Beijing–Baotou railway

From Wikipedia, the free encyclopedia
Beijing–Baotou railway
长城号列车与樱花 20210330083408.jpg
Aerial view of the NDJ3 DMU trainset along the Beijing–Baotou railway.
Overview
Other name(s)Jingbao railway
StatusOperational
OwnerChina Railway
LocaleNorth China
Termini

Baotou
Stations89
Service
Type
System
Operator(s)
History
CommencedBetween 1905–1909
Opened24 September 1909 (1909-09-24)
Technical
Line length834 km (518 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV/50 Hz AC overhead
Operating speed100 km/h (62 mph)
Route map

Legend
km
elev
0
Beijing North
4
Qinghuayuan
Wudaokou crossing
11
Qinghe
21
Shahe
original Beijing Northwest Ring Railway
to Sanjiadian
31
Changping
Actual origin
40
Nankou
46
Dongyuan
50
Juyongguan
54
Sanpu
Qinglong Bridge, zig zag railway
Qinglong Bridge, zig zag railway
61
Badaling
Xibozi
(S2) to Yanqing
70
Kangzhuang
79
Donghuayuan
Guishui river bridge
over Guanting Reservoir
90
Langshan
Tumu
single-track unelectrified
two-track electrified
from Fengsha and Daqin lines
105
Shacheng
114
Xinbaoan
122
Xibali
130
Xiahuayuan
Xinzhuangzi
and
155
Xuanhua
Shalingzi East
170
Shalingzi
Left arrow
(planned)
to Beijing–Zhangjiakou intercity railway
180
Zhangjiakou
Zhangjiakou Railway
Zhangjiakou South railway station
Zhangjiakou (former end of
Beijing-Zhangjiakou Railway)
193
Kongjiazhuang
Down arrow
Wangyuzhuang
210
Guoleizhuang
224
Chaigoubu
Xiwanbu
254
Yongjiabao
Xiaxiaobao
272
Tianzhen
Luowenzao
301
Yanggao
Wangguanrentun
Julebao
342
Zhoushizhuang
Right arrow link to Datong–Qinhuangdao railway
Left arrow (coal line)
353
Datong East
358
Datong
Gudian
371
Gushan
389
Baoziwan
Wutaiwa
403
Fengzhen
Jiandi
419
Xin'anzhuang
428
Yongwangzhuang
439
Hongshaba
Suojiacun
454
Tuguiwula
Naji
470
Suji
478
Guyingpan
485
Jining South
Up arrow
493
Hulu
left line assigned to
Sanchakou
512
Basumu
523
Shibatai
Hala
537
Magaitu
545
Gujiabao
Zhuozi East
551
Zhuozishan
565
Fushengzhuang
Anju
580
Sandaoying
Mengguying
593
Qixiaying
604
Minzu
left line assigned to
612
Taobuqi
right line assigned to
Guojiaying
Baita
Nandian
Hohhot
Youyouban
Taigemu
Actual end
Down arrow
Dalibao
693
Bikeqi
706
Chasuqi
Songla
724
Taosihao
Sanbashu
742
Meidaizhao
Laozang
760
Salaqi
774
Gongjiban
789
Dongxing
Guchengwan
804
Baotou East
and
812
Wanshuiquan
820
Baotou
and

The Beijing–Baotou railway or Jingbao railway (simplified Chinese: 京包铁路; traditional Chinese: 京包鐵路; pinyin: Jīngbāo Tiělù) is an 833 km (518 mi) railway from Beijing to Baotou, Inner Mongolia, functioning as an important route in North China. It was the first railway in China designed and built by Chinese. It passes through a famous section of the Great Wall at Badaling. It is now largely paralleled by Beijing–Zhangjiakou intercity railway and Zhangjiakou–Hohhot high-speed railway.

In 2019, with the opening of the Beijing–Zhangjiakou intercity railway, the Beijing–Baotou railway adjusted the mileage. The ordinary-speed line from Changping to Shahe was merged into the Shuangqiao–Shahe Railway (Beijing Northeast Ring railway). The actual starting point of the Beijing–Baotou railway was shortened to the south side of Changping, the section from Changping to Beijing North is considered part of Beijing–Zhangjiakou intercity railway.

History[]

The first section of the Beijing–Baotou railway, the Imperial Peking–Kalgan railway (now the "Jingzhang" railway) was constructed between 1905 and 1909, connecting Beijing with Zhangjiakou (Kalgan). This section was the first railway designed and built by Chinese. The chief engineer is Zhan Tianyou. He overcame the steep gradient near Badaling using a switchback. Due to his achievement in constructing this railway, Zhan (Jeme) is called the father of China's railways.

The railway was extended from Zhangjiakou to Hohhot by 1921 and to Baotou by 1923.

Even with the switchback, the gradient near Qinglongqiao railway station is still at 3.3%. In addition, travelling through the switchback is slow. A bypass route, the Fensha railway, was built in the 1950s between Fengtai and Shacheng along the Yongding river. This route was considered but dropped by Zhan due to high construction cost. Before the 1990s, the Fengsha railway was mainly used to transport freight, and the original Jingzhang railway was focused on passenger transport. Now, trains to/from Baotou have changed to use the Fengsha railway instead.

The Beijing–Zhangjiakou intercity railway and the Zhangjiakou–Hohhot high-speed railway, which both opened on 30 December 2019, parallel most of the line.

To improve the freight capacity of , those two railway lines exchange their main line between Hulu railway station and Taobuqi railway station in September 2020, separating the freight and passenger corridors. Meanwhile the section between Taigemu railway station and Baotou railway station was also assigned to which has been renamed as .[1]

Current operations[]

The main route that deviates via the Fengsha railway is a double-track, electrified line. The section between Jining South and Baotou is quadruple track. The section between Changping and Shacheng is not electrified and mainly single-track. It is now used by little traffic. Freight and long-distance passenger services run via the Fengsha railway. 13 express services run each way between Beijing and Baotou each day, taking approximately 11 hours, stopping in Xuanhua, Zhangjiakou, Datong, Jining South, Hohhot and Baotou.

Line S2[]

Line S2 services of the Beijing Suburban Railway between Huangtudian (running via the Beijing Northeast Ring railway and connecting to the Jingbao railway between Qinghe and Shahe) and Badaling (the station for visiting the Great Wall) continue to use the Jingbao Railway, reversing at Qinglongqiao West station on the western switchback on the journey towards Badaling and at Qinglongqiao main station on the eastern switchback on their way back towards Beijing. The stops at Qinglongqiao are service stops, not advertised passenger stops and the doors remain closed.

From 2008 to 2016, the S2 services operated hourly from Beijing North to Yanqing and Shacheng. From 2016 to 2019, the S2 services operated hourly from Huangtudian to Yanqing and Shacheng. Since the opening of the Beijing–Zhangjiakou intercity railway in 2019, the S2 service has been reduced to four daily services between Huangtudian and Badaling, stopping only in Nankou. On Fridays to Mondays and public holidays, an additional service runs between Huangtudian and Shacheng, stopping only in Badaling and Kangzhuang.[2] These services are the only regular traffic on the unelectrified line east of Shacheng and are operated using diesel multiple units. S2 services formerly continued from Badaling over the short single-track (Kangyan railway) to Yanqing. From March 30, 2020 to June 30, 2020, the Kangzhuang–Yanqing railway is temporarily closed.

Stations and mileage[]

Some of the following stations are now disused.

Major Station Mileage (km)
Beijing (北京) 0
Shacheng (沙城) 121
Xuanhua (宣化) 171
Zhangjiakou South (张家口南) 196
Datong (大同) 374
Jining south (集宁南) 501
Hohhot (呼和浩特) 659
Baotou (包头) 824

Gallery[]

See also[]

References[]

  1. ^ Na, WEI. "Tanghu railway finish hub renovation project". China Renminwang (in Chinese). PeopleCN.
  2. ^ "自2020年4月4日起,S2线部分车次列车开行时点有所调整" [Since April 4, 2020, the timing of some trains on the S2 line has been adjusted] (in Chinese). Beijing Suburban Railway. 4 April 2020. Retrieved 14 June 2020.
Retrieved from ""