Choa Chu Kang West MRT station
JS2
Choa Chu Kang West 蔡厝港西 சுவா சூ காங் வெஸ்ட் Choa Chu Kang West | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | ||||||||||||||||
Owned by | Land Transport Authority | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | Island | |||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Platform levels | 1 | |||||||||||||||
Bicycle facilities | Yes | |||||||||||||||
Disabled access | Yes | |||||||||||||||
History | ||||||||||||||||
Opening | 2027 | |||||||||||||||
Electrified | Yes | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
Location | ||||||||||||||||
Choa Chu Kang West Choa Chu Kang West station in Singapore |
Choa Chu Kang West MRT station is a proposed Mass Rapid Transit (MRT) station on the Jurong Region line in Choa Chu Kang, Singapore. There will be two station names in the JRL naming exercise - Brickland and Choa Chu Kang West.[1][2][3]
History[]
On 9 May 2018, LTA announced that Choa Chu Kang West station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2027.[4]
Contract J102 for the design and construction of Choa Chu Kang West Station and associated viaducts was awarded to Shanghai Tunnel Engineering Co. (Singapore) Pte Ltd at a sum of S$465.2 million. Construction started in 2020, with completion expected in 2027.[5] Contract J102 also includes the design and construction of Choa Chu Kang station and Tengah station, and associated viaducts and A&A works to the existing Choa Chu Kang station complex.[6]
Initially expected to open in 2026, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2027.[7]
Location[]
The station will be straddled over the existing Choa Chu Kang Avenue 3, just east of the junction with Choa Chu Kang Avenue 1. It is located within the Choa Chu Kang planning area between the Keat Hong and Peng Siang Subzones,[8] nested within an existing housing estate, near to Sunshine Place.
Access to the station will be via 2 exits, 1 of each side of Choa Chu Kang Avenue 3.[9]
References[]
- ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Residents and students welcome Jurong Region Line but find it confusing". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Tender information | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- ^ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Retrieved 24 March 2021.
- ^ "Singapore's Jurong West Planning Area". Key Location. Retrieved 21 September 2019.
- ^ "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
- Mass Rapid Transit (Singapore) stations
- Proposed railway stations in Singapore
- Railway stations scheduled to open in 2027