Line 16 (Beijing Subway)

From Wikipedia, the free encyclopedia

Line 16
BJS Line 16 icon.svg
L16 336@BCR (20160905092327).jpg
Line 16 train under test at China National Railway Test Centre
Beijing MTR
Overview
Other name(s)M16 (planned name)
StatusOperational
LocaleXicheng and Haidian District
Beijing
TerminiBei'anhe
Ganjia Kou
Stations15 (in operation)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing MTR Metro Line 16 Corp., Ltd.
Depot(s)Beianhe
Rolling stock8-car Type A (DKZ93, SFM40)
Daily ridership140,000 (2021 first half, peak)[1]
History
Opened31 December 2016; 4 years ago (2016-12-31)
Technical
Line length30.5 km (19.0 mi)[2][3] (in operation)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h[4]
Route map

Legend
Beianhe depot
Bei'anhe
Jingmi diversion canal
Wenyang Lu
Sanxingzhuanghou river
Daoxianghu Lu
Dongbutou flood canal
Tundian
Tundian flood ditch
Hongfeng canal
Yongfeng
Wuyi canal
Yongfeng Nan (S)
Xibeiwang
Malianwa
Nongda Nanlu
Qing river
Xi Yuan
Wanquanhe Qiao
Wanquan river
Suzhou Jie
Left arrow outer – inner Right arrow
Suzhou Qiao
Line 12 (to be opened 2022)
Left arrowRight arrow
Wanshou Si
Nanchang river and Zizhuyuan lake
National Library
Nanchang river
Erligou (not opened)
Ganjia Kou
Line 3 (under planning)
Left arrow TiancunRight arrow
section below to be opened 2021
Yuyuantan East Gate
Muxidi
Yongding River diversion canal
Daguanying
Left arrow Beijing West railway stationHuazhuang Right arrow
Hongliannanli
Lianhua river
Lize Business District
Line 14 (to be opened 2021)
Daxing Airport Express (to be opened 2022)
Fengcao river
Dongguantou Nan (S)
Fengtai railway station
Jinghu railway etc.
Left arrow inner – outer Right arrow
Fengtai Nanlu
Fufengqiao
Jinghu railway
Kandan
Yushuzhuang
Yushuzhuang yard
Yushuzhuang North
marshalling yard
Wanpingcheng
The exterior of the Malianwa Station

Line 16 of the Beijing Subway (Chinese: 北京地铁16号线; pinyin: běijīng dìtiě shíliù hàoxiàn) is a rapid transit rail line in Beijing. Currently, the line is 30.5 km (19.0 mi) in length with 15 stations.[2][3] It will be 49.8 km (30.9 mi) with 30 stations when fully completed.[5] The line is fully underground.

Construction began in December 2013. The northern section, from Bei'anhe to Xi Yuan was opened on 31 December 2016.[2] An infill station, Nongda Nanlu was opened on December 30, 2017.[5]

The line is operated by the Beijing MTR Corporation Limited and uses CNR Changchun DKZ93 and CSR Sifang SFM40 eight-car high-capacity wide-body Type A trains.[6] Line 16's color is dark-moderate green.

Route[]

The line starts at the west end of Beiqing Road (北清路) just outside of the 6th Ring Road and follows the road east to Yongfeng Road (永丰路) where it turns south towards the city. Line 16 follows Yongfeng Road south to Xi Yuan, its former terminus. The line then continues south to the National Library station and Ganjia Kou.

History[]

Route diagram inside a Line 16 train before the opening of its middle section

In 2009, Line 16 was among the 198 major urban planning projects listed by the city’s development and reform commission.[7] At that time, Line 16 was slated to run about 35 km (22 mi) from Huilongguan in Changping District to Huaxiang in Fengtai District.[7]

According to the June 2010 plans, the northern section of Line 16 will replace the originally planned Line 4 northern extension and run 48 km (30 mi) from Beianhe in Haidian District south to Xiaoyueyuan near the Marco Polo Bridge in Fengtai District.[8] The line would begin near Beianhe, and provide access to parts of Haidian, north of the foothills the Western Hills that extend into district. For this reason, that section of the line was also referred to as the Haidian Shanhou (literal translation Haidian Back Mountain) Line because it begins on the backside of the low-lying range that extends from the Fragrant Hills to the Summer Palace.[8] Points of interest that the line may pass along route to Xiaoyueyuan in the south include the Summer Palace, Haidian Gymnasium, National Library, Purple Bamboo Park, Beijing Zoo, Chegongzhuang West Road, Sanlihe, Wanshou Temple, Lize Business District, and the Fengtai railway station.[8] The proposal was scaled back with the removal of the Haidian Shanhou section in December 2010, reducing the line to just 23 km (14 mi), from Suzhoujie to Wanping. But the northern section was subsequently restored months later, bringing the line length 49 km (30 mi).[9]

The Beijing Municipal Commission of Urban Planning released the plans for several subway stations in 2013.[10] Construction of the line began in December 2013.[11]

The northern section, from Bei'anhe to Xi Yuan, except for Nongda Nanlu, opened on December 31, 2016.[2] Nongda Nanlu opened on December 30, 2017.[5] In April 2020, Beijing Municipal Commission of Development and Reform decided to build an infill station on Line 16: Yushuzhuang North.[12]

On December 31, 2020, the middle section from Xi Yuan to Ganjia Kou opened.[3] (Suzhou Jie and Erligou stations were not opened)

Segment Commencement Length Station(s) Name
Bei'anhe — Xi Yuan 31 December 2016 19.6 km (12.18 mi)[2] 9 Northern section
Nongda Nanlu 30 December 2017 Infill station 1
Xi Yuan — Ganjia Kou 31 December 2020 10.9 km (6.77 mi)[3] 5 Middle section

Future Development[]

The southern section from Ganjia Kou to Wanpingcheng will open in 2022.[13]

List of Stations[]

List of stations from north to south.

Station Name[14] Connections Nearby Bus Stops Distance
km[15]
Location
English Chinese
Bei'anhe 北安河 544 专16 专99 0.000 0.490 Haidian
Wenyang Lu 温阳路 330 544 633 642 651 902 908 2.653 3.143
Daoxianghu Lu 稻香湖路 448 543 544 902 专54 2.310 5.453
Tundian 屯佃 303 512 543 544 575 902 2.352 7.805
Yongfeng 永丰 446 512 543 544 575 902 1.960 9.765
Yongfeng Nan (S) 永丰南 365 384 438 570 575 623 902 908 1.315 11.080
Xibeiwang 西北旺 333 384 438 570 575 623 902 908 909 专143 2.108 13.188
Malianwa 马连洼 305 328 333 362 438 449 476 509 518 575 608 623 644 651 932 2.195 15.383
Nongda Nanlu 农大南路 305 333 362 393 437 438 476 509 575 608 636 644 651 688 专28 1.517 16.900
Xi Yuan 西苑  4  129 303 331 332 333 346 384 393 394 432 437 438 476 508 534 563 579 584 601 608 610 636 644 671 686 688 夜8 2.690 19.590
Wanquanhe Qiao 万泉河桥 374 400 528 982 983 1.980 21.570
Suzhou Jie 苏州街  10 
Suzhou Qiao 苏州桥 26 74 323 355 361 365 368 374 425 450 563 603 608 610 614 634 651 688 921 夜30 2.983 24.553
Wanshou Si 万寿寺 74 300 323 362 368 374 394 450 481 534 603 610 634 645 夜30 1.610 26.163
National Library 国家图书馆  4   9  86 92 129 305 320 332 481 563 609 653 658 695 夜8 1.721 27.884
Erligou 二里沟  6  Haidian / Xicheng
Ganjia Kou 甘家口 10 61 101 102 103 114 121 320 612 686 夜12 2.635 30.519
Yuyuantan East Gate 玉渊潭东门
Muxidi 木樨地  1  Haidian
Daguanying 达官营  7  Xicheng
Hongliannanli 红莲南里
Lize Business District 丽泽商务区  14   Daxing Airport  Fengtai
Dongguantou Nan (S) 东管头南  Fangshan 
Fengtai railway station 丰台站  10 
Fengtai Nanlu 丰台南路  9 
Fufengqiao 富丰桥
Kandan 看丹
Yushuzhuang 榆树庄
Yushuzhuang North 榆树庄北
Wanpingcheng 宛平城

Rolling Stock[]

Model Image Manufacturer Year Built Amount in Service Fleet Numbers Depot
DKZ93 305 leaving Xibeiwang (20210119184844).jpg CRRC Changchun Railway Vehicles 2016 35 301–335 Beianhe
SFM40 L16 336@BCR (20160905092327).jpg CRRC Qingdao Sifang 29 336–364
Formation
 
← Bei'anhe
Ganjia Kou →
Car No. 1 2 3 4 5 6 7 8
Designation Tc1 Mp1 M1 Mp3 M3 M2 Mp2 Tc2

References[]

  1. ^ "ANNOUNCEMENT OF UNAUDITED RESULTS FOR THE SIX MONTHS ENDED 30 JUNE 2021" (PDF). MTR Corporation. 12 August 2021. p. 36. Retrieved 14 August 2021. The Northern and Middle sections of BJL16 recorded approximately 21 million passenger trips and average weekday patronage of approximately 140,000 in the first half of 2021
  2. ^ Jump up to: a b c d e "北京地铁16号线北段今开通运营 全程运行31分钟". 31 December 2016.
  3. ^ Jump up to: a b c d "明日起,地铁房山线北延、16号线中段和有轨电车T1线开通试运营!". 30 December 2020.
  4. ^ ""史上最能装"地铁车将进京 最大载客3560人". 28 January 2015.
  5. ^ Jump up to: a b c "16号线". mtr.bj.cn.
  6. ^ 北京地铁新线将用新编组可提高运能70%. Sina News. 25 April 2013. Retrieved 12 July 2013.
  7. ^ Jump up to: a b (Chinese) "北京地铁16号线初定重要站点 拟过动物园、国图等" 北京晚报 2010-06-29
  8. ^ Jump up to: a b c (Chinese)"北京地铁16号线城西贯通南北" 法制晚报 Archived 2011-07-07 at the Wayback Machine 2010-06-29
  9. ^ (Chinese) "北京地铁16号线规划方案获批复 起点为苏州街站" 人民网(北京) 2010-12-29
  10. ^ (Chinese) "北京地铁16号线车站设计方案展示" Archived 7 October 2013 at the Wayback Machine 2013-4-25
  11. ^ (Chinese) 北京地铁16号线丰台段正式开工 共设8座车站 2013-12-11
  12. ^ "北京地铁16号线工程新增榆树庄北站(方案设计、初步设计、施工图设计)招标公告" (in Chinese). 20 April 2020. Retrieved 21 April 2020.
  13. ^ "北京地铁16号线南段开通时间". Retrieved 21 January 2021. 南段(甘家口站(不含)至宛平城站)计划力争2022年底开通运营
  14. ^ "北京城市轨道交通线网图". Retrieved 31 December 2020.
  15. ^ "16号线路网车站站间距信息 - 北京京港地铁有限公司". Beijing MTR Corporation Limited. Retrieved 7 February 2021.

Sources[]

"北京地铁16号线工程环境影响报告信息公告". 铁道第三勘察设计院集团有限公司. 8 April 2011. Retrieved 10 April 2011.

"北京地铁16号线工程环境影响报告书简本". 铁道第三勘察设计院集团有限公司. 26 October 2012. Retrieved 27 October 2012.

"地铁下月开工16号线". 京华时报、京华网. 17 February 2013.

"北京地铁十六号线二期(原海淀山后线)工程环境影响评价信息二次公示". 铁道第三勘察设计院集团有限公司. 10 December 2013. Retrieved 10 December 2013.

Retrieved from ""