Auburn Maintenance Centre
Location | |
---|---|
Location | Auburn |
Characteristics | |
Owner(s) | Transport Asset Holding Entity |
Operator(s) | Downer Rail |
Roads | 7 |
Rolling stock | A sets B sets M sets |
History | |
Opened | 24 July 2010 |
The Auburn Maintenance Centre is a train depot operated by Downer Rail responsible for the maintenance of the Sydney Trains A, B and M set fleets.
History[]
As part of the contract to build and maintain the Sydney Trains A sets, John Holland built a depot on the site of the former Clyde Marshalling Yards adjacent to the MainTrain facility.[1][2][3] It was opened by Minister for Transport John Robertson on 24 July 2010.[4]
On 20 September 2014, an 11 road stabling facility was established to the south-east of the facility. Provision has been made for an extra five roads.[5][6] In February 2017, it was revealed that subsidence had occurred underneath the depot after plastic cells had failed. Remediation costs have been estimated as high as $70 million.[7][8]
During 2018, maintenance of the Sydney Trains M set fleet was moved to Auburn from Eveleigh Railway Workshops.[citation needed]
Description[]
The maintenance centre building has seven roads. It has stabling facilities on ether side with the whole facility stretching for two kilometres.[2]
Maps[]
References[]
- ^ John Holland awarded Auburn Maintenance Facility contract Railway Digest March 2007 page 9
- ^ Jump up to: a b The Centre Reliance Rail
- ^ Reliance Rail PPP Train Maintenance Facility Leighton Holdings
- ^ Annual Report year ended 30 June 2010 RailCorp
- ^ Signaling & infastructure Railway Digest November 2014 page 42
- ^ Auburn Stabling Transport for NSW
- ^ John Holland on the hook as ground sags under Sydney's Waratah rail shop Australian Financial Review 3 February 2017
- ^ Redmediation work required at Sydney's Waratah Maintenance Centre Railway Digest April 2017 page 5
- Railway workshops in New South Wales
- Sydney Trains
- Transport infrastructure completed in 2010
- 2010 establishments in Australia