Erligou station
![]() The construction site in October 2021 | |
Location | Chegongzhuang West Road / Chegongzhuang Street and Sanlihe Road Haidian District / Xicheng District border, Beijing China |
Coordinates | 39°55′52″N 116°19′38″E / 39.931025°N 116.327294°ECoordinates: 39°55′52″N 116°19′38″E / 39.931025°N 116.327294°E |
Operated by | Beijing Mass Transit Railway Operation Corporation Limited Beijing MTR Metro Line 16 Corp. Ltd. |
Line(s) | Line 6 (not opened) Line 16 (not opened) |
History | |
Opened | 2022 (both lines)[1] |
Location | |
![]() ![]() Erligou Location in central Beijing |
Erligou station (simplified Chinese: 二里沟站; traditional Chinese: 二里溝站; pinyin: Èrlǐgōu Zhàn) is a station under construction on Line 6 and Line 16 of the Beijing Subway.[2]
History[]
Erligou station did not enter into operation along with Line 6 Phase I on December 30, 2012. Both Line 6 and Line 16 platforms will open in Late 2022.[1] The platform for Line 16 will be built above the Line 6 platform.[3]
Location[]
The station will be located at the intersection of the north-south Sanlihe Road with the east-west thoroughfare known as Chegongzhuang West Road (车公庄西路) to the west of Sanlihe Road and Chegongzhuang Street (车公庄大街) to the east.[4]
Station Layout[]
Both the line 6 and line 16 stations use underground side platforms.
References[]
- ^ a b "市重大项目办协调加快推进地铁二里沟站建设". Retrieved 2021-05-31.
- ^ 地铁6号线一期沿线站名确定. Beijing Daily. 2010-11-12. Archived from the original on 2013-12-24. Retrieved 2013-03-19.
- ^ 北京地铁16号线车站设计方案展示 (in Simplified Chinese). 2013-04-25. Archived from the original on 2013-10-07. Retrieved 2014-12-30.
- ^ 6号线16号线增二里沟换乘站. 163.com news. 2012-02-09. Archived from the original on 2018-07-27. Retrieved 2012-02-24.
Categories:
- Beijing Subway stations in Haidian District
- Beijing Subway stations in Xicheng District
- Railway stations under construction in China
- Beijing Subway stubs