriz–Tehran Exp'way - Tabriz–Ahar Exp'way
Location
ProvincesEast Azerbaijan, West Azerbaijan
Major citiesUrmia, West Azerbaijan
Osku, East Azerbaijan
Sahand, East Azerbaijan
Tabriz, East Azerbaijan
Basmenj, East Azerbaijan
Highway system
Highways in Iran
Freeways

Tabriz–Urmia Freeway (Persian: آزادراه تبریز-ارومیه) is a partially built freeway project in Northwestern Iran, East Azerbaijan and West Azerbaijan provinces, connecting the two cities of Tabriz and Urmia. It serves as a major link, with the bridge over Urmia Lake, connecting Urmia to the rest of the country via Tabriz and Freeway 2. The project consists of several segments.

Segment 1 connects the city of Urmia to the western shore of Urmia Lake. Segment 2 is the causeway and bridge over the lake. These two segment opened to traffic on 2017. Segment 3 is a segment through the mountainous Islami Island. This segment consists of a 2 km long twin tunnel, and is currently under construction. Segment 4 runs from the start of the swampy territory to the east of Islami Island, running mostly on an embankment, towards Tabriz–Maragheh Expressway. This segment opened to traffic on August 2019. Segment 5 connects the end of Segment 4 at Khaseban to Sahand, connecting to the Tabriz–Sahand Freeway Segment.

Tabriz–Sahand Freeway segment started several years before the finalization of the plans on how the end of Segment 4 will connect to the city of Tabriz, and initially it was not supposed to be part of the Freeway, as the freeway was planned to run on the west of the existing Tabriz–Maragheh Expressway to Tabriz Western Bypass Freeway. However, now this segment will constitute the last stretch of Freeway connecting the two cities.

Segment 6, also functioning as Tabriz Second Southern Bypass Freeway, planned to take over the function of Tabriz Southern Bypass Freeway will run from west to east. Its construction started on the Summer of 2019. It will also serve as a connector from Urmia towards Tehran, bypassing the city of Tabriz

Tabriz–Urmia Freeway[]

Pfeil unten.svg From West to East Pfeil unten.svg
Pfeil oben.svg From East to West Pfeil oben.svg

Tabriz–Sahand Freeway[]

Pfeil unten.svg From South to NorthPfeil unten.svg
Pfeil oben.svg From North to South Pfeil oben.svg

Tabriz Second Southern Bypass Freeway[]

Pfeil unten.svg From West to East Pfeil unten.svg
Pfeil oben.svg From East to West Pfeil oben.svg
Retrieved from ""