Transportation in Lagos

From Wikipedia, the free encyclopedia

Transportation in Lagos is by four ways: road, water, rail and air.

Transportation by Rail[]

Lagos Rail Mass Transit
Overview
OwnerLagos State Managed by Eko Rail under a Concession Agreement
LocaleLagos, Nigeria
Transit typeRapid Transit
Operation
Began operation2014 (projected)
Operator(s)Lagos Metropolitan Area Transport Authority (LAMATA)
Number of vehiclesHS H5 series cars (Blue Line)
Technical
System length35 km (22 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
hide
Blue & Red Lines
Legend
Agbado
Iju
Agege
Ikeja
Shogunle
Airport
Murtala Muhammed International Airport
Mafoluku
Ajao Estate
Oshodi
Mushin
Jibowu
Yaba
Ebute Metta
Depot
Okokomaiko
LASU
Trade Fair
Festac Town
National Theatre
Iddo Mainline rail interchange
Ebute Ero
Marina

Lagos Rail Mass Transit is a system being developed and under construction in Lagos, Nigeria. The system (the first modern rail-based public transport in Sub-Saharan Africa outside of South Africa) is being sponsored by the Lagos Metropolitan Area Transport Authority (LAMATA) and is envisioned to consist eventually of seven lines.[1] The railway equipment including electric power, signalling, rolling stock, and fare collection equipment will be provided by the private sector under a Concession Contract. LAMATA is responsible for policy direction, regulation, and infrastructure for the network.[2]

The concessionaire will generate its own dedicated electricity.[3] The first section of the network (Phase I of the Blue Line) was scheduled to enter revenue service by the first quarter of 2014,[1] but had not yet opened as of September 2014, amid delays.[4]

Timeline[]

2008 – A metro is proposed for Lagos, allegedly with a completion date of 2011.
2009 – Construction commences on the Blue Line.[1]
2010 – Lagos Rail Mass Transit to proceed.[citation needed]
2014 – Phase I (the Blue Line from Marina to Okokomaiko) set to open in the first quarter of 2014.[1]

History[]

The Lagos tramway ran from 1902 to 1933.[5] The passenger line was one of the earliest public transport system built within Lagos, carrying travelers, traders and workers from the train station at Iddo going to Lagos Island.[5]

The idea of developing rapid transit in Lagos dates from the 1980s with the Lagos Metroline network conceived by the Alhaji Lateef Jakande during the Second Nigerian Republic.[6] The initial Metroline project was scrapped in 1985 by Muhammadu Buhari at a loss of over $78 million to the Lagos tax payers.[7] The idea of developing a light rail network for Lagos was revived by Governor Bola Tinubu in the early 2000s with a formal announcement of its construction in December 2003.[8]

This initial $135 million proposal was part of the greater Lagos Urban Transportation Project to be implemented by the newly formed Lagos Metropolitan Area Transport Authority (LAMATA).[8] LAMATA initially concentrated on developing a Bus Rapid Transit system, running from Mile 12 to Lagos Island. In 2008, LAMATA began also to make progress with the rail project, focusing initially on the Blue Line and the Red Line.

Rolling stock[]

In September 2011, LAMATA announced that it would acquire some H5-series subway trains formerly used by the Toronto Transit Commission (TTC). The cars are being refurbished in the United States and converted to standard gauge before being imported and put into service on the Blue and Red lines. The same contract also included an option for some H6-series subway cars from the TTC, however this has since been cancelled.[9][10][11][12] The trains were built as two-unit married pairs[13] with a driver's cab in the front right corner of each car.[14]

Routes[]

Okokomaiko-Marina Blue Line[]

In April 2008, the Lagos State Government approved 70 billion for construction of the Okokomaiko-Iddo-Marina Line, with an estimated completion date of 2011.[2] Advisory services are being provided by CPCS Transcom Limited, an Infrastructure Development consulting firm based in Ottawa, Canada. Construction actually commenced in January 2010, and completion is now expected in 2015.[15]

The Blue Line is now being built by China Civil Engineering Construction Corporation. The Blue Line will run 27.5 km from Marina to Okokomaiko, with 13 stations. End-to-end journey time will be approximately 35 minutes. It is being built as a high capacity, electrically powered rail mass transit system. Most of the route will be on the surface, running east-west, in the central reservation of the rebuilt Badagry Expressway between Igbo-Elerin Road (Okokomaiko) and Iganmu.

The line will run on elevated structure from Iganmu along the south side of the expressway passing the junction with Eric Moore Road, crossing just south of the National Theatre to Iddo, then south to Lagos Island with a terminal at Marina. Construction is underway between National Theatre and Mile 2. A Maintenance and Storage Facility (MSF) will be constructed at Okokomaiko, with a track connection from the Blue Line to the depot.

The entire Blue Line will operate over a secure and exclusive right-of-way, with no level crossings and no uncontrolled access by pedestrians or vehicles. Lagos State is financing construction of the Blue Line from its own resources. A concession contract is being awarded to finance, supply and operate the railway equipment, including electric power, signalling, trains, and fare collection.

Agbado-Marina Red Line[]

The second line, the Red Line, will run from Marina to Agbado.[15] The line will share the existing 30 metre wide Nigerian Railway Corporation (NRC) right-of-way.[1]

Other lines[]

LAMATA has long term plans to build up to seven lines.[15]

See also[]

References[]

  1. ^ Jump up to: a b c d e "Lagos Rail Mass Transit". Lagos Metropolitan Area Transport Authority. 2014. Archived from the original on 2016-12-01. Retrieved 2014-03-02.
  2. ^ Jump up to: a b Bisiriyu, Rasheed (April 11, 2008). "N70bn Lagos light rail ready in 2011". The Punch.
  3. ^ "Lagos Light Rail". Railways Africa Magazine. 2010-12-12. Retrieved 2010-12-12.
  4. ^ "Eyebrows Raised Over Stalled $1bn Light Rail Project In Lagos".
  5. ^ Jump up to: a b Miller, Nevil (1966). "Lagos steam tramway and its unique locomotives',". The Railway Magazine. 115: 103–106. ISSN 0033-8923.
  6. ^ "Turning Lagos Into a Megacity". PM News. April 14, 2004.
  7. ^ Farukanmi, Olorunnimbe (January 24, 2003). "Battle of Generals". Vanguard.
  8. ^ Jump up to: a b Momodu, Shaka (December 3, 2003). "Lagos Launches $135m Rail System". This Day.
  9. ^ Kalinowski, Tess (2011-09-06). "TTC subway cars bound for Nigeria". Toronto Star. Retrieved 2012-12-05.
  10. ^ "Eko Rail's Trains Begin Journey to Lagos". PR Newswire. 2011-09-27. Retrieved 2012-12-05.
  11. ^ "Report on sales of surplus assets" (PDF). Toronto Transit Commission. 2009-05-28. Retrieved 2013-06-15.
  12. ^ "First subway cars leave Toronto for Lagos". International Railway Journal. 2011-09-28. Archived from the original on 2011-10-03. Retrieved 2013-06-15. The Blue Line is expected to carry 300,000 passengers a day with trains running at 5-minute headways.
  13. ^ "Lagos settles for refurbished subway cars for its light rail project". . 2011-05-11. Archived from the original on 2013-10-26. Retrieved 2013-06-14. Subway cars — equivalent of trains — are series of connected railroad cars used for intra city (urban) transportation, usually underground and operated by electricity.
  14. ^ "Toronto Transit Commission 5670-5807". . Retrieved 2013-06-14.
  15. ^ Jump up to: a b c The Report: Nigeria 2012. . 2012. ISBN 9781907065668. Retrieved 2013-06-15. Also under development is the Lagos light rail network, which will be regulated by LAMATA. The $1.2bn contract to build the Blue Line, which will run 27.5 km through 13 stations from Okokomaiko to Marina, was awarded to the China Civil Engineering Construction Corporation. In anticipation of the Blue Line's 2015 completion, Nigerian firm Eko Rail has bought 255 subway cars from Canada's Toronto Transit Commission. Also being developed is the 30-km Red Line, to run between Marina and Agbado. LAMATA hopes to later add five more lines, to be serviced by Eko Rail.

External links[]

Retrieved from ""