Balboa Avenue Transit Center
(Redirected from )
Balboa Avenue Transit Center | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() Station platform | |||||||||||
Location | 3690 Morena Blvd San Diego, California | ||||||||||
Coordinates | 32°48′21″N 117°12′50″W / 32.8057°N 117.2140°WCoordinates: 32°48′21″N 117°12′50″W / 32.8057°N 117.2140°W | ||||||||||
Owned by | San Diego Metropolitan Transit System | ||||||||||
Operated by | San Diego Trolley | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | ![]() | ||||||||||
Construction | |||||||||||
Structure type | At-grade | ||||||||||
Parking | 227 spaces[2] | ||||||||||
Disabled access | ![]() | ||||||||||
Other information | |||||||||||
Station code | 77774, 77775[3] | ||||||||||
History | |||||||||||
Opened | November 21, 2021 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
![]() |
Balboa Avenue Transit Center is a San Diego Trolley station in San Diego, California. The station is located along Balboa Avenue between Interstate 5 and Morena Boulevard.[4] Service began on November 21, 2021[5] after the completion of the Blue Line Mid-Coast Trolley extension project.[6]
The City, with input from the Pacific Beach and Clairemont Mesa community planning groups, approved the Balboa Station Area Specific Plan in September, 2019.[7]
Artwork from the nearby former Home Savings and Loan building could be incorporated into the station. The Chase bank plans to demolish its building, built in 1977, with eight mosaics by Millard Sheets on the exterior.[8]
Station layout[]
There are two tracks, each served by a side platform.
Side platform, doors will open on the right | |
Northbound | ← ![]() |
Southbound | ![]() |
Side platform, doors will open on the right |
References[]
- ^ "San Diego Regional Transit Map" (PDF). San Diego Metropolitan Transit System. November 2021. Retrieved November 21, 2021.
- ^ "UC San Diego Blue Line station list". San Diego Metropolitan Transit System. Retrieved 2021-11-21.
- ^ "Schedules & Real Time". San Diego Metropolitan Transit System. Retrieved November 21, 2021.
- ^ "Clairemont Drive Station to north of Balboa Avenue Station". San Diego Association of Governments (SANDAG). keepsandiegomoving.com. Retrieved June 18, 2020.
- ^ "It's finally here: Riders take first trips on trolley extension with 9 new stops". Fox 5 San Diego. San Diego. November 21, 2021. Retrieved November 21, 2021.
- ^ "Mid-Coast Corridor Transit Project". SANDAG. Retrieved 2016-04-17.
- ^ RRM Design Group; Kimley-Horn and Associates; Evari GIS Consulting; HR&A Advisors (2019-09-10). Balboa Avenue Station Area Specific Plan, City of San Diego 2019 (PDF) (Report). Retrieved 2021-07-20.
- ^ Butler, Sara (2020-07-30). "Could Chase Bank mosaics in Pacific Beach soon leave the neighborhood? Efforts are underway to save them". PB Monthly. Retrieved 2020-07-31.
Categories:
- San Diego Trolley stations in San Diego
- Railway stations in the United States opened in 2021
- California railway station stubs