The Tiwai Point Aluminium Smelter is an aluminium smelter owned by Rio Tinto Group (79.36%) and the Sumitomo Group (20.64%),[1] via a joint venture called New Zealand Aluminium Smelters (NZAS) Limited.[2]

The facility, New Zealand's only aluminium smelter,[3] is at Tiwai Point, near Bluff. It imports alumina and processes it into primary aluminium. The plant's alumina is supplied from refineries in Queensland and the Northern Territory of Australia. Around 90 per cent of the aluminium produced at NZAS is exported, mainly to Japan.[4]

The smelter was opened in 1971[2] following the construction of the Manapouri Power Station by the New Zealand government to supply it with electricity. It uses 13 percent of New Zealand's electricity,[5][6] and is reported to account for 10 percent of the Southland region's economy.[7]

On 9 July 2020, Rio Tinto announced that the smelter would close in August 2021.[8][9][10][11] In mid January 2021, Rio Tinto announced that it had reached an agreement with Meridian Energy to keep the smelter running until December 2024.[12][13]

There are concerns regarding the environmental legacy of waste stockpiled at the site, near to an eroding beachline.[14]

History[]

In 1955, a geologist working for Consolidated Zinc Proprietary Ltd (ConZinc) identified a commercial deposit of bauxite in Australia on the west coast of Cape York Peninsula. The company investigated sources of large quantities of cheap electricity needed to reduce the alumina recovered from the bauxite into aluminium. In 1960, ConZinc reached an agreement with the government for it to build a smelter and power station using the hydroelectric capacity of Lake Manapouri and Lake Te Anau. In 1963, ConZinc decided not to build the power station, and following that decision the government decided to construct it, with power first being generated in 1969. Construction of the Manapouri Power Station attracted controversy for its environmental effects, with over 264,000 New Zealanders signing the Save Manapouri petition. With a supply of electricity to be available, ConZinc built the Tiwai Point smelter, opening in 1971.[2] The original ownership was 50% Comalco, 25% Sumitomo Chemical Company and 25% Showa Denko KK.[15]

Tiwai Point is the only aluminium smelter in New Zealand. In December 1980, the government announced a project that would build a second smelter at Aramoana, but opposition from the public, changes in the aluminium market, and the loss of a commercial partner meant the project did not go ahead.[2]

Operations[]

The smelter uses the Hall–Héroult process to convert alumina (aluminium oxide) to elemental aluminium. Bauxite is mined in Australia and refined into alumina before being shipped to New Zealand.[16] The smelter consists of three lines of P69 technology cells, with 208 cells each (i.e. 624 total), and one line of 48 CD200 technology cells. The third P69 Line was built in the early 1980s as part of the Muldoon government's "Think Big" projects.

The smelter produces the world's purest aluminium[2] – 99.98 percent pure[17] – and is one of two smelters in the world producing ultrahigh purity aluminium.[18] In 2011 the smelter produced 354,030 saleable tonnes of aluminium, which was its highest ever output at the time.[19] In 2015, it produced 335,290 tonnes.[20]

Financial results[]

Taken from the Statistical Review of Comalco's New Zealand Activities, page 22 of the 1993 Annual Report.

Year   Tonnes   Aluminium Price  Net Profit    Employees
1979  153,537    1575             -1,172,000     1,252  
1980  154,740    1770             17,470,000     1,258  
1981  153,979    1302              2,941,000     1,359  
1982  163,419    1026            -20,698,000     1,452  
1983  218,609    1478             -9,665,000     1,651  
1984  242,850    1281              1,766,000     1,631  
1985  240,835    1072            -24,772,000     1,529  
1986  236,332    1160            -18,188,000     1,506  
1987  248,365    1496             92,570,000     1,429  
1988  257,006    2367            173,040,000     1,770  
1989  258,359    1915            118,500,000     1,820  
1990  259,408    1635             42,051,000     1,720  
1991  258,790    1333            -34,122,000     1,465  
1992  241,775    1279            -18,649,000     1,415  
1993  267,200    1161            -18,016,000     1,465  

The smelter production is in tonnes of saleable metal, the aluminium price is the average London Metal Exchange 3 month in US$/tonne, the Nett Profit/Loss is after tax and NZ$. The employee count includes contract employees and the full-time equivalent of part-time employees. Comalco-CHH Aluminium employees are not included from 1990; 425 were employed in 1993.

Electricity use[]

The smelter's power demand from the national grid is about 570 MW. Most of the energy for the smelter is supplied from the Manapouri hydroelectric power station, via two double circuit 220 kV transmission lines. The facility is the largest electricity consumer in New Zealand, and uses approximately one third of the total electricity consumed in the South Island and 13% of the total electricity nationwide, equivalent to about 680,000 households.[5]

Electricity usage since 1970
Electricity usage since 2000

New Zealand Aluminium Smelters has a contract for electricity supply with Meridian Energy for the continuous supply of 572 megawatts for the period 2013 to 2030.[21] A variation of this agreement was signed in 2015.[5]

Environmental effects[]

Aluminium smelting via the Hall–Héroult process produces carbon dioxide as a by-product. The basic reaction is Al2O3 → 2Al + 3"O". Oxygen equivalents react at the red-hot carbon anode, forming a mixture of carbon monoxide (that subsequently becomes carbon dioxide) and carbon dioxide. For one tonne of aluminium, 1.55 tonnes of CO result, becoming 2.4 tonnes of CO2. However, if all the oxygen were instead directly converted to CO2, then only 1.56 tonnes of CO2 would result. At the stated rate of 1.97 tonnes of carbon dioxide per tonne of aluminium, the production of 272,000 tonnes of aluminium in a year would emit 535,000 tonnes of carbon dioxide. In 2007, Tom Campbell, the chief executive of majority owner Rio Tinto Aluminium NZ, said that the smelter was among the top 5% of the world's 250 aluminium smelters in terms of low emissions.[21] Metal produced by Tiwai Point is marketed under the RenewAl brand, which according to NZAS guarantees that less than four tonnes of CO2 is emitted for every tonne of aluminium produced.[22]

Significant amounts of hazardous waste have been stored at the site, mainly spent cell liner (also known spent pot lining) containing compounds including fluoride and cyanide. Estimates of the waste stockpiled at the site range up to a quarter of million tonnes.[14] It has been described as uncontrolled, unconsented and untreated in complete absence of any regulatory oversight or recognition, being the largest stockpile of hazardous waste in Australasia and posing an estimated $NZ300 million liability.[23] Rio Tinto has committed $NZ4 million towards the removal of all aluminium dross and ouvea premix. [24]

Economic effects and threats of closure[]

NZAS reports that the facility employs 800 full-time employees and contractors and indirectly creates jobs for 3,000 people.[20] The smelter is reported to account for 10 percent of the Southland region's economy.[7]

Tiwai Point has frequently operated at a loss, such as in 2012 when it lost $548 million.[25] Analysts have commented that the profitability of the smelter is most dependent on prices for electricity, alumina and the finished aluminium as well as the New Zealand dollar.[6][26] Between 2008 and 2013, aluminium prices fell by more than 30 percent.[27] Rio Tinto threatened to close the Tiwai Point smelter if it could not get a cheaper deal for electricity from retailer Meridian, or the Government failed to give it a substantial subsidy to cover losses.[28]

In 2013, Rio Tinto threatened to shut down the loss-making Tiwai Point smelter, unless it was able to continue re-negotiating favourable electricity prices with Meridian Energy.[29] Meridian is one of several state-owned enterprises which was proposed for a partial float on the sharemarket by the John Key National Government. The government wanted to get the maximum possible sale price, which would potentially conflict with Rio Tinto's desire for low electricity prices. As a result, the Government announced it would subsidise Rio Tinto to keep the Tiwai Point smelter operating in the short term,[30][31] garnering criticism from business commentators and opposition politicians.[32] However, on 2 April 2013, John Key said Rio Tinto had rejected the Government's offer, preferring a "longer-term deal than the Government was prepared to offer".[33][34] John Key stated that if the smelter can't sustain itself financially, the government wasn't interested in keeping it open long-term.[35]

Much media commentary[36] in April 2013 focused on the impact of closure on both domestic power prices and share prices when the State Owned Enterprise and electricity generator Mighty River Power would be partially sold off to private investors. NZAS produced a report which claimed that if the smelter closed, there would be a permanent loss to Southland's GDP of about 7-8 percent and that 2-3 percent of Southland's population could move out of the region.[17] Invercargill mayor Tim Shadbolt said it was a myth that closing the smelter would result in lower prices, and vowed to keep it open.[37]

In August 2013, the New Zealand government agreed to make a $30 million payment to NZAS as a deal to support the smelter and to save jobs, exchange for agreeing the smelter cannot be closed before January 2017.[38] Finance Minister Bill English said the Government would make no further contribution to support it,[38] which he reiterated in 2015 following speculation that Rio Tinto was seeking to sell the smelter.[25]

In 2016, an analyst First New Zealand Capital (FCNZ) utilities said that the smelter was thought to be breaking even, and that favourable currency rates and low alumina prices were helping matters.[6]

In October 2019, Rio Tinto announced that it was undertaking a strategic review of the Tiwai Point Aluminium Smelter, including a wide range of issues associated with closure. The NZAS chief executive Stew Hamilton said that they had been losing money for the last 12 months, and that options ranged from operating at the status quo, which would require cheaper power, to closure of the plant. [39]

During New Zealand's lockdown for the Covid-19 pandemic, the smelter was deemed an essential service and exempt from restrictions.[40]

On 31 March 2020, Rio Tinto announced that it would close potline four, to ensure it can cope with the restrictions at the plant that are needed because of the coronavirus pandemic. Potline 4 originally opened in 1996 but was turned off for six years between 2012 and 2018 before reopening as a result of an uptick in aluminium prices and a new deal with power supplier Meridian. Potline four is smaller than the smelter's other three potlines, producing about 31,000 tonnes of aluminium a year, or about 9 per cent of the smelter's total output, and consumes about 50 MW of electricity.[41]

Planned closure and extension[]

On 9 July 2020, Rio Tinto announced that the smelter would close. The company said that it would wind down operations and end New Zealand Aluminium Smelters Limited after a strategic review that "showed the business is no longer viable given high energy costs and a challenging outlook for the aluminium industry". The company stated that 1000 jobs would be directly lost from the closure, and 1600 jobs indirectly connected to the smelter would also be under threat. The decision followed a 25% decrease in aluminium prices over the prior 18 months, and increasing power costs.[8] Rio Tinto intended to close the smelter in August 2021.[11]

The smelter featured in the 2020 general election, with many parties pledging to keep – or try to keep – the smelter running for at least some time. The National Party announced that, if it won the election, it would keep the smelter running for at least five years[42] and would facilitate negotiations between Rio Tinto, power companies and Transpower to achieve a more cost-competitive environment.[43] New Zealand First leader Winston Peters said that keeping the smelter open would be a bottom line in any coalition negotiations, and that he had a 20-year plan for the smelter.[44][45] The Government ruled out any further bailouts of the company.[46] Prime Minister and Labour leader Jacinda Ardern initially said that a Government project to widen the Homer Tunnel would provide some local jobs, but that no one industry could offset the job losses.[47] Later, Labour announced that it would negotiate to extend the life of the smelter by three to five years if elected, seeking to protect jobs in the short term to provide time for the community to consider alternative options.[48] Gore District Mayor Tracy Hicks has been lobbying the Government preserve the smelter in some way.[11]

On 14 January, Rio Tinto reached an agreement with Meridian Energy that allowed New Zealand's Aluminium Smelter (NZAS) to continue operating the Tiwai Point Aluminium Smelter until December 2024. This announcement provided relief to the plant's employees, Southland community, customers, and stakeholders.[12][13]

References[]

  1. ^ "Aluminium". riotinto.com. Retrieved 2017-01-12.
  2. ^ a b c d e Cook, Megan (11 March 2010). "Pulp and paper, aluminium and steel industries – 3. Aluminium". teara.govt.nz. Retrieved 2017-01-12.
  3. ^ Grant, David. "Aluminium smelter, Tīwai Point". teara.govt.nz. Te Ara - The Encyclopedia of New Zealand. Retrieved 2017-01-12.
  4. ^ "New Zealand Aluminium Smelters Limited". Rio Tinto Alcan. 2011. Retrieved 25 August 2011.
  5. ^ a b c Devlin, Collette; McCarthy, Phil (3 August 2015). "Tiwai Smelter deal signed between Meridian Energy and NZAS". stuff.co.nz. Retrieved 2017-01-13.
  6. ^ a b c Woolf, Amber-Leigh (24 January 2016). "Tiwai Point aluminium smelter has "reassuring start" to 2016 as New Zealand dollar and alumina prices fall". stuff.co.nz. Retrieved 2017-01-13.
  7. ^ a b "Tim Shadbolt vows to save smelter". newshub.co.nz. 4 April 2013. Retrieved 2017-01-12.
  8. ^ a b Foxcroft, Debrin; Stevenson, Rebecca (9 July 2020). "Tiwai Point aluminium smelter to close, 1000 jobs to go". Stuff. Retrieved 9 July 2020.
  9. ^ Rutherford, Hamish (9 July 2020). "Rio Tinto announces plans to close New Zealand aluminium smelter in 2021". NZ Herald. Retrieved 2020-08-20.
  10. ^ Braae, Alex (10 July 2020). "The Bulletin: Tiwai Point closing affects everything". The Spinoff. Retrieved 2020-08-20.
  11. ^ a b c Harding, Evan (1 September 2020). "Tiwai aluminium smelter proves to be a political hot potato". Stuff. Retrieved 2020-08-31.
  12. ^ a b Harding, Evan. "Tiwai aluminium smelter to stay open until end of 2024". Stuff. Archived from the original on 14 January 2021. Retrieved 14 January 2021.
  13. ^ a b "Tiwai Point aluminium smelter to keep operating until end of 2024". Radio New Zealand. 14 January 2021. Archived from the original on 14 January 2021. Retrieved 14 January 2021.
  14. ^ a b Pennington, Phil. "Smelter stockpiles 100,000 tonnes of hazardous waste near beach". Retrieved 9 July 2021.
  15. ^ Fox, Aaron (2001). "The power game : the development of the Manapouri-Tiwai Point electro-industrial complex, 1904-1969". Thesis, Doctor of Philosophy. University of Otago. Retrieved 1 January 2013.
  16. ^ "How Aluminium is Made" (PDF). New Zealand Aluminium Smelters Limited. Retrieved 12 January 2017.
  17. ^ a b "The economic and social impacts of New Zealand Aluminium Smelters Limited on the Southland economy" (PDF). New Zealand Aluminium Smelters Limited. 2013. Retrieved 2017-01-13.
  18. ^ Anthony, John (23 April 2015). "Tiwai Point profitable despite tough conditions". stuff.co.nz. Retrieved 2017-01-13.
  19. ^ "Aluminium record set in 2011". Radio New Zealand. 2012-02-02. Retrieved 2017-01-13.
  20. ^ a b "NZAS Facts". nzas.co.nz. New Zealand Aluminium Smelters Limited. Retrieved 2017-01-12.
  21. ^ a b Bennett, Adam (3 October 2007). "Meridian boss hails deal with smelter". New Zealand Herald. Archived from the original on 25 August 2011. Retrieved 24 August 2011.
  22. ^ "Sustainable Development Report 2015" (PDF). NZAS. Retrieved 2017-01-13.
  23. ^ "Webinar - Managing hazardous waste through the appropriation and exploitation of legally protected coastal marine areas". EIANZ. Retrieved 9 July 2021.
  24. ^ Pennington, Phil. "Rio Tinto takes on some cost of Tiwai Pt clean-up, but $200m of work still up in the air". Retrieved 9 July 2021.
  25. ^ a b Lin, Tao (19 May 2015). "Speculation that Rio Tinto's Tiwai Point smelter for sale". stuff.co.nz. Retrieved 2017-01-13.
  26. ^ Hunter, Tim (20 April 2015). "Tiwai Point aluminium smelter 'squarely in the black': analyst". stuff.co.nz. Retrieved 2017-01-13.
  27. ^ "Smelter's woes blamed on excess supply". 3 News NZ. April 3, 2013.
  28. ^ "Rio Tinto rejects Govt's subsidy offer". 3 News NZ. April 2, 2013.
  29. ^ Patrick Gower (28 March 2013). "Rio Tinto's threats over asset sales". 3 News.
  30. ^ Collette Devlin (30 March 2013). "Rio Tinto plays tough". The Southland Times.
  31. ^ Pattrick Smellie (28 March 2013). "Short-term subsidies only for smelter, Ryall says". BusinessDesk. Retrieved 28 March 2013.
  32. ^ "Rio Tinto's threats over asset sales". 3 News NZ. 28 March 2013.
  33. ^ Adam Bennett (2 April 2013). "Rio Tinto rejects Tiwai subsidy offer". The Herald. Retrieved 2 April 2013.
  34. ^ Tracy Watkins (2 April 2013). "Smelter firm subsidy talks stall". Fairfax NZ News. Retrieved 2 April 2013.
  35. ^ "Rio Tinto rejects Govt's subsidy offer". 3 News NZ. 2 April 2013. Retrieved 2 April 2013.
  36. ^ "John Key's Game of Two Halves". SST. April 7, 2013.
  37. ^ "Tim Shadbolt vows to save smelter". 3 News NZ. April 5, 2013.
  38. ^ a b "Govt pays $30 million to Tiwai Pt". Stuff.co.nz. 2013-08-08. Retrieved 2017-01-12.
  39. ^ "Rio Tinto 'not bluffing' about threat to shut Tiwai Point smelter". stuff.co.nz. 30 October 2019. Retrieved 31 Mar 2020.
  40. ^ Harding, Evan (25 March 2020). "Coronavirus: Tiwai Point aluminium smelter exempted from lockdown". Stuff. Retrieved 9 July 2020.
  41. ^ "Rio Tinto to close one of four potlines at Tiwai Point aluminium smelter". stuff.co.nz. 31 March 2020. Retrieved 31 Mar 2020.
  42. ^ "National promises at least five years of Tiwai Pt smelter". RNZ. 2020-08-28. Retrieved 2020-08-29.
  43. ^ "National's plan to save Tiwai - Rio Tinto responds". Stuff. 28 August 2020. Retrieved 2020-08-28.
  44. ^ Moir, Jo (9 September 2020). "NZ First leader Winston Peters to meet with Tiwai Point aluminium smelter workers". RNZ. Retrieved 2020-09-11.
  45. ^ Moir, Jo (10 September 2020). "Winston Peters: Tiwai Point an NZ First 'bottom line'". RNZ. Retrieved 2020-09-11.
  46. ^ Small, Zane (16 July 2020). "Jacinda Ardern distances herself from Winston Peters' call to save Tiwai Point smelter from closure". Newshub. Retrieved 2020-09-11.
  47. ^ ZB, Newstalk. "PM details rescue plan for Southland jobs after Tiwai Point closure". ZB. Retrieved 2020-09-11.
  48. ^ "Labour commits to Tiwai Pt aluminium smelter extension negotiations". RNZ. 2020-09-28. Retrieved 2020-09-28.

External links[]

Coordinates: 46°35′21″S 168°23′02″E / 46.589184°S 168.384022°E / -46.589184; 168.384022

Retrieved from ""